ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates

Slides:



Advertisements
Similar presentations
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Advertisements

Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
The Western Electricity Coordinating Council Document Categorization Project Steve Ashbaker February 19, 2009 RPIC Meeting – February 19, 2009.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
Implementation of AB 2516: Sea-level Rise Planning Database Ocean Protection Council and California Natural Resources Agency
California’s Electricity Situation Briefing for the staff of the U.S. House of Representatives February 9, 2001 Energy Information Administration (Updated.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
CARS 2 Nancy Nolasco Austin Waits Tyler Hartley. The cars are preparing for the most important race of the year. The sun is shining and its nuclear energy.
Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
DWG Wind Profile Review November 11, 2014 Dan Beckstead Associate Staff Engineer.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Fred Heutte, Chair Environmental Data Working Group May 3, 2016
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Northwest Gas Market Outlook
Practices Short Circuit Model
Nick Hatton Associate Engineer March 9, 2017
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
Background on the 2016 Study Program Process
Reliability Assessment Committee Reliability Workshop Priorities
Western Electricity Coordinating Council
1.
PARALLEL OPERATION OF SINGLE PHASE TRANSFORMER
Fred Heutte, Chair Environmental Data Working Group May 3, 2016
Tyler Butikofer Associate Engineer II
Elena Melloni Associate Engineer
Western Electricity Coordinating Council
Western Electricity Coordinating Council
PCM (Production Cost Model) Data Work Group Webinar
West Connect Region Changes
Design of Powertrain for an Electric Car
Western Electricity Coordinating Council
2018 State of the Interconnection Overview
Maggie Peacock, Analyst
Tyler Butikofer Associate Engineer II
Tyler Butikofer, WECC Tom Carr, WIEB
2018 WECC Loads and Resources Data Request Part 2
Reliability Assessment Committee Reliability Workshop Priorities
Fred Heutte, Chair Environmental Data Working Group May 3, 2016
RC Certification Timelines
Forecasting and Operations CAISO Case
Tyler Butikofer Associate Engineer II
Dan Beckstead Associate Staff Engineer
Fred Heutte, Chair Environmental Data Working Group May 3, 2016
PCM (Production Cost Model) Data Work Group Webinar
ADS Update: Resource Reconciliation
Maggie Peacock, Analyst
Practices Short Circuit Model
Study Results Drought Scenario Study
2018 WECC Loads and Resources Data Request Part 1
Western Electricity Coordinating Council
Andrew Christensen, SRWG Chair
West Connect Region Changes
Tyler Butikofer Associate Engineer II
Proposed Quorum Language
PDWG Validation of the 2028 ADS PCM V1.0
Great Lakes Regional Wind Institute
Managing Data Corrections Between SDWG & PDWG
North America Energy Standards Board
Data Subcommittee Production Cost Model Data Work Group (PDWG) Update
Tyler Butikofer Tom Carr
Presentation transcript:

ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates Tyler Butikofer Associate Engineer II Western Electricity Coordinating Council

Western Electricity Coordinating Council Updates for V2.2 NW wheeling rates updated to reflect posted spreadsheet California ISO wind shapes implemented Change to Rock Island monthly max capacity Ratio of monthly max cap of Rocky Reach Western Electricity Coordinating Council

Regional Transfers due to NW Wheeling Changes Western Electricity Coordinating Council

Dump Energy Comparison due to NW Wheeling Rate Changes Western Electricity Coordinating Council

Western Electricity Coordinating Council Questions Tyler Butikofer tbutikofer@wecc.biz 801-819-7604 Western Electricity Coordinating Council