Market Participant Identity Process – migration to UNC

Slides:



Advertisements
Similar presentations
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
Industry Dialogue on xoserve Services 14 th September 2007.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
DSC Change Committee UK Link Future Releases Proposed Approach
Ofgem Switching Programme Overview
Functional Change through RGMA Review Ph2
Distribution Workgroup 24/11/16
Review of System Alerts
Code Governance Review UNC Modification Proposals
UK Link Technology Refresh
UKL Future Release 2 Cutover/Implementation
Market Trials ChMC 8th August 2018.
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
UNC Trader User – Licence obligations
XRN Construction of a Meter Reading where a Converter and AMR is recorded OR where a Meter with Conversion capability is fitted v2 DWG 28/06/2018.
PRIDe in Gas Model workshop
Indicative PRIDe Project Plan
DSC Change Committee Summary – 12th December
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
DSC ChMC CSS update 7th November 2018
UK Link Programme and ‘Nexus’ UNC Modifications
CSS Update for CoMC 19th September 2018
DSC ChMC CSS update 6th July 2018
UK Link Programme Engagement Forum
Consideration of issues raised by UNC Modification Proposal 0244
Chris Warner UNC Modification Panel 21 December 2017
Chris Warner 5th February 2018
Background MDD is currently managed within SPAA
DSC Change Committee Summary – 10th October
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
DSC Governance Sub Group Recommendations
Transmission Planning Code Review
Ofgem Switching Programme: Central Switching Service consequential change update 9th May 2018.
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
UKL Committee - DN Interruption Update
DSC Change Committee Summary – 13th March ‘19
Provision of Market Share Portfolio for REC CoMC 20th February 2019
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
DSC Change Committee Summary – 13th February ‘19
UIG Task Force Progress Report
CDSP Service Document amendment - high-level activity description*
Market Participant Identity Process – migration to UNC
Richard Fairholme Transmission Workstream 4th September 2008
Consideration of issues raised by UNC Modification Proposal 0244
Ofgem Switching Programme: Central Switching Service consequential update 16th May 2018.
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Implementation Approach Distribution Workgroup – June 2014
DCUSA PARTY PANEL SECRETARIAT OFGEM CHANGE PROPOSAL SUBMITTED
DSC Change Committee Update
Joint Office UNC Elections
High Level System Solution Impact Assessment
Retail Energy Code - Data Access Schedule
UIG Task Force Progress Report
MDD Market Participant Identity Committee - Terms of Reference
Joint Office UNC Elections
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
UIG Task Force Progress Report
Enabling Large Scale Utilisation of Class 3
DSG Governance Group Recommendations.
Enabling Large Scale Utilisation of Class 3
Joint Office UNC Elections
Xoserve Draft UIG Incentives Modifications 20 May 2019
DSC Change Committee Update
REC Data Specification and UK Link File Formats
UIG Task Force Progress Report
MDD Reconciliation - CoMC
UIG Task Force Progress Report
Presentation transcript:

Market Participant Identity Process – migration to UNC

Governance Approach UNC Modification proposed to place the obligation on CDSP to maintain a register of Market Participant Identifies Potentially linked to Section V – Admission GT-D – CDSP and UK Link – potential to consider elements regarding process and publication A separate UNC Modification (not in the SCR) as the migration is planned in advance of REC v2.0 go live Will result in new DSC Service Lines to maintain processes and publication of Market Participant Identities CDSP will report to DSC Committees (noting that additional parties may be impacted beyond Core DSC parties) Change Management Committee – consider ‘technical’ impacts to existing participants systems and processes Contract Management Committee – to provide assurances surrounding process control Guidelines document to be managed via DSC Contract Management – predominantly relates to fact based checks against recognised datasets – e.g. Licensing / Companies House Consideration of non DSC party views

Guidance Document Guidance Document describes: Verification Checks – against data sources Business Rules – against considerations for CDSP to assess Market Participant Applications Obligation to follow a predefined review cycle Approval – Group and Approach Appeals Proposed that the Guidance Document is managed within DSC Contract Management Committee – not a UNCC document

Process Consideration / Proposal Proposed a greater reliance upon the ‘fact based checks’ (Verification Checks) Still proposing to maintain a ‘peer review’ to limit impacts to existing Participant systems Expected that the Business Rules should deal with valid reasons for rejection, therefore expected that this will be exceptional Period of review proposed for [5 working days] – may change as process matures Opportunity for CDSP to review representations discuss with provider and change proposer + publish representations and amended change proposal, if needed Approval at a Committee Challenge regarding timescales particularly in light of electricity Electricity timings aligned to industry meeting following the implementation of the implementation CP1271 ‘Align Market Domain Data Approval Timetable to SVG meetings’. Appeals / Escalation Go Live

Recommendation - Transition Planned to formally transition mastering of MDD Market Participant Identities across to CDSP from February 2019 Includes DSC notice periods to allow for any changes to LWIs and systems Technical changes will be limited – publication source changed to Xoserve.com Maintain existing SPAA MP Id MDD format where possible Ofgem Programme is looking to source Market Participant data from UK Link from November 2019 Gas MDD will be from two sources from February 2020 until REC v2.0 implementation (2021) Proposed that the MDD publication timescales align Note, activities within the two timelines may differ so start point may be different This will rely upon DSC Committee creating a subgroup for MDD to correspond with the SPAA Change Board

Recommendation - Enduring Expected that CSS will want to consume MP Id data from Electricity and Gas in the same format, and to the same timelines Electricity and Gas publication timetables to be aligned Implement a message (format and means is not currently defined) to notify MP Id population (and delta) as part of CSS Consequential changes to CSS Implement a file to notify MP Id population (and delta) as part of CSS Consequential changes to Market Participants