Gas SO Incentives Rollover

Slides:



Advertisements
Similar presentations
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with consumers – No 2 30 January 2014.
Advertisements

Putting it all together: Policy directions Cameron Maxwell, Business Development, FCS FEG Autumn Symposium, 8 September 2011.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Making the Carbon Reduction Commitment Work Keith Brierley – Project Manager Belfast seminar - 26 March 2009.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Gas SO Incentives For 1 April 09 Transmission Workstream 3 July 2008.
Mark Dalton 4 February 2010 Transmission Workstream Discussion slides.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Capacity trade and transfer mechanism and the next AMSEC auction Bob Hull Director, Transmission 9 May 2007.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Power Opportunities in the States Richard R. Miller, P.E. HDR, Inc. ___________________________________________________________________________________________________________________________________________________________________________________________
Gas System Operator Incentive Review
State Electricity Regulatory Commission BOSNIA AND HERZEGOVINA
Annual Review of Shrinkage and Leakage Model
Review of System Alerts
Transmission Planning Code – Draft Document
Review Group 291- Ofgem Update
MIPI Energy – Daily Reports
SO Incentives Consultation
Transmission Planning Code
GRI NW TRANSPARENCY PROJECT
SO Incentives from April 2010
Update on European Network Codes
Gas SO Incentives from April 2010
Gas balancing – where next
24th January 2017 Teleconference
Changes to Reserve Level Declaration Guidelines
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Operating Margins (OM) Consultation
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
Cashout actions and further considerations
Publication of Zonal Flex Data
Development of Entry Capacity Substitution
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Transmission Planning Code Review
Review Group 291- Ofgem Update
EURELECTRIC transparency requirements
Operating Margins (OM) Consultation
Publication of UK Wholesale Gas Market Liquidity Data TR 1099/1100
Richard Fairholme E.ON UK
EU Developments.
Gas Customer Forum DN Interruption Update - Introduction
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism
Demand Estimation Impacts
Ofgem presentation to Gas Transmission Workstream
Open Letter - Summary of Responses
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
195AV “Future work” – system flexibility
APX OCM Collateralisation
Where: Resource Center
Gas Customer Forum 28 July 2008
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Presentation transcript:

Gas SO Incentives Rollover Attendees: Phil Hobbins 6 October 2011

Gas SO Incentive Rollover Five of the existing Gas System Operator Incentive Schemes are due to expire in March 2012 We consulted this summer on the principles Ofgem are hosting a workshop to discuss their initial views for the incentive proposals on 12th October after the Gas Operations Forum Details are in Ofgem’s open letter on rollover incentive review process: http://www.ofgem.gov.uk/Pages/MoreInformation.aspx?docid=268&refer=MARKETS/WHLMKTS/EFFSYSTEMOPS/SYSTOPINCENT If you would like to attend please contact Mathieu.Pearson@ofgem.gov.uk

Current scheme expires Useful information National Grid Gas System Operator Incentive Info http://www.nationalgrid.com/uk/Gas/soincentives/ Talk to us: Juliana.Urdal@uk.ngrid.com 01926 656195 soincentives@uk.ngrid.com Scheme Current scheme length Current scheme expires Purpose of incentive NTS Shrinkage 3 years 31 March 2012 Minimise cost of purchasing gas & electricity for shrinkage Unaccounted for Gas Reduce volumes of unaccounted for gas Residual Gas Balancing 2 years Minimising daily change in linepack to promote cost targeting whilst minimising the impact of its trades on the market Demand Forecasting Minimise the error in NGG’s demand forecast Data Publication Encourage the timeliness and availability of published information