SENIOR DESIGN PROJECT P08455

Slides:



Advertisements
Similar presentations
Cockpit Design - Kit Car 2008 Axel ERWAST – Glyn GRIFFITHS.
Advertisements

Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
MOTORCYCLE TOOLS Multifunction tools 7 Maintenance sets 6 Axle and bearing 5 Wheel, spoke and suspension 4 Tools for drives 3 Ignition and carburation.
Cutting Machines Foldable Information. DRILL PRESS Related Terms  Center punch  Cutting Oil.
ME 450 Group Adrian Conrad Chris Cook Thomas Hylton Nathan Wagers High Pressure Water Fixture Conceptual Design Analysis December 10, 2007.
Remaining lectures Last lecture by Dr. Darpe: Wed, 3 rd Oct Lectures by Prof S R Kale 22 st Oct (Mon) 24 th Oct (Wed) and 31 st Oct (Wed) 11am – 11:55am.
MAE 243 MECHANICS OF MATERIALS COMPUTER BASED DESIGN PROJECTS Dr. Konstantinos A. Sierros.
Methods of Attaching Components to a Shaft
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
Screws, Fasteners, and the Design of Nonpermanent Joints
CM 197 Mechanics of Materials Chap 20: Connections
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
Senior Design: Validation of Design December 15, 2008.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
Lathe Practice.
Final Presentation Crew: Mike Lanteigne Wallace Barkhouse Scott Donahoe Blair MacKay Captain: Dr. Jimmy Chuang April 4 th 2012.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
MECHANICS OF MATERIALS Third Edition Ferdinand P. Beer E. Russell Johnston, Jr. John T. DeWolf Lecture Notes: S.A.A.Oloomi CHAPTER © 2006 Islamic Azad.
NUMI Transmission Line (TL) Review: Design Details TL through Block & Beyond Design/Status Bill Boettinger FNAL April 23, 2003.
Introduction – Concept of Stress
Overview of Mechanical Engineering for Non-MEs Part 2: Mechanics of Materials 6 Introduction – Concept of Stress.
Structural Engineering
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Systems Level Demo P15010: Arc Wheelchair Swing. Maggie Bates BS/ME Industrial & Systems Engineering Owen Breese BS Mechanical Engineering Elizabeth Cutolo.
PRESENTED BY SUBMITTED TO ANUJ KUMAR SRIVASTAVA Mr. DEEPAK SHARMA ME-1 3 rd YEAR COORDINATOR AND FACCULTY ROLL NO IMSEC MILLING.
Eric McDonald Drew Krutak Jeremy Hanneman. Our objective was to design and fabricate a High-Speed Treadmill that is capable of measuring the horizontal.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Chapter 11 - Keys, Couplings and Seals
2K Cold Box Structural Analysis
Mezzanine Update.
Production Planning – Designing Tooling
PIPE SPOOL WELDING SYTEM – LIGHT VERSION
MICE Partial Return Yoke Mechanical Design
Engineering 1 Structural Analysis Tom Rebold.
Introduction – Concept of Stress
Concept of Stress.
Tilt N’ Store Design Analysis
Remaining lectures Last lecture by Dr. Darpe: Wed, 3rd Oct
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Chapter : 01 Simple Stresses
Chapter 26: Mechanical fasteners 1
Lathe Practice.
Cymbal Stand Surface Mount Hinge Light Rail Structure Bracket
1.6 Allowable Stress Allowable Load < Failure Load
Equilibrate System upgrade
RIT Senior Design Team P13458 Systems Design Review 1/18/13
P08002-Automated Parallel Bars
Design Review P09006 – Upper Extremity Exerciser
Lathe Practice.
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Introduction – Concept of Stress
SENIOR DESIGN PROJECT P08455
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
SENIOR DESIGN PROJECT P08455
Tilt N’ Store Design Analysis
Part II Design of Fasteners and Joints
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
SENIOR DESIGN PROJECT P08455
Value Engineering in a Manufacturing Facility
Concept of Stress.
Valve stem “gag” mechanism
Bunker Wall Design Wall ESS
For more information contact: Mike Newsky,
Presentation transcript:

SENIOR DESIGN PROJECT P08455 Value Engineering Dresser Rand Compressor Case System Review SENIOR DESIGN PROJECT P08455 Stephen Papa (IE- Project Manager), Chris Bulawa (ME), John Foley (ME), Eric Hodecker (ME) and John Roylance-(IE)

Value Engineering in a Manufacturing Facility Objective: Design and build a safe compressor final internal assembly stand for the Olean Manufacturing Facility. Key Needs: Adjust to different sized compressors. [Length (35”-86”) and Diameter 21”-43”)] Be able to support up to 30,000lbs for a week. Support different sized Heads Work bench to support assembly tools

Current Process Head Pipe Clamps to Support Head Top Half is Removed During Final Assembly Bundle Cradles Complete Bundle on Contract Tooling

Professional Engineer Certification Need for PE Certification – Dresser-Rand must use outside source Working with Dr. Hensel to find a PE Bridging contract between PE and Dresser-Rand

Final Design Sub Systems: Compressor Stand Tool table (refer to page 1)

Ergonomics Picture illustrates work surface height relative to person 5’5” (5th percentile male) in stature. Body part lengths provided by NIOSH anthropometric tables (refer to page 27)

Compressor Stand System Design Highlights: Adjustable V and length using track system Supports optimum height work level Risks/Concerns: Ergonomics of smallest compressor Play in Pin Holes Track stress while compressor loading or adjusting Tool Table joints (refer to pages 1-6)                                                 

Adjustability System: Length Adjustment System: Versa Mount guide block and rails Mounted to stand crossbeams 3000lbs dynamic load per mount Adjust length using boom crane Diameter “V” Adjustment System: Pinned V-hold Low friction sleeve for ease of height adjustment Adjust for different size compressors to accommodate work envelope

Analysis and Calculation Key concerns from the concept Review: Strength of Diagonal “V’s” V-Hold weld Strength in Shear Slop in the Pins Tools for Analysis: Hand Calculations Computer Software (Pro-E and Pastram) (refer to pages 7-15)

Meshed Model with Forces Half of Compressor Stand Analyzed:

Stress Analysis Half of Compressor Stand Analyzed Applied Force on V-Hold Constrained all DOF on Stand Legs

Deflection and Stress

Tool Table System Design 13 Highlights: Adjustable height Able to be moved to different locations Lip on Table Surface (refer to pages (16- 25)

Adjustability System: Joints: Steel on Steel or Bearings for tool table height adjustment Pins: Press Pin Quick release and placement Attachable for one integrated system Detachment from the Compressor Stand: 1 bolt attachment Mounting holes at center and ends of stand

Bill of Materials Highlights: Steel Material A36 A500 Manufactured parts Key Components needed to be bought Estimated Cost of Materials BOM.xls (refer to pages 28-40)