LHC Fast Timing Commissioning

Slides:



Advertisements
Similar presentations
Handshake over DIP 10/08/20091R. Alemany - BE/OP/LHC.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Sophie BaronTTC1 TTC status February 2005 ATLAS electronics.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
02/02/ S. Baron RF-Experiments Timing Meeting - Feb RF CMS ATLAS ALICE LHCb BTPX Status.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
LHC RF re- commissioning for run 2 with planned operation at 6.5 TeV/c and 0.55 A DC current P. Baudrenghien BE-RF with contributions from J.E. Muller,
POWER REQUIREMENTS FOR THE LHC HARMONIC CAVITIES WITH THE FULL-DETUNING SCHEME P. Baudrenghien, T. Mastoridis, CERN BE-RF 2nd LHC Harmonic Cavity meeting,
Sophie BARON, PH-ESSLEADE, 15/06/06 1 TTC upgrade Status May 2006  Overview  AB/RF optical links  Receiver crate  Status and schedules  Documentation.
14/1/2011 LHC Lumi days - J. Wenninger 1 IP positions and angles, knowledge and correction Acknowledgments: W. White, E. Calvo J. Wenninger BE-OP-LHC.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
RF acceleration and transverse damper systems
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
RF-TTC Joint News LEADE, June 2008
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Status of the Beam Phase and Intensity Monitor for LHCb
TTC UPGRADE FOLLOW-UP Sophie Baron, Angel Monera Martinez LECC 2006
Tomography at Injection in the PSB
Digitizers in CCR for transverse wide-band pick-ups
TTC System Status May 2007 System overview Production Status
Monday 14th March Second fill with pilot + 3 nominal bunches
RF and Sequences Andy Butterworth BE/RF
Strategy for long-term support of the TTC system
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Update on ALICE-LHC interfaces & BCM
Thursday morning – optics correction
Fill-pattern Control System for KEKB
TTC Information Meeting
Intra-Pulse Beam-Beam Scans at the NLC IP
Yesterday Issue of injection kicker not pulsing:
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Thursday 10th May - morning
Week 36 plan Todo’s: And also: 12+b injection.
Monday February 28th 8h00: Injection
Yesterday’s morning’s controls issues
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Programme for Saturday 10 July
Machine Tolerances in Cleaning Insertions
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
LHC Morning Meeting - G. Arduini
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Summary for LPC (March 7th, Ralph Assmann)
Tuesday In the morning test cycle with probe for Q’ measurement.
Gap Transient Suppression using Increased Bunch Density
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Beam instrumentation and background monitoring
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

LHC Fast Timing Commissioning P. Baudrenghien AB/RF S. Baron PH/ESE Reminder Final System The way it was Available FAQs Plans for 2008

Reminder BC1 and BC2: For each ring the Bunch Clock is a square wave at the RF frequency divided by 10. Its rising edge has a fixed delay w.r.t. bunch passage. This delay is reproducible from run to run. When present BCx is always locked to the corresponding beam. Orbit1 and Orbit2: For each ring the Orbit is a train of 5 ns long pulses at the Revolution Frequency. The pulse has a fixed delay w.r.t. passage of a bunch in bucket 1. This delay is reproducible from run to run. When present Orbitx is always locked to the corresponding beam. For each ring, bucket 1 is the first bucket after the 3 ms long abort gap (defined from bucket 34442 to 35640) Two bunches in buckets 1 of the two rings collide in IP1 (and IP5) P. Baudrenghien, S. Baron LEADE Sept 2008

Reminder (cont’d) BCref: The reference bunch clock is a square wave at a fixed frequency equal to the collision RF frequency divided by 10. It is locked to the beam during collisions only During collision its rising edge has a fixed delay w.r.t. bunch passage. But the equipment to rephase the beam to the reference clock is not operational yet. In the meantime use BC1 or BC2… OP wishes to fine-tune the reference frequency during physics to compensate for very slow drift in machine circumference (effect of tides,…). This will be done very smoothly (< 1 Hz/s) P. Baudrenghien, S. Baron LEADE Sept 2008

The final system… During SETUP mode All RF fcts are ramped to injection values (including the Frequency Program) Synchro loop is closed to lock RF onto the Frequency Program Bunch Clock 1-2 and Orbit Signal 1-2 are re-synchronized.This causes an interruption in the signals for < 1 ms Injection set-up: Machine must go through INJECTION PROBE BEAM and INJECTION SETUP BEAM (pilot, intermediate,dump, pilot) and then finally INJECTION PHYSICS BEAM (>30 min) We then move through INJECTION PHYSICS BEAM, PREPARE RAMP, RAMP, … Signals are OK until after BEAMDUMP Reproduced from LHC Modes, LHC-OP-ES-0005 P. Baudrenghien, S. Baron LEADE Sept 2008

The final system In general, after BEAM DUMP, the signals will still be there but it is not excluded that an intervention on the RF equipment interrupts them. This concerns BCref as well. They will then be re-started during the following SETUP mode (at the latest) and are guaranteed stable until BEAM DUMP. P. Baudrenghien, S. Baron LEADE Sept 2008

The way it was BCref Was at a fixed 40.078 900 MHz not related to the beam frequency Was (almost) never stopped. Only when rebooting the VME crate Was derived from a commercial Signal Generator at 400.789 MHz driving the Divider-by-10 P. Baudrenghien, S. Baron LEADE Sept 2008

The way it was BC1 and BC2 Orbit1 and Orbit2 Were always at the same frequency (except when one loop would unlock…). First 40.078 878 MHz Then 40.078 893 MHz from Sept 10, 19:30 Then 40.078 896 MHz from Sept 11, 22:00 Capture beam 2, -0.4 mm Were re-synchronized when needed: after re-boot, after opening synchro loop or for test. Should have been locked with the beam… Orbit1 and Orbit2 Were always at the same frequency Were re-synchronized when needed Should have been locked with the beam P. Baudrenghien, S. Baron LEADE Sept 2008

Sophie.baron@cern.ch, Philippe.baudrenghien@cern.ch FAQs 24 typical questions asked by the experiments the last few months, and answered during a Q/A meeting last week. Examples: Setup period: Was BCref in sync with the beam during beam setup period? Were BC1 and BC2 synchronous one to each other? Final system: What are the BC1 and BC2? Will the BCref (and the BCs) be fixed during the flat top? Which are the beam modes during which the BCs are stable? TTC internal: What happens for the output clocks when there is a change of BC source in the RF2TTC? Available on TTC web pages: http://ttc-upgrade.web.cern.ch/ttc-upgrade/New_system/RF-TTC_FAQs_sept_08.pdf Do not hesitate to send us any other questions: Sophie.baron@cern.ch, Philippe.baudrenghien@cern.ch P. Baudrenghien, S. Baron LEADE Sept 2008

Plans for the end of 2008 Finish the visits of the experiments by the RF piquet team Schedule a RF simulation with a full ramping and slow rephasing of the Bunch Clocks, to test the electronics in experiments under these conditions. This is being organized together with RF, Operations and Experiments, probably in December. Collect the status of the timing signals published by the experiments via DIP P. Baudrenghien, S. Baron LEADE Sept 2008

Plans for the end of 2008 (cont’d) Design a ‘RF-TTC page1’ displaying the status of timing signals in real time: Page updated every 10s Status of the full transmission chain at a glance Fine track of the BC frequencies Real time monitoring of the clock jitters and phase Real time monitoring of the beam modes and of the BST status Monitoring of the phase shift with seasonal and daily temperature variations P. Baudrenghien, S. Baron LEADE Sept 2008

Plans for the end of 2008 (cont’d) Rack in the CCC VP110 RF2TTC VMEbus crate ` Scopes Server PC Hard disk Temperature data (GE airport) ~200 kB/s AB – Technical network CERN network External internet DIP Database server Web server Browsers Applications 10 s refresh interval Freq Meter #1 Freq Meter #2 Freq Meter #3 Personal network HUB System installed in the CCR A technical student, Piotr Jurga, will be there for one year to work on this project, beginning 1st of November. Equipment to be added to the existing setup: 3 frequency meters 2 Oscilloscopes 1 hub 1 server PC (special care on the fact that the PC will interact with several domains) Financed with the money left from the TTC upgrade project P. Baudrenghien, S. Baron LEADE Sept 2008