Review of Framework Guidelines Processes

Slides:



Advertisements
Similar presentations
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
Advertisements

New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
Stakeholder Group Meeting 26. May 2010 Northern Regional Initiative in a European context Jeppe Danø.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Lord Mogg Chair, ERGEG Madrid Forum, 14/15 January 2010 Strategy for market integration and the role of the Regional Initiatives.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
National Academy of Public Administration
Mercy College Appraisal and Recognition of POL Holders Pilot
The most represented stakeholders within the NAPA process were governments, followed by research institutions, UN Agencies and local communities. Private.
GEF Familiarization Seminar
10 year investment plan ERGEG approach and contribution
19th GRI Coordination Group meeting
New transparency guidelines
FlorenceForum November 2008
How will the 3rd Energy Package Impact GRI NW ?
Structure of the Code Don Thomson, Task Force Chair IESBA Meeting
Grid Code What is the Standard Modification Process? Panel
GSE worked with ERGEG on CAM/CMP since
Work plan of GRI NW for 2011 Three out of four projects are started
ACER’s view on the future role of the Gas Regional Initiative
Organisational Development
IAASB Possible Actions Regarding Less Complex Entities
Standards” and by the Council key Priorities
Update on European Network Codes
PARIS21 - League of Arab States
Marine Strategy Framework Directive (MSFD)
Steven Gordon ACER Gas Department
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Gas balancing – where next
ERGEG Benchmarking report on long term transmission rights
Jozsef Szlezak & Pawel Kazmierczyk (EEA)
EUROPEAN TRANSPARENCY UPDATE
Development of energy balance statistics
State of play of B2G eInvoicing in public procurement
Marine Strategy Framework Directive (MSFD)
Bangkok, Thailand 18 April 2016
2009 European Water conference SCG meeting 5-6 November 2008 Maria
Development of energy balance statistics
Information on projects
Draft Mandate for for the SSG on WFD and agriculture
ISA 600, Group Audits New York, USA March 5, 2019
REFIT Platform 20/02/2019 Diversity Europe Group.
The Estonian experience with ex-ante evaluation – set-up and progress
LNG Workshop Bilbao, March 13th 2009 GLE.
Fitness Check EU Water Policy
ACER’s view on the future role of the Gas Regional Initiative
Session 1: The report on CIS-members´ views on the experience in the implementation of the economic aspects of the WFD.
Ad-hoc Activity: Biodiversity and Water Progress Report
Work plan of GRI NW for 2011 Three out of four projects are started
European Marine Strategy
DG Environment, Unit D.2 Marine Environment and Water Industry
European Marine Monitoring and Assessment
Task Force Peer reviews and quality Eurostat
Presentation transcript:

Review of Framework Guidelines Processes Lord Mogg Chairman ERGEG Florence Forum 13 December 2010

Objectives Provide input to ACER to enable it to improve the processes going forward for the benefit of stakeholders and regulators. Based on real experiences and wide feedback.

Methodology Public consultation – we requested feedback from all stakeholders involved in the Framework Guideline process through a set of questions via an online public consultation. Interviews – we undertook a number of structured interviews with ENTSO-E, ENTSOG and the European Commission. Surveying the Expert Group members and the members of AHAG – all members of the Expert Groups and AHAG were invited to respond to the same set of questions asked of stakeholders. Internal consultation – we asked regulators directly involved in the process to give their views through a structured Questionnaire and structured interviews.

Content The review will address, inter alia: Timeline of the Framework Guideline process How the initial impact assessments were undertaken Whether the policy development phase was undertaken effectively How consultations were undertaken The level of resources required of regulators and stakeholders The level of co-ordination between the various participants

Timetable The outcome will be report to the ACER Director in March 2011. The key conclusions and lessons learned will be presented at the next Florence and Madrid Fora.

Lord Mogg Chair ERGEG 4 May 2010 Thank you Lord Mogg Chair ERGEG 4 May 2010 Mr Chairman, you have now seen what the Strategy Paper conclusions look like after the whole process. The issues are complex, and imply significant changes to the way we operate the Regional Initiatives. As you have seen, we have considered both the specific conclusions relating to the questions we posed during consultation and on the role of the RIs in implementing Guidelines and codes. We have received comments from E-Control and Nma as part of the approvals process within RIG. These do not relate to the substance of the paper and will be incorporated into the final version. I would like to thank the GA in advance for its comments (if any) before approving the conclusions document.