XRN4621 - Construction of a Meter Reading where a Converter and AMR is recorded DSG 18/06/2018 DWG 28/06/2018.

Slides:



Advertisements
Similar presentations
Discharging Shipper AMR responsibilities at DM sites Gareth Evans on behalf of Total Gas and Power Ltd.
Advertisements

NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Implementation of Non Effective Days Nexus Workgroup – March
Guide to Linux Installation and Administration, 2e1 Chapter 12 Printing in Linux.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Copyright © Texas Education Agency, All rights reserved. 1 Web Technologies Website Development with Dreamweaver.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
IGT Single Service Provision Requirements Update – 27 th March 2013.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
HalFILE 2.1 Planned Features / User Feedback Session II.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
PART1 Data collection methodology and NM paradigms 1.
David Addison / Steve Deery
Functional Change through RGMA Review Ph2
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Datalogger / DMV Modification Proposals - Summary
Project Nexus Workgroup (Settlement)
File Transfer and access
Background - Tolerance Rules
XRN Construction of a Meter Reading where a Converter and AMR is recorded OR where a Meter with Conversion capability is fitted v2 DWG 28/06/2018.
Nexus Meter Read Performance April 2018
Revised registration for unregistered sites
Must Read Process Guide For Shippers
PAF Risk Register and PARR mapping
Background - Tolerance Rules
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Change Management Committee – June 2019 Update
Change Management Committee – November 2019 Release Update
Theft on Shipper-less Sites
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
MOD 258A Demand Estimation Sample Point – Shipper Report.
UNC Modification 0531 Provision of Industry Testing System
CoMC on 20th February 2019 For Discussion Only
XRN4790 – Introduction of winter read/consumption reports
Distribution Workgroup 8 August 2012 Joanna Ferguson
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
June 2019 Release Scope DSC Change Management Committee
Datalogger / DMV Modification Proposals - Summary
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
PN UNC AMR Topic Workgroup
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
PN UNC AMR Topic Workgroup
Lessons Learnt UKLC - November 2015
Project Nexus Workgroup
Procurement of NDM profiling data
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Daily Metered Supply Points
Project Nexus Workgroup
Change Management Committee – November 2019 Release Update
Project Nexus Workgroup
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Change Management Committee – November 2019 Update
Meter Read Rejections ..
Meter Reads.
Customer Issue Management CoMC Update
XRN June 19 Release - Status Update
Retail Energy Code - Data Access Schedule
High Level System Solution Impact Assessment
Presentation transcript:

XRN4621 - Construction of a Meter Reading where a Converter and AMR is recorded DSG 18/06/2018 DWG 28/06/2018

Background Reading construction in Nexus was highlighted prior to implementation as an issue where Converter and AMR devices are fitted at site As [typically] AMR devices only have two ports – therefore may only obtain two indexes In advance of Nexus, we agreed with Shippers that they needed to provide three indexes (meaning that they would need to ‘derive’ one index), …and that we would look at this following Nexus.

Question for Shippers Through this presentation we’ll go through some of the background, but the question for Shippers to consider is bold text below: We understand from MAMs that some configurations exist which would call in converted and unconverted ONLY. UNC doesn’t appear to envisage this scenario for Shipper provided Meter Readings. Need assessment of numbers from Shippers of instances of Supply Meter Points sending ONLY converted + unconverted indexes – this may drive an alternative approach – e.g. make the Meter Reading ‘Optional’ in the Meter Reading records.

Background Reading construction in Nexus was highlighted prior to implementation as an issue where Converter and AMR devices are fitted at site As [typically] AMR devices only have two ports – therefore may only obtain two indexes In advance of Nexus, we agreed with Shippers that they needed to provide three indexes (meaning that they would need to ‘derive’ one index), …and that we would look at this following Nexus.

Background – What Code States: Definition of Meter Reading (M 1.5.2) 1.5.2 For the purposes of the Code, in relation to a Supply Meter: (a) a “Meter Reading” is: (i) the reading of the index of the Supply Meter; and (ii) where a convertor is installed as described in paragraph 1.2.3, the converted and the unconverted readings of the convertor except that where Transporter Daily Read Equipment and such a convertor are installed, a Meter Reading need not include both the reading under paragraph (i) and the unconverted reading under paragraph (ii) or where Remote Meter Reading Equipment and such a convertor are installed, a Meter Reading need not include the unconverted reading of the convertor under paragraph (ii); So where it is Transporter Daily Read Equipt– states that valid combinations are: Meter + Unconverted + Converted; OR Meter + Converted Reading; OR Unconverted + Converted Reading Other AMR equipment: Meter + Converted; OR Meter + Unconverted + Converted

Background – File Formats Class 1: M00 Record, DLC File https://xoserve.sharepoint.com/:w:/r/sites/UKLink/_layouts/15/WopiFrame.aspx?sourcedoc=%7B08449D60-FE9A-4E82-90C1-193ABA69702E%7D&file=M00%20DAILY%20DATALOGGER%20READINGS1%20V6.3L.docx&action=default&DefaultItemOpen=1 Meter Reading ‘Mandatory Field’ Corrected Reading ‘Optional Field’ – Conditionality is that this must be provided where a converter is fitted.

Background – File Formats Class 4: U01 Record, UMR File https://xoserve.sharepoint.com/:w:/r/sites/UKLink/_layouts/15/Doc.aspx?sourcedoc=%7BD4DB6604-5BD1-492B-A05F-887B8B0D3D8B%7D&file=U01%20UNBUNDLED%20METER%20READ%20V5L.docx&action=default&mobileredirect=true&DefaultItemOpen=1 Meter Reading ‘Mandatory Field’ Uncorrected Reading ‘Optional Field’ – Conditionality is that this must be provided where a converter is fitted. Corrected Reading

Valid Installation Schematics converted converted Meter Converter AMR unconverted unconverted converted converted Meter splitter Converter AMR meter meter converted converted Meter splitter Converter AMR* unconverted unconverted AMR* meter meter * - this may be a second AMR device, or three channel AMR device – none are known to be installed at this time

Requirement Statements UNC appears to stipulate: So where it is Transporter Daily Read Equipt– states that valid combinations are: Meter + Unconverted + Converted; OR Meter + Converted Reading; OR Unconverted + Converted Reading Other AMR equipment: Meter + Converted; OR Meter + Unconverted + Converted Requirement statements: Transporters / DMSP - Continue to only allow Meter and Converter Readings as per records. Agree? Define conditionality in User Reading Records in UMR, UBR and UDR to align to UNC. Agree? We understand from MAMs that some configurations exist which would call in converted and unconverted. Need assessment of numbers from Shippers of instances of this – this may drive an alternative approach.