Jeff Chandler - 3rd October 2013 UNC Tx Workgroup

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Exit Capacity Release Methodology Statement
MIPI Changes October 2012.
Transmission Workgroup 7th July 2011
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream 4th July 2007
UNC Modification Proposal 0373
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Simon Trivella – 22nd May 2008 Distribution Workstream
Mod 0452 (PARCA) – Further thoughts
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
Transmission Workgroup June 7th 2012
Draft Capacity & Connection Plan
Update on Exit Capacity Substitution and Revision
Modification 0333A – implementation info
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Transmission Planning Code Review
Modification 501 slides for Workgroup
DN Interruption & Charging
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream 1st September 2005
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
OCC & Standard Commodity Changes
Modification Proposal 0133 – “Introduction of AMTSEC auction”
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Modification 598 update 13 January 2016.
Invoicing Proposals 20th May 2013
Entry Capacity Transfers - Constrained Period
Transmission Workstream 05 November 2009
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Capacity Access Review
Presentation transcript:

Jeff Chandler - 3rd October 2013 UNC Tx Workgroup Mod 0465: Introduction of the Planning and Advanced Reservation of Capacity Agreement (PARCA), Weighted Average PARCA Security. Jeff Chandler - 3rd October 2013 UNC Tx Workgroup

Rational for Raising the Modification 2 This modification is the same as 0452 except for the calculation of the annual PARCA security rate. Section 14.3. SSE believe Security requirements should: Be applied consistently during Phase 2 to ensure all users are treated equally. Not be too low, such that uncovered costs are socialised. Risk of mod 452 with 0.0001 p/kWh/Day charges which results in security of only £18 k/yr. Not too high, such that it is a deterrent to new investment. Risk of mod 452 and cost of £ 5m /year from 0.0278 p/kWh/Day charges.

Rational for Raising the Modification 3 The non-locational PARCA security rates as calculated by NG are detailed below: A methodology to calculate the annual weighted average PARCA security rates to be included in the UNC in Section Y. The value to be updated annually in the Statement of Gas Transmission Transportation Charges. Description p/kWh/d Exit Entry Straight Average of Prices 0.0090 0.0062 Weighted Average using Baselines x Price (exit) and Obligated level x price (entry) 0.0092 0.0110 Weighted Average based on Bookings 0.0079 0.0098

Methodology to calculate the weighted average PARCA security value 4 Once reservation agreed with PARCA user, value will remain fixed for that user for the duration of the reservation term. Another PARCA user applying in another year could have a different value. Current value of PSAex = 0.0079 p/kWh/d. Current value of PSAen = 0.0098 p/kWh/d. Seek to keep calculation simple and eliminate systems work, use registered annual and enduring capacity bookings as at the time of publication of charges and use prevailing charges. On the timing and use of charge, the value would be published in August and effective from 1st October.

Comparison of Security Amounts 5 Locational Rates Capacity (GWh) Capacity Price (p/kWh) One year's Capacity charge Year 1 Year 2 Year 3 Year 4 25% 50% 75% 100% Entry 30 0.0001 £10,950 £2,738 £5,475 £8,213 0.0347 £3,799,650 £949,913 £1,899,825 £2,849,738   Exit 50 £18,250 £4,563 £9,125 £13,688 0.0278 £5,073,500 £1,268,375 £2,536,750 £3,805,125