90m "proper" VdM scans in the 90m/10m optics

Slides:



Advertisements
Similar presentations
DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
Advertisements

Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
MD2036: UFO dynamics studies and UFO fast detection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday fill with 1092 bunches (6 h stable beams)
Saturday 30th June - Sunday: Rocky !
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Review of 2011 LHC run from the experiments perspective
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Tuesday TOTEM and transverse loss map (1) OK
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Thursday morning 09:30 Dump of pPb fill.
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Wednesday 8th August & night
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
LHC progress report Week
Friday Morning 7:30 injection for fill 2908
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Programme for VDM measurements Friday Oct 15
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Thursday 22 September 2011.
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Friday 1st October : Van der Meer scans
HI2011 Commissioning Status
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

90m "proper" VdM scans in the 90m/10m optics 90m exercise 90m "proper" VdM scans in the 90m/10m optics

RP alignment and data taking ( + loss maps ) TOTEM ALFA priority 1 1h 2h 3h 4h 5h 6h 7h 8h 9h 10h 11h 12h 13h 14h move all pots to ~10 move all pots to ~10 align one V-pair b1 ~1h align V-pair b2 ~1h move aligned V pots to ~4.5 move aligned V pots to ~5.5 align one V-pair b2 ~1h align V-pair b1 ~1h align b1 H pots ~1h align V-pair b2 ~1h move aligned H pots to ~7 (?)  align b2 H pots ~1h align V-pair b1 ~1h stand alone take data ~2h take data ~4h in-ATLAS take data ~1h take data ~2h bonus take data ~4h take data ~2h calibration data taking ~2h move out RPs, loss maps~1h

The short-version check list Pot motion is OK, test during ramp down of last fill before 90m (TOTEM/ALFA) including motor step counter reset. Only possible if OVERRIDE = TRUE. can be done at any time, but ideally before the bunches are actually injected. Detectors are OK: internal checks by TOTEM/ALFA/ATLAS before starting the 90m run Very relaxed setup beam flag limit is set (EiC/MC) Pots are in OVERRIDE mode, no dump when move in ADJUST (TOTEM/ALFA) TOTEM: done in the very first step (motion check & step counter reset) by TOTEM expert. ALFA: correct. The mvt of the ALFA pots will be done by one expert. The OVERRIDE setting is done by the ATLAS SLIMOS on request of the ALFA expert. BLM thresholds have been correctly set (Jorg W) Pots interlock limits are correctly set (Stefano R / Jorg W) TOTEM expert can check all TOTEM limits via DCS. ALFA: as TOTEM we have in the meantime the reading of these settings (via DCS). Important to have a collimation expert around. Time out of very relaxed setup beam flag (voice warning, be vigilant...) Check AC dipole is working before refilling (EiC/MC) Beams with adequate intensity and emittance are prepared in advance in SPS (=> MC) probe bunches: N~9-11e9,   2um, nominal bunches: N~6-8e10,   2um before ramp Check that BSRT have optimal settings and measure emittances bunch by bunch After injection and after unsqueeze: wire scans (bunch by bunch) Anything else ?

58h = 2.4 days dcct2 dcct1 Energy beta* ALFA RP positions TOTEM Instability ! Roman pots beam-based alignment dcct2 dcct1 inj loss maps TOTEM/ALFA data taking loss maps VDM fill beta-beat k-modulation BPM MD LBDS self trigger PC trip Energy beta* SIS dump move TOTEM and collims closer, ALFA retracts for a moment... RP align ALFA RP positions 58h = 2.4 days H RP align TOTEM RP positions V RP align

ALFA scraping Min.bias trigger rate during scraping RP 5 + 6 RP 3 + 4

90m exercise Not an easy exercise! Unusual hypercycle (optics), Unusual filling scheme (mixing probes and sub-nominal bunches) Many goals to achieve in a short time (sometimes in parallel) Reduced expert crew to handle Once again, a intense cooperation between experiments and machine operation, orbit, sequence, collimators, betatron loss maps, async dump, with subsequent analysis, machine protection aspects, etc.

90m thanks! A big MANY THANKS to our machine* colleagues from the experiments and from myself! *including injector! In particular to Sophie, Rogelio, Helmut, Marek, RalphS, Glenn, ... Gianluca, Florian, ... Verena, Reyes, Delphine, Alick, Stefano, Ron, Guy, GHH, Lasse, ... Jorg, Bernhard, Mike, Brennan, Ralph, rMPP, ...

In addition: VdM at 90m/10m Reminder: Total beam current measurements is now reaching the level of sub- percent total accuracy! (thanks to BE-BI and Colin Barschel!) see Bunch Currdnt Normalisation WG (under cern.ch/lpc) Other sources of uncertainties become important and can substantially affect the total uncertainty on the absolute luminosity calibration ghost charge relative bunch population reproducibility of scans shape distortions ? coupling effects ? length scale precision etc.

VdM overview fill 2234 ALICE LHCb ALICE ATLAS

VdM measurements fill 2234 FillNr 2234, Fri 21.10.2011 06:26 => Fri 21.10.2011 14:29 ~8.0h 3.5 TeV, Single_36b_4_16_16_4bpi9inj LHCb +, ALICE +/+, N=~ 1e11 p/bch, 90 10 90 10 m Emittance (3-5 um) was a bit larger than desired, but OK Performed VdM programme: 06:43-07:34 ALICE 07:34-11:18 LHCb 11:18-13:47 ALICE 13:47-14:29 ATLAS (NB: no request from CMS)

VdM measurements fill 2234 Detailed: o 06:43-07:06 VdM H in IP2 o 07:06-07:34 VdM V in IP2 o 07:34-07:51 VdM H in IP8 o 07:51-08:06 VdM V in IP8 o 08:10-08:24 "Fast" length scale calibration H in IP8 o 08:24-08:38 "Fast" length scale calibration V in IP8 o 09:04-09:51 Beam-gas data at 4 extreme separations IP8 o 09:52-10:24 Fast 2-beam VdM scans H-V-H-V in IP8 o 10:24-11:18 Fast 1-beam VdM scans H-V-H-V in IP8 o 11:18-11:49 VdM H in IP2 reversed direction o 11:49-12:17 VdM V in IP2 reversed direction o 12:17-12:44 VdM V in IP2 with 140um separation in H o 12:44-13:08 VdM H in IP2 with 140um separation in V o 13:17-13:32 "Fast" length scale calibration H in IP2 o 13:32-13:47 "Fast" length scale calibration V in IP2 o 13:47-14:29 Started setting up for IP1, but dumped

preliminary LDM results for VdM fill 2234