Data Coordination Working Group (DCWG) Status Report

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Standards Review Subcommittee Update February – April 2008 May 13, 2008 DRAFT.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
Data Coordination Working Group (DCWG) Status Report Chuck Chakravarthi Chair, DCWG April 2008.
Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee.
LTRA Data Collection and Analysis Process. Data Collection Process  ERO-LTRA2008.xls workbook is sent as an attachment to the Data Request letter  Workbook.
Data Coordination Working Group (DCWG) Meeting September 18 th & 19 th Energy Information Administration (EIA) Washington, DC Room 2E-069.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
DCWG Meeting Action Items. DCWG Action Items 12/03/07 ● Conference Call for DCWG on 12/19 ● Periodic Conference Call to Inform ● NERC Staff to send along.
Data Coordination Working Group (DCWG). 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Approved Full Council Meeting Schedule January PM Needs Assessment presentation: Mental health & substance use issues as barriers to testing- Interactive.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
SAWG Update to WMS March 2 nd, 2016 Brandon Whittle.
Kenneth Silver Los Angeles Department of Water & Power
Risk Assessments: Guidelines for Completing
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
WECC Regional Standards Update
43th IG Meeting South Gas Regional Initiative
Eleanor Ewry Base Case Coordination Subgroup Chair
Implementation Strategy July 2002
Reliability Assessment Guidebook (RAG): Status Report
Maintaining the Clinical & Nonclinical Study Data Reviewer’s Guides
Compliance Performance Measure Proposals and Preliminary Trends
Reliability Assessment Guidebook (RAG): Status Report
IBC Review Pathway Approximate Timeline Online status Online“Sub”State
NASUCA Mid Year Meeting Gas Reliability
Rates & Regulatory Updates
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Cold Snap Task Force Update
CIPC Executive Committee Update-1
43th IG Meeting South Gas Regional Initiative
Joint Working Group 2009 Meeting in Suffolk APR VTC 16 MAY VTC 16 JUNE
Mark S. Orloff, MD Regional Councillor
Integration of Variable Generation Task Force (IVGTF)
Jonathan young ColumbiaGrid
Workshop Session 1: Overview
NERC Critical Infrastructure Protection Committee (CIPC) Executive Committee Public Release 29 September 2005.
ICIS-NPDES Expanded Steering Committee Meeting EPA Opening Remarks
Integration of Variable Generation Task Force (IVGTF): Status
Data Coordination Working Group (DCWG) Status Report
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
Integration of Variable Generation Task Force (IVGTF)
LTRA Data Collection and Analysis Process
Maggie Peacock, Analyst
Randy Spacek AvistaCorp, RWG chair
Performance Measure Recommendations
timeframe in to be determined
Grace Anderson Chair, Budget Work Group May 16, 2018
Maggie Peacock, Analyst
NERC Reliability Standards Development Plan
Data Coordination Working Group (DCWG)
Variable Generation Subcommittee Update to PCC
System Review Work Group Update to TSS
Living Donor Committee
Grace Anderson Chair, Budget Work Group May 16, 2018
WECC 2013 TPL Assessment Coordination, PCC Task Force Review
MAC Input on Section 4.9 Review
TGg Report to the IEEE Working Group
PLAN OF WORK Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
Presentation transcript:

Data Coordination Working Group (DCWG) Status Report Chuck Chakravarthi Chair, DCWG April 2008

DCWG Meeting April 9-10, 2008 (Washington, DC) Met with EIA Discussed DCWG Scope Reviewed Action Items from the Last Meeting Discussed DCWG Work Plan Evaluated Confidence Levels for Capacity Deliberated on Regional Feedback on Summer/LTRA data collection. Discussed NERC’s current & future data analysis approach

Work Status: Joint Meeting with EIA (Task 6 of DCWG Work Plan) Meeting held on April 9, 2008 in Washington D.C. EIA to write letter to NERC outlining (Task 7 of DCWG work plan): Improvements to Current EIA 411 Data Collection Future Areas of Collaboration Update NERC/EIA MOU NERC to send letter to EIA thanking them (Bob Schnapp) for support on Schedule 7 (Transmission Outage Data) & Schedule 3. DCWG to re-design Schedule 2 (Unified Generator Database): Support LTRA True-up to EIA 860 NERC to support Presidential Permitting for Canadian/Mexico Interconnections EIA desires Spring/Fall Meetings

Work Status: DCWG Meeting Meeting held on April 9-10, 2008 in Washington D.C. Consistent Posting of Meeting Materials Formed a task force defining confidence levels for capacity data (Fedora, Simons & Molesky along with a representative from SERC and NERC) SERC to summarize data submittal recommendations based on regional feedback on the Summer/LTRA data collection Request RAS move the LTRA due date to May 1 corresponding to EIA’s new due data of July 15, 2008 NPCC Representative (Fedora) will perform a trial run to demonstrate risk assessment approaches to capacity margin analysis (Supporting Task 4 of the DCWG Work plan)