2040 Regional Transportation Plan Sparks Citizens Advisory Board

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Titusville to Edgewater Bike Loop PD&E Study
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner.
King County Metro Long Range Public Transportation Plan Kirkland Transportation Commission_ April 10, 2015.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Lakes Region Transportation Workshop November 15, 2013.
Chittenden County Metropolitan Planning Organization Communities working together to meet Chittenden County’s transportation needs 30 Kimball Ave., Suite.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
1 Introduction to Complete Streets March What are Complete Streets? 2 Complete Streets are streets for everyone, no matter who they are or how they.
Project Overview and Stakeholder Outreach
Affordable Housing and Sustainable Communities (AHSC) Program
Council for Quality Growth North Fulton Advisory Meeting
Update of Transportation Priorities Plan
The Central Avenue Connector Trail
APTA Sustainability and Public Transportation Workshop Benjamin Smith
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
Central Polk Parkway PD&E Study
Gilbert Road Light Rail Extension
Project Status & Right-of-Way Acquisition
YMPO RTP Technical Advisory Committee Meeting
Col. Pike Multimodal: About the Project
I-280 Corridor Study and I-280/Winchester Blvd Project
Community Outreach Spring 2016.
Public Workshop #1 August 18, 2010.
Ad Hoc Advisory Group presentation, August 3, 2016
San Mateo Countywide Transportation Plan update
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
When Big Data Meets Better Data
SANDY SPRINGS CITY COUNCIL MEETING
2016 – 2036 Washoe County Consensus Forecast
Transportation Regional Incentive Program
North Main Street Intersection Improvements at Route 460 Bypass
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
Issaquah-Fall City Road
Transportation Improvement Program and Air Quality Conformity Analysis
D Line and Station Plan overview
Chapter 5. The Transportation-Planning Process
Early Voting Starts Oct. 20 | Election Day Nov
4th Street / Prater Way Bus RAPID Transit Project Stakeholder Meeting
Cost Feasible Plan Development February 24, 2016
2040 Long Range Transportation Plan Update
Technology In Action Session: An On-Demand Sunday Transit Application
projects update ATLANTA district
Contract 60X10 Informational Meeting Weber I-55
BOARD MEETINGS Thursday, August 27th TBA NJHS MEETING SCHEDULE
St. Andrews Agenda Item 11.A & 11.B
2020 RTP Update - Proposed Changes to Transit Projects
2016 – 2036 Washoe County Consensus Forecast
2045 LRTP Overview United Way of St Johns County May 10, 2019.
I Street Bridge Replacement Project
Pre-Proposal Meeting Request for Qualifications
Interlocal Cooperative Agreement FY 20
New Hanover Comprehensive Plan
2045 LRTP Overview North District Citizens Planning Advisory Committee.
Public Workshop September 26, 2019.
Presentation transcript:

2040 Regional Transportation Plan Sparks Citizens Advisory Board November 10, 2016

2040 RTP Community Outreach to Date Youth Forum – February 29th Economic Development Forum – March 8th Regional Rail and Bus Transit Forum - March 14th Freight Forum – March 31st Senior & ADA Transportation Forum – April 14th Veterans Transportation Forum - April 19th UNR-TMCC Millennials Forum – May 2nd Community Workshop – June 28th Community Workshop – August 4th

2040 Regional Transportation Plan Population & Employment Projections Washoe County Consensus Forecasts (TMRPA, 2016) Population to reach 565,402 by 2040 Increase of 120,671 Employment to reach 360,898 by 2040 Increase of 93,568 TRI Center Employment Forecasts (Storey County, 2016) Employment to reach 33,564 by 2040 Increase of 28,464

Proposed Schedule for Major Projects I-80/I-580/U.S. 395 Spaghetti Bowl Improvements Design: 2017-2021 ROW/NEPA: 2017-2021 Construct: 2022-2040 U.S. 395 Widening ROW/NEPA: 2017-2026 Construct: 2027-2040 West Sun Valley Arterial Pyramid Highway – U.S. 395 Connector Construct: 2022-2026 (Phase 1); 2027-2040 (Phases 2-9) Incorporate technical analysis Consensus forecasts Cost estimates Travel demand model forecasts

SouthEast Connector 5.5 Mile Roadway with Four Lanes Includes Paved Walking Path More than 600 New Trees New 80 Acre Wetland Complex

SouthEast Connector Scheduled for Substantial Completion in Dec. 2017 Recent Paving Activities 40% Complete with Final Phase Planned Closed of Pembroke Drive Next Two Weeks

SouthEast Connector Mira Loma Drive Intersection Simulation

SouthEast Connector Mira Loma Bridge Simulation

SouthEast Connector Huffaker Narrows Bridge over Alexander Lake Road Simulation

Pyramid/McCarran Adding Through-Lane in Each Direction on Pyramid Dedicated Turning Lanes on Pyramid and McCarran Paved Multi-Use Path High-Crash Location

Pyramid/McCarran

Pyramid/McCarran Paving Activities On-Schedule for Spring 2018 Completion Business Access Preserved Business Support Program pyramidmccarran.com

4th Street/Prater Way New All-Electric Bus RAPID Transit Line Links Downtown Reno and Downtown Sparks Improve Sidewalks and Landscaping Underground Utilities New Bike Lanes Breaks Ground in Early 2017

www.4thprater.comWay

Your RTC. Our Community. www.rtcwashoe.com