Project Aerial Site Plan

Slides:



Advertisements
Similar presentations
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Advertisements

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
What to look for, What to correct, How it should look,
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
DENVER ZOO Lion’s Quarters Recycle Cross-connection
Greenwich Peninsula.
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
1 Prevention and Remediation In Selected Industrial Sectors: Small Sites in Urban Areas Athens, Greece June 3-5, 2006 NATO/CCMS PILOT STUDY.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
1 Decontamination, Deactivation, and Demolition David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los.
Petroleum Equipment Institute
Air Sparging at Fort Greely, Alaska Presented by Aung Syn & James Powell.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
Bioremediation of contaminated soil. ..our focus is service…guaranteed! Root causes of oil spillages and site contamination Hose failures on mining machines.
1 Thermal Remediation Services, Inc. Electrical Resistance Heating for In-Situ Remediation of Soil & Groundwater December 10, 2002 Greg Beyke (770)
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
AMBLER BOILER HOUSE REDEVELOPMENT AMBLER BH DEVELOPMENT PARTNERS, LLC RT ENVIRONMENTAL SERVICES, INC.
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
Water Treatment and Distribution in London. Lake Huron & Elgin Area Water Supply Systems London is supplied treated water through the Lake Huron Primary.
Which Standards might apply to these hazards
Simple Tabletop Exercise Objectives:  Test how public health officials and water suppliers work together in a water security incident  Determine methods.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
Background and lessons learned Managers Meeting February 13, 2014.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Logistics and Practical Aspects of Construction of a Large LAr Tank in a Remote Location FLARE Workshop November 5, 2004 Elaine McCluskey Fermilab FESS/Engineering.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
Black & Veatch “The Infrastructure Experts” Len Rodman.
Freshwater Resources Chapter 4, Lesson 3. Where do we get our water from?  Running water  Standing water  Reservoirs: man-made lakes used to store.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Toolik Field Station – Annual Meeting – January Construction – Garage 1.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
L/O/G/O The legal mechanism of drinking water quality in Ukraine and European Union (EU)
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
 171 Public wells sampled in 2014  Bacteria and Nitrate samples taken  38 wells inspected (Surveyed)  1 nitrite sample taken.
CROSS CONNECTION CONTROL PROGRAM
Irvine Ranch Water District Distributed Energy Storage Case Study
CTC 450 Review Open Channel Flow (Manning’s Equation)
RURAL POTABLE WATER INFRASTRUCTURE WATERLINE AND TRUCKFILLS
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Cover Slide TCEQ logo.
Marina Outreach-Recycling
Reducing Solid Waste and Hazardous Waste
Remediation and Reuse of Surplus National Guard Armories
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
FRESNO COUNTY WEST ANNEX JAIL
High-Capacity Solar Pumping in Refugee Camps
Potable Water and Waste Water
International Coordination Meeting Emergency Operations Center
Presented by thomas j. Haglund, general manager
Septic System Construction and Location
WASH Objective 1: Affected people have safe and equitable access to a sufficient quantity of water for domestic needs, per sector's standards Indicator.
Excavation.
CTC 450 Review Open Channel Flow (Manning’s Equation)
Quality Standards Fresh water can contain a variety of harmful substances and organisms. Concentration refers to the amount of substance that is in another.
General Concept On Operational Excellence Open for discussion.
3.1Process selection and the treatment process train
City of Sunrise Wastewater Reuse Program
Effects of Disasters on Wastewater Treatment and Collection Systems
Engineering & Public Works
Jones Island Water Reclamation Facility
MANILLA WATER SUPPLY UPGRADE
Presentation transcript:

Project Aerial Site Plan Project Scope Pleasant Camp Port of Entry Border Crossing Redevelopment Construct new site service building Install buried new buried site services – water, fuel, power, communication Install new water treatment plant Install new power plant Remediate contaminated soils Hazardous materials abatement at four building Development of new water supply well Complete work while existing facility remains operational Project Area Project Aerial Site Plan Project Scope of Work

Background Existing Site Garage, Port office, Generator bldg, & House 9 Power plant and water system Front of site – Highway, House 9, & Generator bldg Back of site – Power transformer, Water tank

New Buried Site Services Water, Fuel, Power Well head repair at new water supply Temporary power & communication services New buried fuel oil & water services New buried power & communication services

Site Works Hazardous Material Abatement, Demolition, & Remediation Backfill material compaction Deep remediation at old generator bldg Demolition of House 9 Remediation near highway

New Site Services Building Project Highlights: A large contaminated soils remediation project was completed over a majority of the site. The excavation and backfill operation was completed within the available short construction season New buried services were installed throughout the site including water distribution, double walled fuel lines, power and communication services. The services were installed with no disruption to existing services. New buried services were strategically located so that contaminated soils remediation could be completed A new water supply well was developed for the project and the station now has a safe potable water supply A Site Services Building was constructed to house the new utility systems for the site including fuel, power, water and communication A new water treatment plant to treat for high Fluoride concentration was designed and constructed and provides excellent drinking water to the station. An emergency generator was installed to ensure that the station can remain operational during power outages The Work was completed on an aggressive schedule at a constrained and congested work site while existing facility remained operational Building in construction Nano filtration system Completed Building Fuel oil system 175 kW emergency generator Port back in winter operation