Specification on float equipment

Slides:



Advertisements
Similar presentations
Balloting/Handling Negative Votes. General Overview of Different Levels of Balloting Subcommittee New Standards Major Revisions Provisional Standards.
Advertisements

1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Doc.: IEEE /1442r2 Submission December 2012 Marc Emmelmann, Fraunhofer FOKUSSlide 1 TGai Draft Review Overview Date: Authors:
Session # Maintenance Task Group Opening Report [IEEE Mentor Presentation Template (Rev. 0)] Document Number: IEEE Gdoc.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
FAST TRACKING IN THE IEEE
Relevant Rules on Recirculation
Task Group API 19SS Sand Screens
Accredited Standards Committee C63® - EMC
Revisions to Codes and Standards
Editor’s Guideline Version 1.0
Submission Title: [LB 28 Results] Date Submitted: [14 March 2005]
Accredited Standards Committee C63® - EMC
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
2018/9/ /9/14 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4i May 2011 Closing report Date.
API 17Q Proposed Technical Changes to Rev 0
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: Sydney e/ Liaison Report.
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
March, 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WG-TG4 Opening Report Mar03] Date Submitted:
P802.11n report to EC on request for approval to proceed to RevCom
Standards Development: An Overview
P802.11n report to EC on request for approval to proceed to RevCom
P b Status Sponsor balloting completed:
ISO Task Group Update Wayne Mabry.
Submission Title: [WG-TG3 Opening Report May03]
Motion IEEE Standards withdrawals to RevCom
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
July s Spectrum Resource Measurement to Sponsor Ballot (conditional) Bob Heile, Wi-SUN Alliance.
December 18 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4i conditional approval package Date Submitted:
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
802.11af Liaison Report Date: Authors: March 2011
doc.: IEEE /479r0 Mika Kasslin TGh chair
Motions and Supporting Material for EC Meeting Agenda Items
Standards Break Out Session
doc.: IEEE <doc#>
Task Group G Report March 10, 2003
November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Motions at Mid-Week Plenary] Date.
Sheung Li Task Group J Chairperson March 14, 2003
Motion – P Rev/D2 to Sponsor Ballot
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Closing IEEE 802 EC Friday 15th March 2019
Meetings.
doc.: IEEE /479r0 Mika Kasslin TGh chair
IEEE MEDIA INDEPENDENT HANDOVER
Submission Title: [REVCOM Submission Information]
API 10 F.
2nd Edition: 2019 Winter Standards Meeting
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
Motion – P Rev/D2 to Sponsor Ballot
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
IEEE MEDIA INDEPENDENT HANDOVER
TG 1 November Session Opening Report
The Code-Making Process
Float Equipment API Spec 10F
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
Motion IEEE Standards withdrawals to RevCom
TGaq Closing Report Date: Authors: March 2015 March 2015
Presentation transcript:

Specification on float equipment API Spec 10F Specification on float equipment

Results of Letter ballot 22 Ballots issued 17 affirmative 1 negative 1 abstention 3 no vote Number Voting = 19 = 86% (must be > 50%) Approval Rate = 17/18 = 94% (must be > 66.7%)

Comments 68 Comments Received All comments addressed 36 Editorial 10 General 22 Technical All comments addressed Responses sent to work group members Three comments require additional action

Action items Add a category for 350 degrees F Need to finalize discussion – could add to inventory control problems Consider change for requirement to photograph equipment after testing Requirement will remain as it adds value Change requirement for pressure up time for static test Change to be made to reflect timing of pressure up Final language still being revised

Action items Scaling Original text called to perform scaling as per Q1 The term scaling does not appear in Q1 and will change the section to reflect how qualification of equipment may be done Multiple casing grades of the same size Will work on clarifying language

Forward plan Complete resolution of comments Re-ballot portions that were technically changed Send final document to publications

Timelime Work group participants received comments Received feedback from majority of participants Waiting on negative vote resolution Anticipate finalization of changes by end of February Letter re-ballot in March Specification issued by Q4 2016 ?