Testbeam status report

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
LHCb VErtex LOcator & Displaced Vertex Trigger
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Road to SiD Test beam at LNF (Frascati) BTF 23 – 30 June. MarchAprilMay June July 22 June DEAD LINE June: Assembly of electronics parts over the PCB (APV25.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
Villa Olmo, Como October 2001F.Giordano1 SiTRD R & D The Silicon-TRD: Beam Test Results M.Brigida a, C.Favuzzi a, P.Fusco a, F.Gargano a, N.Giglietto.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Eli Piasetzky Tel Aviv University Beam Scintillating Fibers PSI, Technical Review, July 2012 Guy Ron Hebrew University Israel.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
IFR Detector R&D status
Analysis of LumiCal data from the 2010 testbeam
Wander baldini on behalf of the SHIP Muon Group
LKr status R. Fantechi.
Micromegas Vertex Tracker Status Report
Experimental Method: 2 independent detectors on both sides of IP
Claudia Cecchi University of Perugia and INFN
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
MDT and analog FEE mass production:
RD51-WG X June test beam experience: useful information for October
Tests of a MM octant prototype towards a Micromegas TPC Polarimeter
SHiP straw tracker prototype tests
The interaction region for FIRST (status report)
Luminosity Monitor Status
DESY Test Beam Facilities - Status and Plan
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Cosmic Ray Tracker and Detector Control System at the GIF++
LHCf – CSN1 Trieste O. Adriani
EMC Electronics and Trigger Review and Trigger Plan
Preparations for test of
Particle ID Diagnostics in the MICE Beamline
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Experimental Method: 2 independent detectors on both sides of IP
Setup for testing LHCb Inner Tracker Modules
ZDD status BESIII Collaboration Meeting, September 2012
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
A Beam telescope for the EMC testbeam
Presentation transcript:

Testbeam status report S1,S2 Quartz(?) C1 C2 EMC Si1,Si2 Ancillary systems procurement DAQ system Crystal measurements (Some) Mechanical issues More issues?

Ancillaries S1/S2 : two 10cm X 10cm X 1cm plastic scintillators, to be used in the trigger and to synchronize the two independent DAQ systems, @LNF and @CERN. NOT YET READY C1/C2 Cerenkov counters, CERN setup: the detectors are provided by CERN in the beam line, two channels, electron/pion separation, radout via ADC VME system. DAQ system integrated with beam telescope and new electronics channels . @LNF we do not have/need external particle identification. The beam telescope (2 X-Y planes, Fermi sensors, single sided detectors, they are nearly 10x10 cm^2, 50 micron strips, 225 micron pitch, 384 strips per wafer, 400 micron silicon) is ready. They have been assembled and pre-tested in Mipot (Trieste) and will get back to Perugia tonight. In the next couple of weeks tests with cosmic rays and development of DAQ software.

Ancillaries Quartz bar with photomultiplier readout. Is it ok a simple peak sensing ADC? If yes, we have it, otherwise we need to get an ADC for that. DAQ System: VME based (VME V8010 CAEN Crate) BIT3 controller Sirocco ADC for the beam telescope silicon strips V1720 Sampling (250 MHz) ADC for the 5 LYSO channels equipped with the new electronics (we have a total of 8 channels) V785 peak sensing ADC (16 channels).

Crystal measurements (Mechanical quality) The five crystals delivered so far by Saint-Gobain have been measured (already reported on Feb 24th). All, but one, sized are within the 100 micron tolerance. Saint-Gobain has been informed. To be repeated on the following 7 crystals.

Crystal measurements (LY) We are setting up a testbench to measure crystals LY (for the 12 crystals). Tests will start this week.

Mechanical structure (1)

Mechanical structure (1) Kapton cables length 8cm. CsI crystals moved back by 2 cm to facilitate connection of cables to patch panel…??

Mechanical structure (2) Moving back the CsI crystals by 2 cm will allow a more confortable assembly of the device.

Mechanical structure (3) Box made with Cu for electrical shielding. 5 mm walls except for the side facing the beam: 1mm Cu or 1 mm G-10 Cu plated window in the bam spot.

Other issues

Logistics @LNF and @CERN At some point, sooner for LNF, we need to know an exact list of people that will be around for the beamtest. Both Labs needs special paperwork to be accessed outside regular working hours. The access information for LNF can be found at the following link: http://www.lnf.infn.it/acceleratori/btf/access/ @CERN, since the testbeam is in October, we still have quite some time.