EC Summary of PAR Development

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Advertisements

[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
LB73 Noise and Location Categories
LB73 Noise and Location Categories
SG CUB Tentative Timeline
Waveform Generator Source Code
March 2014 Election Results
TV White Space Coexistence Plan
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
November 2013 Opening Report
September 2006 Opening Report
March Opening Report Date: Authors: March 2010
March 2007 Opening Report Date: Authors: March 2007
TGp Closing Report Date: Authors: March 2006 Month Year
January 2010 Joint 11/19/22 TVWS Meeting
TGu-changes-from-d0-02-to-d0-03
Contribution on Location Privacy
January Opening Report
IEEE P Project Status Date: Authors: July 2013
Decision on SG Formation
November Opening Report
TGp Closing Report Date: Authors: March 2006 Month Year
July Opening Report Date: Authors: July 2009
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
July 2014 Opening Report Date: Authors: July 2014
July 2012 Opening Report Date: Authors: July 2012
ADS Study Group Mid-week Report
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
Decision on SG Formation
September Opening Report
November 2005 Liaison Report to P1900.2
LB73 Noise and Location Categories
March 2012 Opening Report Date: Authors: March 2012
Addressing White Spaces Across all of IEEE 802
IEEE P PAR Extension Request
TGy draft 2.0 with changebars from draft 1.0
January 2015 SG CUB Closing Report
TGv Redline D0.10 Insert and Deletion
January Opening Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
EC Study Group on TV White Space
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
[ Policies and Procedure Summary]
November 2012 Opening Report
September 2012 Opening Report
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
Motion for Study Group on TV White Space Coexistence
TGu-changes-from-d0-03-to-d0-04
July 2014 Opening Report Date: Authors: July 2014
July Opening Report Date: Authors: July 2010
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November 2014 Opening Report
July 2013 Opening Report Date: Authors: July 2013
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

EC Summary of PAR Development March 2006 doc.: IEEE 802.11-06/0008r0 February 2006 EC Summary of PAR Development Date: 2006-02-15 Authors: Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.19. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <shellhammer@ieee.org> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.19 TAG. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Steve Shellhammer, Qualcomm Steve Shellhammer, Qualcomm

February 2006 Study Group Meetings The Study Group held four one-hour conference calls December 7 December 21 January 4 January 11 The Study Group met face-to-face at the January Wireless Interim Session January 17; 8:00 – 10:00 AM January 17; 10:30 AM – 12:30 PM January 17; 7:30 – 9:30 PM Thirty one people attended at least one conference call meeting or one face-to-face meeting Steve Shellhammer, Qualcomm

Vote on PAR The Study Group Approved the PAR February 2006 Vote on PAR The Study Group Approved the PAR Yes 11 No 0 Abstain 0 The TAG approved the PAR using an electronic ballot Yes 14 No 0 Abstain 0 Did not vote 2 Steve Shellhammer, Qualcomm

February 2006 PAR Status Scheduled to be vote on by the Executive Committee at the March Plenary on Friday March 10 Placed on the March NesCom agenda. Scheduled to be voted on by NesCom on March 29 and the Standards Board on March 30 Steve Shellhammer, Qualcomm