TIB contribution for the X5 - May 2003 Test Beam

Slides:



Advertisements
Similar presentations
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
X5 TEST BEAM preliminary studies Outline  Voltage scan  PLL scan + Neighbour Strips  Sensor Uniformity  Comments  Special Trigger (Friday)
24-28 May, 2010 S. Mastroianni - 17th Real-Time Conference, Lisboa, Portugal ARGO-YBJ is a cosmic ray air shower detector based on a single layer of RPC.
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Vertex 2002 Kailua-Kona The heavy ionising particles in CMS tracker Hip effect description. The PSI beam test. Measurements of hip rate and induced dead.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Waclaw Karpinski General meeting CMS TRACKER SYSTEM TEST Outer Barrel –TOB Inner Barrel –TIB End cap –TEC TIB TOB TEC Different Geometries One.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
Operation of the CMS Tracker at the Large Hadron Collider
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Analysis of LumiCal data from the 2010 testbeam
L. Benussi On Behalf of LNF crew
INFN and University of Florence Test Beam Meeting Tracker Week
Detector building Notes of our discussion
Results achieved so far to improve the RPC rate capability
Strawman A Status Report
Recent progress of PureCsI+APD readout
Readout System of the CMS Pixel Detector
INFN and University of Florence Test Beam Meeting Tracker Week
Dual Readout Clustering and Jet Finding
GLAST LAT tracker signal simulation and trigger timing study
X5 quasi offline Analysis
TIB module performance at X5 Test beam – preliminary studies
Work packages status in Torino and perspectives
GlueX Electronics Review Jefferson Lab July 23-24, 2003
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
5% The CMS all silicon tracker simulation
Front-end electronic system for large area photomultipliers readout
Silicon Strip Tracker MPR November 2004 CMS TRACKER COLLABORATION
The digital read-out for the CSC system of the TOTEM experiment at LHC
RPC Detector Control System
Optical links in the 25ns test beam
The digital read-out for the CSC system of the TOTEM experiment at LHC
The CMS Tracking Readout and Front End Driver Testing
Limited Streamer Tube Project Summary
RPC Detector Control System
SVT detector electronics
May Test Beam Analysis – Sensor Homogeneity – Preliminary!
Presentation transcript:

TIB contribution for the X5 - May 2003 Test Beam C. Civinini On behalf of the TIB Community 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze Outline Why to be in this beam test? TIB System Test and Test Beam interplay Equipment What to measure? 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze Motivations System Test validation by using 25 ns beam mips Measurements with full optical readout Power Supply prototypes tests (100 m cables) (Almost) Final TIB Layer-3 shell mechanics 4/11/2019 C. Civinini INFN-Firenze

TIB System Test and Test Beam interplay All components will be already debugged and validated @ System Test Modules At least 2 strings of 3 modules each Electronics AOH 1 Electro-optic converter (may be one more) 2 FED (may be one more) Digital Optical-link 1 FEC 2 CCU25 1 TSC 2 Mother cables (or more) 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze System Test 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze System test (2) 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze System test (3) 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze Mechanical Structure Ventilation Beam Vetronite Cover Box 1 meter Pedestal Basement Cover locks 60 cm 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze Shell movements (La Guillotine) 4/11/2019 C. Civinini INFN-Firenze

Measurements with full optical readout Standard tests with (almost) final readout S/N Cluster width Inter-strip cross-talk Inclined tracks Overlap between modules Noise correlations High density environment (jet like) Signal vs hit position Etc … 4/11/2019 C. Civinini INFN-Firenze

C. Civinini INFN-Firenze Monitoring On-line Fast feedback during debugging phase Some volunteers available On-site Crucial feedbacks to the data taking Experience from past Test Beams Support to the general analysis for the 3 systems (TIB, TEC and TOB) See Ian’s talk 4/11/2019 C. Civinini INFN-Firenze