1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
Chapter 7 Interupts DMA Channels Context Switching.
High Lights of SAP Business One for Manufacturing.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
Template v7 January 30, Copyright © Infor. All Rights Reserved.
Final Year Project Initial Presentation
1 SCO Update Service Kerri Wallach, SCO Services Product Manager April 16, 2003.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Station Board EVLA F2F Meeting: December Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. JD Edwards Summit Preview the Plans for JD Edwards World A9.4 Release David Greiner,
March 2010 Target Group Control System of production furnace for SPES project Results and progress status march 2010.
ACM 511 Introduction to Computer Networks. Computer Networks.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Status of NA62 straw electronics Webs Covers Services Readout.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Sageon Power Module Distribution Sageon Rack Trim Pieces.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
9/29/2016E. Hazen - oSLB1 HO Trigger Links ● oSLB produced (69 pieces) – First few tested (by me) -- seem OK – Production testing to be done by student.
S A Griffiths CM42 June 2015 Electrical & Control.
Area Covered. Work Done Quantity Financial Progress of work.
Chapter 22 Procurement Cycle and Documents
Relocation Services and Equipment Modification Services
SB-DN-Logic960 Logic module.
Cabling for LHCb Upgrade
Status of LHCb PC Farm prototype
LKr status R. Fantechi.
B.6 Roadmap 2013 – 2014 SDMX RI User Group Luxembourg, September 2013.
Injectors BLM system: PS Ring installation at EYETS
T1 Electronic status Conclusions Electronics Cards:
LV Safe Powering from UPS to Clients
Mini-drawers, FE-ASIC , Integrator
Chamber Design and Integration RE3/1 and RE4/1
Operating systems and Internet services
Program Management Portal (PgMP): Catalog and the Client
Robert Gomez-Reino Garrido
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Status report Dual-Axis dyno taskforce
DSC Governance Sub Group Recommendations
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Product released! Software Released! Now what?.
Krzysztof Czuba ESS LLRF Quarterly Meeting
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
Preparation for Installation at ESS
LCLS Control System Personnel Linac & BC2 Controls progress
Chapter 12: Software Support and Maintenance
Presentation transcript:

CAN branch PSU – Update meeting Purpose of meeting: Current production status Cost & financial matters Issues / Bugs Inrush current Units with misreading channels Modified mains wiring kit 10 April 2019 Contract with Wiener Contract benefits – Cost, common support mechanism. Release orders

CAN Branch PSU Unit Current production status Deliveries to date shown in table -> Remaining quantities in progress now Rear panels are priority at this time, more expected very soon Unit Build Qty Delivered to users Available Subracks 41 11 5 Modules 290 33 127 Rear panels 30 2 10 April 2019 Contract with Wiener Contract benefits – Cost, common support mechanism. Release orders

CAN Branch PSU Final cost To balance 60% of estimate charged to users to date. Rear panels not charged to users as yet. Incidental costs, if spread across 290 modules adds 43 CHF to each. To balance Users pay: +15 CHF per module +30 CHF per sub-rack 185 CHF per rear panel Unit Original estimate (CHF) Final cost (CHF) Note Sub-rack (each) 1500 1168 -22% Module (each) 650 361 -45% Rear Panel (each) 125 185 - Incidental costs (design, prototype & small production) 12,455 10 April 2019 Contract with Wiener Contract benefits – Cost, common support mechanism. Release orders

CAN branch PSU Issues / bugs Inrush current A full sub-rack can show an inrush of ≈100A for 1-2 ms. Standard CB on rack distro seems to be 16A C type, which should tolerate 160A for a few ms (100xN). If several sub-racks are to share a CB, consider using a sequenced distribution block. Available from CERN stores. 10 April 2019 Contract with Wiener Contract benefits – Cost, common support mechanism. Release orders

CAN branch PSU Issues / bugs Units with misreading channels Visited USA15 yesterday. Problem was due to ELMB configuration being defaulted by the loading of non-standard firmware. It seems this was done to set the address by CAN rather than using the DIP switches. 10 April 2019 Contract with Wiener Contract benefits – Cost, common support mechanism. Release orders

CAN branch PSU Modified mains wiring Upon request, ESS are working on a modification to the mains wiring for the subrack. This will comprise: A fixed mains flex from the rear panel A circuit breaker/switch on the front panel (protected from accidental operation) ESS will fit this to all remaining subracks & would propose to supply a kit, to install on sub-racks currently in use. This should be available within a few weeks. 10 April 2019 Contract with Wiener Contract benefits – Cost, common support mechanism. Release orders