Michael Abbondante Dr. Horman Proposal November 29,2006.

Slides:



Advertisements
Similar presentations
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advertisements

Green Building Ordinance Transportation and Environment Committee
Continuous Value Enhancement Process
Plantronics Secret Green buildings for developing, manufacturing and marketing green products A complete Green Life Cycle.
Cost Benefit Analysis of LEED Green Building Design and Construction Tom Link Youngtao Shi Bill Morrow.
Sustainability by Design NEW 490/CCE 491/CCE 591 3:00-6:50pm, Thursdays, 101 Carmichael Hall Dr Joe Brown, LEED AP Office: 101A Carmichael.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Todays Class: First 20 minutes: Introduction to Leadership in Energy and Environmental Design (LEED) Following 20 minutes: Exam.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Jagadhri Brass and Aluminum Industries Cluster Jagadhri, Haryana State.
Automatic Tube Cleaning System for Condensers and Heath Exchangers
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower System and Component Development (1.1) Department.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
320 W. Beaver Ave. State College PA. Overview Background: The Palmerton Analysis 1: Sustainable Student Apartment Buildings Research Analysis 2: Green.
Michael Abbondante Construction Management. Michael Abbondante Construction Management Presentation Outline Project Overview Sustainability Systems Procurement.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Jon Burke 2006 Mechanical Faculty Consultant: Dr. Jelena Srebric An In-depth Look at a Green Roof.
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
ELECTRICITY COST OF CHILLER AND COOLING TOWER PUMPS KILLING YOU? We Have The RIGHT Solution just for YOU! + =
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
W LTI Final report Shipyard Mokpo Korea / 2013 Steel Plate Dropped Incident Investigation.
Building Introduction & Thesis System 4: Central Geothermal System 1: Industry Standard System 2: Design System System 3: Domestic Geothermal Original.
BDL Green Incentives SwitchMed Connect Barcelona.
EDENTON-CHOWAN SCHOOLS
by Dr. Syed Mohamed Ibrahim M.Tech., Ph.D.,
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Measurable, Meaningful, and Motivational Metrics
High Quality ECONET Manufactured by Manor
Green Building and Sustainable Architecture
Failure mode and effect analysis
Top Quality & Cost Effective ECONET Manufactured by Maniks
Maniks High Quality ECONET for Better Performance
Choosing the Right Residential Air Conditioning and Heating Company.
Enbridge Nest Rebate – Why and How to Take Advantage of the Option?
Cyber Security Fingerprint Secure systems, protect production
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Municipal Efforts for Urban Renewal and Development of Cities
Introduction   Armenia is a beautiful country, we have many assets, but we also have a problem with waste But waste is a problem that we can deal with,
(Additional Information)
Fault Injection: A Method for Validating Fault-tolerant System
Client Name Energy & Water Assessment August 27, 2014
Demographic Transition Model & Age Structure Diagrams
Green Building and Sustainable Architecture
AMBRIDGE AREA HIGH SCHOOL
Making Labour Decisions
Wellington Condominiums Project
Solutions Markov Chains 1
Solutions Markov Chains 1
Solutions Markov Chains 2
Coppin State University
Unit 1 - Your Financial Plan:
Green Building and Sustainable Architecture
Municipal Efforts for Urban Renewal and Development of Cities
Industry-Government Engagement Workshop A-E Cost Engineering Challenges Tulsa, OK 19 March 2019.
Unit 1 - Your Financial Plan:
Pressure.
What is Ecomesh and What are the applications of Ecomesh?
ALASKA SEAFOOD MARKETING INSTITUTE
Heat Recovery Steam Generators
EDENTON-CHOWAN SCHOOLS
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Presentation transcript:

Michael Abbondante Dr. Horman Proposal November 29,2006

Site Plan

Critical ISsues LEED Rating LEED has become a highly analyzed issue in the industry today. Some owners and contractors are now approaching buildings as sustainable and green without attempting a LEED rating. The University of Maryland simply designs sustainable buildings that are easy to accomplish with local materials and manufacturers. Since LEED began for awareness and evolved into a rating system some have asked if a new system should be developed or if LEED should be modified to be simpler for sustainability.

Technical Analysis LEED Silver rating of ASHA The LEED Silver rating drove the initial cost of the ASHA building up, but is proposing to save energy costs in the long run. I would like re-analyze aspects of the building to determine if the building could still remain “sustainable” while lowering initial costs, while still keeping long term costs down. Since the LEED rating is being attained primarily for status. Structural System analysis The current structural system consists of C.I.P. footings and columns and then transitions to structural steel It was a concern early in the project on the lead time of the steel however due to permit delays the steel arrived on time. In an area such as D.C. where C.I.P. is so prevalent I would like to re-design the structural system as C.I.P. while attempting to allow the building to remain silver rated and see the affects on schedule and cost.

Technical Analysis Mechanical Analysis Design-Bid-Build The current mechanical system was designed for LEED rating and sustainable design. It primarily consists of 200 ton chillers with condensers and evaporators, a heat recovery unit, and multiple air-handling units. I would like to re-design parts of the system to allow for similarity throughout the building and lower the up front installation costs while following the above “sustainable” design system from the critical issues above. Design-Bid-Build The ASHA decided to bid the project as a design-bid-build project, however the schedule is crucial to this project since they are currently also paying rent to their former headquarters until this project is complete. The project as a design-build would have saved the project both in the schedule and possibly also in cost. Therefore I will be looking at the project as though it were design-build and determine if the time and possible money saved would have been worth attempt at design-build.

Weight matrix Questions