Maximo Scheduler and Maximo Scheduler Plus Overview

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 12 of the corporate.
Program Management Portal: Overview for the Client
29 Oded Moshe, Director of Product Management Beta Release May 3rd, 2010 Official Release May 24, 2010.
SOFTWARE PRESENTATION ODMS (OPEN SOURCE DOCUMENT MANAGEMENT SYSTEM)
Calendar Browser is a groupware used for booking all kinds of resources within an organization. Calendar Browser is installed on a file server and in a.
Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | Oracle SQL Developer What’s New in Version 4.1 Jeff Smith
Microsoft Dynamics NAV 2009 RoleTailored Client Terminology May 2010.
QAD .Net UI: New Enhancements
1Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 8 Reporting from Contract.
Oracle E-Business Suite Order Management: Presenting the HTML and Mobile User Experience Durgaprasad Bodapati Director, Product Management Bhavana Sharma.
1 Mobile Document Capture using Apple iPhone and IBM Content Navigator October, 2012.
Tivoli Software © 2009 IBM Corporation IBM Maximo Mobile Suite Overview David Havican Lead Product Designer & Architect April 27, 2011.
Tivoli Software © 2009 IBM Corporation Maximo Mobile Suite David Havican Lead Product Designer & Architect.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. JD Edwards Summit Really Cool Demo Stuff – 2015 Edition!!!!! For demo content, please.
Click to add text © 2012 IBM Corporation 1 InfoSphere Streams Streams Console Applications InfoSphere Streams Version 3.0 Warren Acker InfoSphere Streams.
Click to add text © 2012 IBM Corporation 1 Streams Console Application Graph Michael Pfeifer Streams Admin Console.
Updated 12/9/2015 Hiring Manager Training Guide. Updated 12/9/2015 Table of Contents Introduction System Overview Review Applications Using Highlights.
Munis Version 9.1 & 8.3 Sneak Peek System Administration.
Vet View PATIENT REMINDERS AND REMINDER CARDS. Patient Reminders /Reminder Cards  Plan to address major limitations in UVIS:  Fix issues with recurrences.
Manage your projects efficiently and on a high level PROJECT MANAGEMENT SYSTEM Enovatio Projects Efficient project management Creating project plans Increasing.
Mobilize Your Workforce Overview of Maximo Anywhere & Everyplace Steven Shull Projetech Solution Architect/Development Lead Gina Adkins Leonard IBM Maximo.
© 2015 IBM Corporation June 13, 2016 Boguslaw Nowak ILMT & BigFix Inventory development demo.
 1- Definition  2- Helpdesk  3- Asset management  4- Analytics  5- Tools.
Introduction to EBSCOhost
AdisInsight User Guide July 2015
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
Project Management: Messages
Program Management Portal (PgMP): What’s New in R8 for the Client
Creating Oracle Business Intelligence Interactive Dashboards
Key Features Advantages over PDF sharing Use Cases Clients
Forecasts and Long Term Forecasts (Formerly Planning Schedules)
CARA 3.10 Major New Features
Standard Operating Procedure
Metadata Editor Introduction
Program Management Portal (PgMP): Catalog and the Client
Boeing Supply Chain Platform (BSCP) Detailed Training
TwinEngines Discharges
OUT OF THE BOX HOW TO USE THE SYSTEM
Central Document Library Quick Reference User Guide View User Guide
My Oracle Support (The next generation Metalink experience) lynn
Download Orders, Shipments, and Receipts
Charles Phillips screen
JD Edwards Support and Oracle Cloud Infrastructure: A Successful Path to Oracle Cloud
Overview & Basic Functionality
Practice Insight Instructional Webinar Series Reporting
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … Presented by Robert Freeman (
LV Merge Docs – Deep Dive
Enhancement Notification Release 5.4
PROJECT MANAGEMENT Bill Biddle.
Download Orders, Shipments and Receipts
SSI Toolbox Status Workbook Overview
Lesson 13: Epic Appointment Scheduling Reports
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
C/S Windows Overview Nigel Pilsbury.
IBM SCPM Basic Navigation
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
What YOUR ORGANIZATION CAN be doing to prepare
Introduction to EBSCOhost
Forecasts and Long Term Forecasts (Formerly Planning Schedules)
Approving Time in Kronos Manager/Supervisor Reference Guide
HR Portal: What’s New? What’s Next?
Tutorial Introduction to help.ebsco.com.
Key Features Advantages over PDF sharing Use Cases Clients
Kanban Task Manager SharePoint Editions ‒ Introduction
Presentation transcript:

Maximo Scheduler and Maximo Scheduler Plus Overview

DISCLAIMER IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal without notice at IBM’s sole discretion. Information regarding potential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information mentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be incorporated into any contract. The development, release, and timing of any future features or functionality described for our products remains at our sole discretion. © Copyright IBM Corporation 2017. All rights reserved.

Maximo Asset Management Scheduler – work management tool embedded in Maximo DOC Server iLog DOC Optional: clients may choose not to use the optimization capability and can skip the DOC installation during the install process Required only for Optimization Scheduler 7.6.5 Add-on product to Maximo EAM, code embedded in core Maximo therefore a single install Requires a separate license purchase Includes integration adapter and optimization engine and models Maximo Scheduler Maximo Asset Management Maximo 7.6.0.8 fix pack level

Roles We Cater To With Maximo Scheduler Receives assignments, optimized routes and directions Reports on progress and work completion Technician Planner Scheduler Repair Facility Manager Floor Supervisor/ Dispatcher Assign scheduled work Monitor and assign emergencies Build daily crews View and adjust crew work in the field Model work steps in Job Plans and Routes Define PM frequencies Forecast long term work and cost Use historical data to adjust the plan Assign WOs of a mobile asset to a facility Assign work within the repair facility Create rolling work schedule Resource level Schedule windows CPM Monitor schedule compliance

Role Based Applications in Maximo Scheduler Roles Graphical Scheduling Planners and Schedulers Graphical Assignment Supervisors and Dispatchers Graphical Assignment - Repair Facility Repair Facility Managers Graphical Crew Management Supervisors Everyplace Mobile Templates Supervisors and Field Technicians

Scheduler Plus Offers the following in addition to Maximo Scheduler Managing large projects Model complex work order network dependencies Highlight critical path, % complete Appointment booking Make customer appointments within a schedule window Customer notifications – cancel / reschedule Dynamic dispatching Auto refresh, re-optimization based on real-time progress Incorporate real-time traffic conditions Weather integration Incorporate weather data into planning/scheduling and dispatching Weather alerts / notifications

(includes Maximo Scheduler) Scheduler Plus – embedded in Maximo End-to-end work management solution built on Maximo Scheduler Code embedded in core Maximo therefore a single install Available On-prem and via SaaS Requires a separate license purchase (license includes Maximo Scheduler functionality) Includes the optimization models iLog DOC Required only for Optimization 7.6.6 Maximo Scheduler Plus 7.6.6 (includes Maximo Scheduler) Maximo Asset Management 7.6.0.8 7.6.0.8

Role Based Applications Scheduler Plus further enhances the Scheduler applications as well as offers two new applications Application Roles Graphical Scheduling^ Planners and Schedulers Graphical Assignment^ Supervisors and Dispatchers Graphical Assignment - Repair Facility Repair Facility Managers Graphical Crew Management Supervisors Everyplace Mobile Templates Supervisors and Field Technicians Graphical Appointment Book Customer Service Representatives Graphical Scheduling – Large Projects* ^enhanced by Scheduler Plus; *available starting with Scheduler Plus 7.6.5; available with Scheduler Plus only

Pedigree 9 7.6 highlights 2009 2010 2012 2013 2015 2016 2017 May Scheduler 7.6.5 Planning buckets Optimization performance and enhancements Scheduler Plus 7.6.6 Weather Alerts Notifications for Alerts and Appointments Project Scheduling – GS-Large Project, CPM backward pass and filter, % complete Dynamic Dispatching Scheduler 7.6.3 Complete Java Applet replacement with new technology RFEs/Usability Scheduler 7.6.4 Excel Export WO Synonym colors PM Start Time Scheduler Plus 7.6.4 Weather Forecast Appointment Booking Project Scheduling – dependencies between anything Scheduler 7.6.1 New technology Repair Facility Mgmt PM Costing Usability Scheduler 7.6.2 Graphical Scheduling Asset/Location types Mult-tenancy support Gantt usability Scheduler 7.5.2 Optimization Scenario Management Compliance Dashboards Graphical Crew Mgmt Scheduler 7.5.1 Graphical Assignment Dispatching Schedule Compliance Crews Everyplace templates Other Resource Availability Maximo Scheduler 7.1.1 PM Forecasts Maximo Scheduler 7.1 Work and Resources in Gantt View Labor Load & Availability Critical Path Method 2009 2010 2012 2013 2015 2016 2017 May 9

Roadmap Release 7.6.x Release 7.6.x 4Q 2017 2018 Scheduler Plus Weather Alert notifications (SMS) Project Scheduling (Phase 3) Schedule dashboard Appointment Booking (Phase 3) SMS notifications Project Scheduling (Phase 4) Management reports Estimate Time to Completion Dynamic Dispatching (Phase 2) Real-time traffic Optimization Performance, Large project optimization (buckets), Traffic Weather Add map to Weather Alerts Admin Appointment Booking (Phase 4) Resource dependent windows Usability Graphical Assignment – work filtering to the Assignment view, Highlighting related assignments, Show dependencies between selected assignments, Show all dependencies in assignment view Variable Alternate Availability Configurable mouse-over and tool tips Optimization GS – Modified Availability GS – Alternate Availability GA – Multiple Work Zones Performance Performance Enhancements Project flag to not load related or non-persistent fields Improved SQL Select one or more rows for refresh Code profiling (clean up from Applet version) Graphical Resource View Availability heat map w/ shift totals and bulk edit UX Enhancements Gantt chart record grouping WO/task creation from the Gantt Inline editing Saved and conditional layout Schedule Data Integrity Tool Compliance Add details to tabs/graphs Optimization GS: Spatial Publish to 3rd party calendars Release 7.6.x 4Q 2017 Release 7.6.x 2018 The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion.   .

The DRAX Rainbow Chart ^enhanced by Scheduler Plus; *available starting with Scheduler Plus 7.6.5; available with Scheduler Plus only

Content for Release 7.6.x Weather Alert notifications (SMS) Scheduler Plus Scheduler Weather Alert notifications (SMS) Project Scheduling (Phase 3) Schedule dashboard Appointment Booking (Phase 3) SMS notifications Usability Graphical Assignment – work filtering to the Assignment view, Highlighting related assignments, Show dependencies between selected assignments, Show all dependencies in assignment view Variable Alternate Availability Configurable mouse-over and tool tips Optimization GS – Modified Availability GS – Alternate Availability GA – Multiple Work Zones Performance Performance Enhancements Project flag to not load related or non-persistent fields Improved SQL Select one or more rows for refresh Code profiling (clean up from Applet version) The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion.   .

Scheduler Plus SMS Text Messages Option for text communication in addition to email Appointment Confirmations Initial confirmation of appointment Reschedule Assignment of technician with time Weather Alerts Type of Alert and its time frame Work Orders associated to you that are effected 13

Scheduler Plus – Schedule Dashboard How are my projects doing? Totals of all the Schedules the user has access to view Cron to run calculations in off Quick Filter and Column Filtering Print Download to Excel User selected columns to display

Scheduler – Graphical Assignment usability Select only work records by holding Ctrl key when boxing with the mouse or select only Assignments using Alt key, right click and assign all to one labor Enable/Disable Filtering from the Work View On Select display other work dependencies - color all tasks in same WO - draw lines to show constraints

Scheduler – Graphical Assignment usability - continued Work View moved before Assignment View Select value list provided for column filtering Ability to Filter to Selected work or assignment records Toggle Tiled Mode returned from 7.5 version

Scheduler – Variable Alternate Availability Don’t have labor, crews and tools in Maximo? Use Alternate Availability to schedule work Note we now allow decimal values for partial days Adding an extra Mechanic for 2 days? Duplicate any default craft/shift and provide the dates you will have a different number of labor.

Scheduler – Configurable Tool Tips Would you like to adjust the values shown in one of the 12 tool tips within the Scheduler applications? Your Administrator can adjust the values, preview before saving, even reset to the default values.

Scheduler – Show to Level System property sets the number of levels you want to see It is your best estimate of how many levels users will typically have, and want to expand to Select a level and immediately expand to it

Scheduler – New Optimization constraints Graphical Scheduling Resource Leveling and Capacity Planning applies various resource availability Modified Availability of Labor for vacations and extra time Alternate Availability Performance Improvements Resolution Mins removed – now automatically calculated Limit to the number of solutions we resolve to Graphical Assignment Labor Assignments and Spatial Assignments now applies various resource availability Allow secondary work zone assignments Allow Secondary Craft Assignments Limit to the number of solutions we resolve to Spatial Assignments only Work Zones now optional

Scheduler – Performance Enhancements Graphical Scheduling - User controlled performance options Ability to not bring in related work order records Refreshing single records Ability to minimize the resource section Various improvements to SQL and indexes

Scheduler – Performance Enhancements Graphical Assignment User actions that now refresh only a single row instead of refreshing the full graphical view Right click actions on the resources Modified Availability Assign To Assign Available Labor Right click actions on the assignment bar Split Work According to Shifts Split Work Split Work into Three Records Merge Split Assignments Available labor Create Assignment Add/View Notes Various improvements to SQL and indexes

Scheduler – Q&A We are just getting started using Scheduler and have had a request from our users to be able to show the day of the week on the Gantt chart.  Is there a way to do this?   My question is on Graphical Assignment Why did they remove the split screen Gantt View and replace it with the Assignment View and Work View Tabs. The user now has to jump between tabs to see the trades whiles before they could see everything on the one tab.

Resources Wiki: https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wiki/IBM%20Maximo%20Asset%20Management/page/Maximo%20Scheduler Or simply google search for “Maximo Scheduler” to find the wiki

Questions