SRWG Chair Report March 2015 WECC HQ

Slides:



Advertisements
Similar presentations
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
Advertisements

WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BCCS Alternatives Task Force Update to TSS Andrew Christensen, BATF Chair Presented to TSS Aug 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ADMINISTRATIVE STRUCTURE OF A COMPUTER CENTRE. The administrative structure is being organized in such a way that a skilled professional personnel is.
PowerWorld Case Validation
Visibility Ramu Ramanathan 10/1/2007.
Western Electricity Coordinating Council
WECC MAC Committee Update
TEPPC Review Task Force Meeting February 4-5, 2016
Progress Report for the May 26th 17:31 Event
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Jonathan Young ColumbiaGrid
Philip Augustin TSS Chair
CIIMS Proposal for TOP-003 Approach
Eleanor Ewry Base Case Coordination Subgroup Chair
Nick Hatton Associate Engineer March 9, 2017
ISO New England System R&D Needs
Understanding Area Balancing
IS442 Information Systems Engineering
ColumbiaGrid Planning Meeting RAC/ADS Updates October 13, 2016
MIT tour of the California ISO Control Center March 31, 2015
Transition Plan for Removing Wind Phase 1 Generic Models
Reliability Assessment Committee Reliability Workshop Priorities
ColumbiaGrid Planning Meeting WECC Update February 9, 2017
Specifications Updates and Approval
Jonathan young ColumbiaGrid
Planning Coordinator Gap Update March 25, 2014
Andrew Christensen, SDWG Chair
Joe Seabrook Puget Sound Energy, Inc.
System Review Work Group
Doug Tucker and Jon Jensen WECC Staff
Jonathan Young SDWG Chair
Reliability Assessment Committee Reliability Workshop Priorities
Modeling Subcommittee (MS) Updates
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Andrew Christensen, SRWG Chair
Unscheduled Flow Administrative Subcommittee ISAS Report
Tracy Rolstad TSS Chair
Transition Plan for Removing Wind Phase 1 Generic Models
Jonathan Young SDWG Chair
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Jonathan Young ColumbiaGrid
Joe Seabrook Puget Sound Energy, Inc.
PowerWorld Service Contract on RAS
Jonathan Young ColumbiaGrid
Presentation transcript:

SRWG Chair Report March 2015 WECC HQ John Gross SRWG Chair SRWG Chair Report March 2015 WECC HQ

Topics Where are we headed? Data Preparation Manual status MOD-032 implementation plan and associated DPM 2015 Base Case Compilation Schedule status Base Case Coordination System Model Implementation Schedule Renewable generation dispatch Balancing Authority Area representation WECC contingency analysis RAS Workshop and File Format specifications MOD-033 coordination with MVWG

Where are we headed? What is the point of SRWG’s efforts? Provide data to support study requirements Changes on their way (or already here) Node-breaker representation RAS and contingency modeling Relay emulation How should we react? Develop staged implementation plans Get ahead instead of behind

Data Preparation Manual TSS approved 4 digit zone numbers Also included technical writer edits Rev 4 4 Digit Zone addition Non-BCCS Rev BCCS-4 4 Digit Zone addition Rev BCCS-5 MOD-032 Implementation BCCS DPM Revisions

MOD-032-1 Implementation TSS approved SRWG’s implementation plan and associated DPM Focus will begin shifting to Planning Coordinators How to collect data from non-registered entities?

2015 Base Case Compilation Schedule TSS approved revisions to 2015 schedule Load description Shifting summer operating cases Separate approved item to replace TEPPC case with 10 year light load case Requested by WestConnect, NTTG, ColumbiaGrid, and California ISO

Base Case Coordination System Patch provided following December meeting did not resolve all critical issues Siemens has hired a consultant to support troubleshooting issues Further update?

Model Implementation Schedule New approved models ccomp – cross current compensation Need to add to implementation schedule?

Renewable Generation Dispatch TSS is requesting renewable generation to be dispatched to non-zero Not realistic for all renewables to be off When end-users turn them on, models cause problems Represent realistic output for scenario

Balancing Authority Area Representation TSS and MVWG support including BA representation in base cases Similarities to Westwide System Model More closely mimics actual system controls Comparison to L&R submittals Implementation pending software development and utilizing the new versions Or changing existing Areas in cases to BA’s, no software changes required

BA Representation Demo Create new Area Move buses to new Area by filter Select an Area slack bus Change control to Area Slack Set interchange for new Area to ACE Error Attempt to match existing solution Unspecified interchanges absorbed at slack

WECC Contingency Analysis WECC Staff is continuing to run contingency analysis on operating base cases SRWG will support data collection efforts as needed

RAS and Contingency Modeling April 2, 9-11 MDT (Webinar) Intro to RAS modeling and RAS/contingency file format Types of RAS that can be modeled May 27-29 (Salt Lake) In person workshop Create models of your specific RAS for use PE continuing education credits available

MOD-033-1 Implementation Plan SRWG was directed to work with MVWG to develop an implementation plan Compare planning power flow model to state estimator Compare planning dynamic model to actual system response Merging WSM and planning model?

Questions?