Lostock Sustainable Energy Plant (SEP) Local Liaison Committee

Slides:



Advertisements
Similar presentations
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Advertisements

New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
Installation of New CHP system at the Old Aberdeen Campus.
1 Broken Hill Solar Plant Community Consultative Committee July 2014 Date: 14 July 2014.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON HOME AFFAIRS STATUS OF THE AMENDMENTS TO THE REFUGEE ACT AND RELOCATION OF REFUGEE RECEPTION OFFICES CLOSER.
Southwark’s New District Heating Network.
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
THE SOUTH WESTERN RAILWAY Twickenham Station Platform Improvements 29 th January Twickenham Stadium.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.
Caythorpe Gas Storage Project Liaison Committee Meeting 28 th September 2009.
Three Kings Quarry 19 August 2013 – Site Liaison Group Meeting Site Monitoring Report 1.
ARTICLE 4 DIRECTION Houses in Multiple Occupation.
Energy for the Future Belene Nuclear Power Plant Project Status.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
Pre-application process in England and Wales Sixth meeting of the Task Force on Public Participation in Decision- making under the Aarhus Convention
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
Green College Initiative Jem Morris. Green College Initiative The College has created a ‘Green College’ group that meets at least every 8 weeks The group.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
MENTAL HEALTH CLINIC Siting Process and Analysis.
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Preparation of the Self-Study and Documentation
Progress Briefing - Energy Initiative
Department of Environmental Quality
Allington Waste Management Facility
East Area Renovation Project Team meeting # 2 – EDMS News
Western Michigan University Central Power Plant
Robinson Park Recreation Center Renovation
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Loders Neighbourhood Plan
Anna Preston Vance, HA of Paris
Carbon Cutting Challenge
Lostock Sustainable Energy Plant (SEP) Local Liaison Committee
POC Procedures Working Group (POC-pWG)
Janet R. Schlueter Senior Director, Radiation and Materials Safety
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
CR3 and Crystal River Energy Complex
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Emily Pike Community Liaison Manager, SUEZ
All Wales Safeguarding Procedures Review Project
Consideration of Action Re: Commercial Cannabis Businesses
Lostock Sustainable Energy Plant (SEP) Local Liaison Committee
Department of Environmental Quality
Facilities Modernization Program
Julie Woosley, Division of Waste Management
PRESENTATION TO THE PORTFOLIO COMMITTEE ON HOME AFFAIRS
Julie Woosley, Division of Waste Management
Strategic Planning Timeline Overview
Lostock Sustainable Energy Plant (SEP) Local Liaison Committee
Lostock Sustainable Energy Plant (SEP) Local Liaison Committee
Regulatory Reform Act (SL ) Periodic review and expiration of existing rules NC Environmental Management Commission March 13, 2014 Jeff Manning.
Release 3 Scope & Proposed Plan
Julie Woosley, Division of Waste Management
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
LNG Workshop Bilbao, March 13th 2009 GLE.
EU legislation on noise emission in the environment by equipment for use outdoors: latest developments September 2018 European.
Indiana Department of Environmental Management Office of Water Quality
Richland Creek Water Supply Program Program Update
Ward Park Restroom Timeline
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
New Special Education Teacher Webinar Series
Presentation transcript:

Lostock Sustainable Energy Plant (SEP) Local Liaison Committee 13th September 2018

AGENDA Welcome & Introductions Proposed Power Upgrade Application Update on Site Works Since Last Meeting Proposed Work Activities in Next 3 to 6 Months Subsequent Project Works Date of Next Meeting AOB

Welcome & Lostock Site Rules Welcome to the sixth Lostock SEP Local Liaison Committee Office Rules TATA representative will act as Guardian No fire alarm test planned for today. If alarm sounds follow Guardian to muster point in staff car park at the rear of the building Toilet facilities on the first floor Smoking Prohibited in the office.

Project Overview Lostock Site History and Overview Lostock Site commenced soda ash production in 1907; Brunner Mond (now TATA Chemicals Europe Ltd) acquired the site in 1904. Demolished and rebuilt new manufacturing plant. Soda ash produced from brine (NaCl) and carbon dioxide (CO2) Brine supplied from the Holford salt cavities operated by Inovyn Carbon dioxide produced from the thermal decomposition of limestone with coke. Limestone railed in from Buxton Ammonia is used as a catalyst (pH conditioner) to assist the chemical reaction Soda Ash production is energy (heat) intensive. Steam required to drive the chemical reactions and dry the product. The site operated its own coal fired power station (six boilers) up to the year 2000. Decommissioned when new gas fired CHP power plant started at Winnington

Lostock Site Aerial

Lostock SEP: Project Overview

Power Upgrade Variation Application Lostock SEP Project Power Upgrade Variation Application

Power Upgrade Variation Application Background As previously reported, technical studies conclude that the electrical power output the plant could deliver to the national grid could be increased. Proposal developed for an electrical power increase of up to a further 30 MWe This increase is delivered : Without change in any of the parameters permitted under the existing consent granted by the Secretary of State on 2nd October 2012 for construction and operation of an EFW station generating up to 60 MWe Enabled by efficiency improvements since consent was granted. Special Local Liaison Committee meeting held on 15th March with Chris LeCointe, RPS, in attendance Information leaflet and CD provided to allow local information sharing and opportunity to ask questions.

Power Upgrade Variation Application Progress Update A Variation Application was formally submitted to DBEIS seeking to vary the 2012 Consent to increase the power output of the Plant from the currently consented 60 MW to up to 90 MW. DBEIS provided notice to TATA under Regulation 4(6) of the Variation Regulations that it considers the Variation Application to be suitable for publication. TATA consequently published notice in accordance with Regulation 5(3) & (5) of the Variation Regulations on Thursday 2nd and 9th August 2018. Application documents made available for inspection: On SEP website: www.lostockpower.co.uk At Northwich Library and at CWACC, Wyvern House, Winsford Representations on the Variation Application were invited until 7th September 2018.

Power Upgrade Variation Application Progress Update (2) Statutory Consultees included: Cheshire West and Chester Council and the Environment Agency Other consultees included: Local MP’s, ward Councillors and the Local Liaison Committee TATA will, via RPS respond to DBEIS on the points raised in the representations received. The redacted representations and TATA’s response will be uploaded to the SEP website. DBEIS will consider the Variation Application and representations received and may consent to vary the 2012 Consent or may refuse to vary the consent.

Update on Site Works Since Last Meeting Lostock SEP Project Update on Site Works Since Last Meeting

Work Activities Since Last Meeting Collection of the necessary information and assessments to meet the requirements of planning condition 26 discharge approval (Prevention of Contamination of Land). Site work commenced in January and completed in April. Sample analysis and reporting completed Next steps - Application submission for approval

Work Activities Since Last Meeting Site activities starting to ramp up; Currently Five Contractors working on site, with approximately 50 staff A number of enabling work packages have been scoped and now being reviewed and signed off. Mechanical and Electrical Contractors employed to identify and tag existing services that require to be relocated / replaced / removed as part of the enabling works Detailed design of the new water treatment plant and electrical sub-station being progressed Design specification for tie-ins to be completed later this year Asbestos surveys of pipe bridges and redundant power station buildings commenced. Following on with asbestos removal activities Ecology – Birds, Reptile and Bat surveys

Proposed Work Activities Over Next 3 to 6 Months Lostock SEP Project Proposed Work Activities Over Next 3 to 6 Months

Work Activities in Next 3 to 6 Months Safety and operability studies for the new water treatment plant and electrical sub-station Commence site clearance to allow construction of new water treatment plant and electrical sub-station Complete identified tie-ins to allow water treatment plant to be commissioned Complete design sign off for the Enabling Work packages. Primarily office based activities Continue with asbestos removal activities Commence demolition of sections of the redundant power station buildings

Work Activities in Next 3 to 6 Months Pre-Commissioning Planning Condition Applications Develop programme to submit applications Primarily office based activities Environmental Permitting Conclude with Environment Agency the TATA and LSEP permit boundaries

Subsequent Project Works Lostock SEP Project Subsequent Project Works

Lostock SEP: Subsequent Project Works Efforts during early 2019 will largely focus on: Complete asbestos removal and demolition of the old coal fired power station buildings Relocation of services to allow construction works to commence later in the year.

Lostock SEP: Date of Next Meeting Proposed Dates for Future Meetings: Thursday 29th November 2018 Thursday 28th February 2019 Thursday 23rd May 2019 Thursday 12th September 2019 Thursday 28th November 2019

Lostock SEP Project AOB