US TBM Cost Activity Tom Mann December 12 – 14, 2005.

Slides:



Advertisements
Similar presentations
Summary of Current Test Plan for US DCLL TBM in ITER Neil Morley and the US TBM Participants INL, August
Advertisements

Page 1 of 5 Thermal power management TWG direction and plans ARIES Project Meeting 13 December 2007 M. S. Tillack, A. R. Raffray.
Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005.
Strawman R&D Tasks and R&D Costs Neil Morley and Alice Ying INL, August
DCLL R&D Task Area Reports Compiled by Neil Morley for the TBM Conference Call Oct 6, 2005.
WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.
DCLL PbLi Loops Design and Fabrication Plan and Cost B. A. Pint ORNL.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, Overview of R&D, Time Schedule, and Cost Estimation M. Abdou (25 min.) 2.Possible.
1 VLT Research Highlights ITER Test Blanket Module (TBM) M. Abdou and the ITER-TBM Team Outline 1.Introduction and TBWG activities 2.Technical planning.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame.
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
US ITER TBM DCLL ITER-TBM Plan and Cost Summary PbLi Flow Channels He-cooled First Wall PbLi He SiC FCI 2 mm gap US DCLL TBM – Cutaway Views 484 mm US.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Lake Okeechobee Regulation Schedule
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
Jan 2016 Solar Lunar Data.
Project Management W. J. Foyt
Some General Guidelines for the US TBM Costing
Introductory Remarks and Meeting Goals
DCLL TBM Reference Design
Status of the Planning Working Group’s (PWG) Efforts

Milestones & Deliverables BENE III period Jan 06 - Jun07

Average Monthly Temperature and Rainfall
U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005

DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE



Step 3 Step 2 Step 1 Put your text here Put your text here
VLT Meeting, Washington DC, August 25, 2005

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3

Safety Group Program Timeline
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project Management Considerations
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

ITER-TBM Planning and Costing Meeting

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Safety Group Program Timeline
Compiled by Neil Morley for the TBM Conference Call Nov. 17, 2005
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Pilot of revised survey
TITAN - Flow Control and Thermofluid Modeling Tasks
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

US TBM Cost Activity Tom Mann December 12 – 14, 2005

Meeting Objectives December 12 – 14, 2005 Cost Activity Scope Cost Activity Schedule ITER Schedule Detailed Cost Presentations R & D Evaluations Total Project Cost (TPC) Cost Range US TBM Schedule Cost Report Outline Summary To DOE

US TBM Cost Activity Scope

US TBM Costing Activity Milestones 12-Aug-05 Costing Activity Initiated 31-Aug-05 WBS established for Level 6 and lower Responsible persons for Level 6 and lower assigned 7-Sep-05 WBS for Level 6 and lower revised 9-Sep-05 Conceptual design summaries for DCLL and HCCB issued 6-Oct-05 Initial schedule and base cost estimate for WBS level 6 of DCLL and HCCB 27-Oct-05 Initial schedule and base cost estimate for engineering design, procurement/fabrication, and ancillary equipment 7-Nov-05 R&D decision criteria established 30-Nov-05 Complete revised schedule and cost estimate for WBS level 6 and lower (include contingency factor) 12-14 Dec-05 “Physical” Meeting (all information about costing will be presented and discussed) 16-Dec-05 R&D priorities finalized 13-Jan-06 Initial Draft Costing Activity Report Due 15-Feb-06 Complete Draft of Final Costing Activity Report 22-23 Feb-06 Physical meeting (internal review of draft report) 1-Mar-06 Complete incorporating comments into the Report 15-Mar-06 Send Final TBM Cost Estimate Report to DOE 28-Mar-06 “External” review

ITER Preliminary Summary Schedule

Total Project Costs & Cost Range Minimum TPC Estimated TPC Maximum TPC 1.8 Test Blanket   1.8.1 DCLL System and Testing Goals 1.8.1.1 Test Module 1.8.1.1.1 Administration/Integration 1.8.1.1.2 R&D 1.8.1.1.2.1 Tritium Permeation -2.8 1.8.1.1.2.2 Thermofluid MHD 12 1.8.1.1.2.3 SiC/SiC FCI Fab and Properties 2.25 1.8.1.1.2.4 SiC /FS/PbLi Compatibility & Chem 0.75 1.8.1.1.2.5 FS Box Fabrication & Material Issues ----- 1.8.1.1.2.6 He Systems Subcomponent Tests 0.84 1.8.1.1.2.7 PbLi/H2O Hydrogen Production 2.4 1.8.1.1.2.8 Be Joining to FS 4.7 1.8.1.1.2.9 Virtual DCLL TBM 4.3 1.8.1.1.2.10 Advanced Diagnostics 2.7 1.8.1.1.2.11 Integrated Mock Ups, ¼ to ½ Scale 4.34 1.8.1.1.3 Engineering 16.93 1.8.1.1.3.1 Preliminary Design Detailed Design Title III 1.8.1.1.4 Fabrication/Procurement 1.28 1.8.1.1.5 Assembly, Testing and Installation 2.48 1.8.1.2 Helium Flow Loop (P+S) 2.66 1.8.1.2.1 1.12

US TBM Milestones

Meeting Summary Review Activity Cost Estimates Determine R & D Priorities Establish Preliminary Cost Base Line Begin Schedule Integration Including ITER Interfaces Establish Final Report Outline and Writing Assignments – Draft Due January 13, 2006 Report Progress