NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review Group 0221: User Commitment Best Practise guidelines for Gas and Electricity Network Operators Credit Cover (2005)
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Industry Dialogue on xoserve Services 14 th September 2007.
Connected System Exit Points Options for strategic regime change Chris Warner.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
SoS Report PAC – 13th December 2016.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Supply Point Register 7th December 2011
UNC Modification Proposal 0202 National Grid Distribution
Transmission Workstream February 2009
Entry Capacity Overrun price calculation
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Transmission Workstream 4th July 2007
UNC Trader User – Licence obligations
Transmission Workstream 6th January 2010
Modification Proposal 0192 – Draft Business Rules.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Incentives 26 September 2018.
Connected System Exit Points Administration Options
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Exit Capacity Substitution and Revision
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
Joint Office Presentation for Modification 0678
UNC Modification Proposal 0201 National Grid Distribution
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Mod Proposal 0268 : AQ Backstop Date
UNC Modification Proposal 0202 National Grid Distribution
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Further Credit Modification Proposals
Entry Overrun Calculation
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
Draft Modification To Enhance Section X of the UNC to improve the Energy Balancing Further Security Process 25th June 2010.
Implementation Approach Distribution Workgroup – June 2014
Modification 0043 – Limitation on offering for sale unsold capacity
Dis 1208: Mod The ability and requirement for Users and Transporters to raise issues to be considered by the Allocation of Unidentified Gas Expert.
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Erika Melén, Senior Settlements Analyst Modification Proposal 141a
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Credit Modification Proposals Update Phil Lucas

State of Play Discussion of draft Proposals at last Workstream Ofgem subsequently clarified the nature of the Value at Risk mechanism as defined in its Conclusions Document (58/05) Such clarification has not warranted significant change to National Grid Distribution’s VAR proposal as outlined at Feb and Mar 2007 Workstreams Only change is in respect of calculation of additional 15 days proxy Mod 0728 – Ofgem rejected on the basis that movement of obligations did not facilitate the relevant objectives of the code (as defined in the GT licence). Ofgem drew analogy with the Interruptible contacts regime recognising that the quality of this information is good due to the incentives (penalties for failure to interrupt etc) and encouraged consideration of incentivisation of the provision of emergency contact info. Credit Mod Proposals – 9 in all (5 Transco, 4 User). Covers unsecured credit, third party provided cover, penalties for non payment and non rectification of credit position following downgrade, invoice amount set off, calculation of value at risk (code credit limit) Primes and Subs – National Grid position communicated externally re: ownership of downstream network. Ofgem acknowledge but ask Transco to evaluate options to enable User to withdraw from Primary Meter with no load. UKD Representation to Transmission Mods – (AR to add speaker note). Provision of Interruption information (DNs > UKT) Extension of sunset clauses (following delay to commencement of enduring regime) Emergency Cash Out SPAA – potential transfer of certain Supply Point related activities from UNC to SPAA, concerns over dual governance, I&C suppliers not signed on to SPAA etc. UNC Development Forum – monthly meetings held (from Aug 2005) to discuss gameplans for UNC change from a UKD perspective.

15 Day Proxy Draft Proposal worked on the assumption that average days duration for a calendar month is 30 days. (365/12 = 30.4 days)/(366/12 = 30.5) Thereby multiplying the outstanding amounts by 1.5 added the 15 days proxy Provided an ‘economic’ implementation option Mod 0728 – Ofgem rejected on the basis that movement of obligations did not facilitate the relevant objectives of the code (as defined in the GT licence). Ofgem drew analogy with the Interruptible contacts regime recognising that the quality of this information is good due to the incentives (penalties for failure to interrupt etc) and encouraged consideration of incentivisation of the provision of emergency contact info. Credit Mod Proposals – 9 in all (5 Transco, 4 User). Covers unsecured credit, third party provided cover, penalties for non payment and non rectification of credit position following downgrade, invoice amount set off, calculation of value at risk (code credit limit) Primes and Subs – National Grid position communicated externally re: ownership of downstream network. Ofgem acknowledge but ask Transco to evaluate options to enable User to withdraw from Primary Meter with no load. UKD Representation to Transmission Mods – (AR to add speaker note). Provision of Interruption information (DNs > UKT) Extension of sunset clauses (following delay to commencement of enduring regime) Emergency Cash Out SPAA – potential transfer of certain Supply Point related activities from UNC to SPAA, concerns over dual governance, I&C suppliers not signed on to SPAA etc. UNC Development Forum – monthly meetings held (from Aug 2005) to discuss gameplans for UNC change from a UKD perspective.

15 Day Proxy Amended legal text refers to the duration of the billing month concerned VAR = a+(15*(a/b)) a is the aggregate value of all charges which at that time have been billed to such counterparty (but not necessarily due) but remain unpaid, and b is the number of calendar days in the relevant income accrual month Mod 0728 – Ofgem rejected on the basis that movement of obligations did not facilitate the relevant objectives of the code (as defined in the GT licence). Ofgem drew analogy with the Interruptible contacts regime recognising that the quality of this information is good due to the incentives (penalties for failure to interrupt etc) and encouraged consideration of incentivisation of the provision of emergency contact info. Credit Mod Proposals – 9 in all (5 Transco, 4 User). Covers unsecured credit, third party provided cover, penalties for non payment and non rectification of credit position following downgrade, invoice amount set off, calculation of value at risk (code credit limit) Primes and Subs – National Grid position communicated externally re: ownership of downstream network. Ofgem acknowledge but ask Transco to evaluate options to enable User to withdraw from Primary Meter with no load. UKD Representation to Transmission Mods – (AR to add speaker note). Provision of Interruption information (DNs > UKT) Extension of sunset clauses (following delay to commencement of enduring regime) Emergency Cash Out SPAA – potential transfer of certain Supply Point related activities from UNC to SPAA, concerns over dual governance, I&C suppliers not signed on to SPAA etc. UNC Development Forum – monthly meetings held (from Aug 2005) to discuss gameplans for UNC change from a UKD perspective.

Implications At certain points in the month invoices may be due from different months Requires calculation of individual daily implicit rates: Mod 0728 – Ofgem rejected on the basis that movement of obligations did not facilitate the relevant objectives of the code (as defined in the GT licence). Ofgem drew analogy with the Interruptible contacts regime recognising that the quality of this information is good due to the incentives (penalties for failure to interrupt etc) and encouraged consideration of incentivisation of the provision of emergency contact info. Credit Mod Proposals – 9 in all (5 Transco, 4 User). Covers unsecured credit, third party provided cover, penalties for non payment and non rectification of credit position following downgrade, invoice amount set off, calculation of value at risk (code credit limit) Primes and Subs – National Grid position communicated externally re: ownership of downstream network. Ofgem acknowledge but ask Transco to evaluate options to enable User to withdraw from Primary Meter with no load. UKD Representation to Transmission Mods – (AR to add speaker note). Provision of Interruption information (DNs > UKT) Extension of sunset clauses (following delay to commencement of enduring regime) Emergency Cash Out SPAA – potential transfer of certain Supply Point related activities from UNC to SPAA, concerns over dual governance, I&C suppliers not signed on to SPAA etc. UNC Development Forum – monthly meetings held (from Aug 2005) to discuss gameplans for UNC change from a UKD perspective. Invoice Month Days in Accrued Month Invoice Type Invoice Value VAR - Principal VAR – 15 day proxy VAR - Total Feb 31 Com £2,000 ((2000/31)*15) £968 £2,968 Mar 28 CSEP ((2000/28)*15) £1,071 £3,071 £6,039

Next Steps Make relevant changes to Legal Text VAR – as described Other cosmetic (non-material) changes Formally raise proposals in time for discussion at the 17 May 2007 Modification Panel Mod 0728 – Ofgem rejected on the basis that movement of obligations did not facilitate the relevant objectives of the code (as defined in the GT licence). Ofgem drew analogy with the Interruptible contacts regime recognising that the quality of this information is good due to the incentives (penalties for failure to interrupt etc) and encouraged consideration of incentivisation of the provision of emergency contact info. Credit Mod Proposals – 9 in all (5 Transco, 4 User). Covers unsecured credit, third party provided cover, penalties for non payment and non rectification of credit position following downgrade, invoice amount set off, calculation of value at risk (code credit limit) Primes and Subs – National Grid position communicated externally re: ownership of downstream network. Ofgem acknowledge but ask Transco to evaluate options to enable User to withdraw from Primary Meter with no load. UKD Representation to Transmission Mods – (AR to add speaker note). Provision of Interruption information (DNs > UKT) Extension of sunset clauses (following delay to commencement of enduring regime) Emergency Cash Out SPAA – potential transfer of certain Supply Point related activities from UNC to SPAA, concerns over dual governance, I&C suppliers not signed on to SPAA etc. UNC Development Forum – monthly meetings held (from Aug 2005) to discuss gameplans for UNC change from a UKD perspective.