Calibration: S2 update, S3 preliminaries

Slides:



Advertisements
Similar presentations
LIGO-G Z S3/S4 Calibration A cast of thousands… including Peter Fritschel, Gabriela González, Corey Gray, Mike Landry, Greg Mendell, Brian O’Reilly,
Advertisements

LIGO-G Z Beating the spin-down limit on gravitational wave emission from the Crab pulsar Michael Landry LIGO Hanford Observatory for the LIGO.
8/13/2004 Stefan Ballmer, MIT / LIGO Hanford 1 Length and angular control loops in LIGO Stefan Ballmer Massachusetts Institute of Technology LIGO Hanford.
Calibration of the gravitational wave signal in the LIGO detectors Gabriela Gonzalez (LSU), Mike Landry (LIGO-LHO), Patrick Sutton (PSU) with the calibration.
Spring LSC 2001 LIGO-G W E2 Amplitude Calibration of the Hanford Recombined 2km IFO Michael Landry, LIGO Hanford Observatory Luca Matone, Benoit.
LIGO- G Z Optimally Combining the Hanford Interferometer Strain Channels Albert Lazzarini LIGO Laboratory Caltech S. Bose, P. Fritschel, M. McHugh,
G Z 1 Block-Normal, Event Display and Q-scan Based Glitch and Veto Studies Shantanu Desai for Penn. State Burst Group And Glitch Working Group.
LIGO- G Z March 22, 2006March 2006 LSC Meeting - DetChar 1 S5 Spectral Line Catalogue Status Keith Thorne (PSU) for the Spectral Line Catalogue.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 LIGO-G Z Penn State / LIGO Scientific Collaboration 2003 March 18 Calibration Testing Patrick Sutton, with Michael Landry, Gabriela Gonzalez,
LIGO-G D LIGO calibration during the S3 science run Michael Landry LIGO Hanford Observatory Justin Garofoli, Luca Matone, Hugh Radkins (LHO),
LIGO-G D 1 S3 expectations, S2 calibration M. Landry LHO CW Search Group F2F Milwaukee, Jun
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
Calibration Accuracy of LIGO Interferometers Brian O’Reilly LIGO Livingston Observatory Rana Adikhari (MIT), Peter Fritschel (MIT), Gabriela Gonzalez(LSU),
9/23/08G Z Status of the S5 calibration Michael Landry For the Calibration Committee LSC September 2008 Michael Landry For the Calibration Committee.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO- G Z AJW, Caltech, LIGO Project1 Use of detector calibration info in the burst group
1 Time-Domain Calibration Update Xavier Siemens, Mike Landry, Gaby Gonzalez, Brian O’Reilly, Martin Hewitson, Bruce Allen, Jolien Creighton.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
LIGO-G DM. Landry – Amaldi5 July 9, 2003 Laser Interferometer Gravitational Wave Observatory Monitoring LIGO Data During the S2 Science Run Michael.
S4/S5 Calibration The Calibration team G Z.
LIGO- G Z AJW, Caltech, LIGO Project1 Use of detector calibration info in the burst group
3/19/08G D S5 Calibration Status Brian O’Reilly For the Calibration Committee LSC March 2008 Brian O’Reilly For the Calibration Committee LSC.
LIGO-G I S5 calibration status Michael Landry LIGO Hanford Observatory for the LSC Calibration Committee LSC/Virgo Meeting May 22, 2007 Cascina,
Displacement calibration techniques for the LIGO detectors Evan Goetz (University of Michigan)‏ for the LIGO Scientific Collaboration April 2008 APS meeting.
Data Quality Vetoes in LIGO S5 Searches for Gravitational Wave Transients Laura Cadonati (MIT) For the LIGO Scientific Collaboration LIGO-G Z.
LIGO-G Z April 2006 APS meeting Igor Yakushin (LLO, Caltech) Search for Gravitational Wave Bursts in LIGO’s S5 run Igor Yakushin (LLO, Caltech)
LIGO-G DM. Landry – Hanover LSC Meeting, August 18, 2003 LIGO S2 Calibration Michael Landry LIGO Hanford Observatory Representing the calibration.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
A Waveform Consistency Test for Binary Inspirals using LIGO data LSC Inspiral Analysis Working Group LIGO-G Z LSC Meeting Andres C. Rodriguez.
Errors and Uncertainties In Measurements and in Calculations.
Calibration in the Front End Controls Craig Cahillane LIGO Caltech SURF 2013 Mentors: Alan Weinstein, Jamie Rollins Presentation to Calibration Group 8/21/2013.
Searching for Gravitational Waves from Binary Inspirals with LIGO Duncan Brown University of Wisconsin-Milwaukee for the LIGO Scientific Collaboration.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
S5 BNS Inspiral Update Duncan Brown Caltech LIGO-G Z.
3/21/06G D S4/S5 Calibration Status Brian O’Reilly For the Calibration Committee LSC March 2006 Brian O’Reilly For the Calibration Committee LSC.
MODELING THE CALIBRATED RESPONSE OF THE ADVANCED LIGO DETECTORS Luke Burks 2013 LIGO Caltech SURF Mentors: Alan Weinstein, Jameson Rollins Final Presentation.
LIGO-G Z S2 and S3 calibration status Michael Landry LIGO Hanford Observatory for the Calibration team Justin Garofoli, Luca Matone, Hugh Radkins.
LIGO-G E1 Reviewer Report for the S2 Time-Domain Pulsar Search Teviet Creighton, Andri Gretarsson, Fred Raab, B. Sathyaprakash, Peter Shawhan.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
LIGO-G Z SenseMonitor Updates for S3 Patrick Sutton LIGO-Caltech.
LSC - 03/23/05SB/SWG1 Stochastic HW Injections in S4 Sukanta Bose Washington State University, Pullman For the Stochastic Working Group / Inject. Team.
LIGO- G Z AJW, Caltech, LIGO Project1 First look at Injection of Burst Waveforms prior to S1 Alan Weinstein Caltech Burst UL WG LSC meeting, 8/21/02.
G Z August 17, 2004 S2/S3 Calibration Gabriela González, Louisiana State University For the Calibration Team ( cast of thousands!) LIGO Science.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
Calibration/validation of the AS_Q_FAST channels Rick Savage - LHO Stefanos Giampanis – Univ. Rochester ( Daniel Sigg – LHO )
LIGO-G Z S5 calibration: time dependent coefficients  Myungkee Sung, Gabriela González, Mike Landry, Brian O’Reilly, Xavier Siemens,…
3/21/2007 LIGO-G Z S5 Data Quality Investigation Status John Zweizig LIGO/Caltech LSC/Virgo DetChar Session MIT, July 25, 2007.
Calibration and the status of the photon calibrators Evan Goetz University of Michigan with Peter Kalmus (Columbia U.) & Rick Savage (LHO) 17 October 2006.
Calibration in the Front End Controls Craig Cahillane Luke Burks LIGO Caltech SURF 2013 Mentors: Alan Weinstein, Jamie Rollins Presentation to Calibration.
October 2006, LIGO Hanford Observatory
S5 First Epoch BNS & BBH Inspiral Update
Overview of E10 / S3 Hardware Injections
S3 time domain known pulsar search
S2/S3 calibration Gabriela González, Louisiana State University Plus
Report on the S2 Run Keith Riles (University of Michigan)
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Hardware Injections in S4
Status of the LIGO Detectors
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Towards the first coherent multi-ifo search for NS binaries in LIGO
First look at Injection of Burst Waveforms prior to S1
Update on LLO-ALLEGRO stochastic analysis
h(t): are you experienced?
ALLEGRO calibration for the LLO-ALLEGRO stochastic analysis
John Zweizig LIGO/Caltech
Improving LIGO’s stability and sensitivity: commissioning examples
S3 Performance of the LIGO Interferometers as Measured by SenseMonitor
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Presentation transcript:

Calibration: S2 update, S3 preliminaries Michael Landry LIGO Hanford Observatory Representing the calibration team: Rana Adhikari, Peter Fritschel, Justin Garofoli, Gabriela Gonzalez, Luca Matone, Brian O’Reilly, Hugh Radkins, Patrick Sutton LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 Calibration Basics I Xi = AS_Q(fi,t) . R(fi,t) Xi / AS_Q(fi,t) = R(fi,t) = [1 + a(t) b(t) G(fi) ] / a(t) C(fi) R(f): Response Function a: Scale Factor (from Calibration Line) G(f): Open Loop Gain = C(f)D(f)A(f) LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 Calibration Basics II We choose a time t0 and measure a0 ,G0 and R0 . This allows us to extrapolate to any time t using the amplitude of the calibration line (or lines). The amplitude a(t) is a function of the alignment, dependent on the carrier power in the arms and the sideband power in the recycling cavity. a(t) is tracked throughout the science segments. R(fi,t) = [ 1 + a(t) b (t) G(fi) ] / a(t) C(fi) LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 S2 calibration status Online calibration with accuracy of ~20% was available with 1 hour latency Interim calibration (V2) issued with corrected DC calibration for LHO Final calibration (V3) released ~2 weeks after Hanover LSC, included correction to LLO DC calibration Information for data quality flags completed Additional Wednesday talks relating to calibration include two from Xavier Siemens LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 S3 calibration status Online calibration available with 1 hour latency, based on E10 preliminary calibration accuracy varies between IFOs (H1 opened S3 in best-known state, H2 less so, L1 calibration postponed until Nov 7th ) Opening calibration run performed, analysis is being performed at LLO, awaits at LHO Consistent model for all IFOs in hand Hardware measurements complete at LLO, only representative ones made at LHO Cross-coupling measurements obtained for noise budget LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

S3 calibration status, contd. Input matrix being dynamically calculated (Sensemon monitors this) Sensemon and autocals on NS-NS inspiral range with high precision (few percent) at LHO, however, some uncertainty remains regarding agreement at LLO: being sorted by Gaby/Brian/Patrick/Rana. Amplitude of calibration lines being analyzed E10 cal frame conversion done by Duncan; we will try and do this conversion using tagged version of LAL for S3 Actuation functions now produced by model. UL groups should use these for injections. Analysis using Vn S3 cals should account for this systematic, i.e. if they employed simple pendulum Target date: S3 V1 calibration in two weeks Target date: S3 Vfinal calibration Feb 1st LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 DC calibrations Mike’s NYT nightmare: Stan comes to me and says, we missed a galactic SN because you were doing %!&!* DC calibrations? Hanover: Have redundant measurements, including sign toggling, fringe counting, free-swinging and PZT fine actuator Will limit the number of redundant measurements during the S3 run; making some of these beforehand S3: LLO completed measurements Nov 7. Most of this done before the run at LHO, quick check on Monday Nov 3 (see nightmare above) DC calibrations in various states: Good on H1 (<6%), poor on H2 (~20%), and I’m not sure about LLO just yet All data in hand however, Brian and I just need to analyze them LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 S3 strain comparison Preliminary!! LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 S1-2-3 strain comparison H1 S3 Preliminary!! A. Lazzarini LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003

M. Landry – LHO LSC Meeting, November 12, 2003 Conclusions V3 (final) calibration available. S2 calibration errors very late (haven’t been pushed by anyone); ready by Dec 10th S3: calibration status staggered with H1 most mature, H2 less so, L1 analysis underway. We had promised S2 V3-like calibration for the start of S3, we should meet this goal in 1-2 weeks LIGO-G030605-00-D M. Landry – LHO LSC Meeting, November 12, 2003