ETVX Process Notation.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Systems Documentation Techniques
CH02: Modeling the process and life cycle Process of developing software (organization and discipline in the activities) contribute to the quality of the.
1 Test Planning CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 9, 2007.
Software Project Transition Planning
(c) 2007 Mauro Pezzè & Michal Young Ch 24, slide 1 Documenting Analysis and Test.
Chapter 1 Software Engineering. Homework ► Read Section 2.2 (pages 79-98) ► Answer questions: ► 7, 8, 11, 12, & 13 on page 134. ► Answer on paper, hand.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
1 CSc Senior Project Software Testing. 2 Preface “The amount of required study of testing techniques is trivial – a few hours over the course of.
Basic Training on Project Proposal
Project Management Lecture 5+6 MS Saba Sahar.
What is Business Analysis Planning & Monitoring?
1 ‘Title’ Deployment Package for Profile X Version X – Month-Day-20XX.
S/W Project Management
Test Organization and Management
Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Project Management Life Cycle Katy Koenen 05/07/2013.
Process Modeling CS 4320 Fall Process Difficulties SW not a production line Each project is different—even within the same company No universally.
Best Practices By Gabriel Rodriguez
1 Lecture 3: Introducing Data Flow Diagrams (DFDs) Section 1 - The Concept of Diagrams Why use Diagrams? Diagrams as Working Documents Systems Analysis.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Software System Engineering: A tutorial
Training Seminar on Implementation of Effective Quality Assurance Systems in Romanian Higher Education Institutions April 1-3, 2009 Sinaia Criteria for.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Software Testing. What is Testing? The process consisting of all life cycle activities, both static and dynamic, concerned with planning, preparation.
Quality Assurance vs Quality Control
Project Life Cycle.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Pair Development Framework Monvorath (Molly) Phongpaibul.
Developing a Project Proposal
System Test Planning SYSTTPLAN 1 Location of Test Planning Responsibilities for Test Planning Results of Test Planning Structure of a Test Plan Test Definitions.
Monitoring Know the importance of monitoring in humanitarian response Be aware of different elements of monitoring Identify challenges and tips for effective.
Software Measurement Measuring software indicators: metrics and methods Jalote-2002,
Chapter 1 Software Engineering Principles. Problem analysis Requirements elicitation Software specification High- and low-level design Implementation.
21/1/ Analysis - Model of real-world situation - What ? System Design - Overall architecture (sub-systems) Object Design - Refinement of Design.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Software Development Life Cycle. The Software Life Cycle  Encompasses all activities from initial analysis until end of work  Formal process for software.
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 UML Activity Diagrams.
Software Engineering — Software Life Cycle Processes — Maintenance
Process and customizations
SQA project process standards IEEE software engineering standards
MANUPLATION OF FLOWCHARTS
Writing a Project Plan.
SQA project process standards IEEE software engineering standards
Software Specification Tools
Function Rules EQ: How do you write algebraic expressions? I will write algebraic expressions.
Project Management Processes
Software Project Management
TechStambha PMP Certification Training
9/18/2018 Department of Software Engineering and IT Engineering
Entry-Task-Validation-Exit (ETVX)
Request for Proposal (RFP)
PROJECT TITLE YOUR LOGO YOUR COMPANY NAME EXECUTIVE SUMMARY
Project Management Processes
Structured Solutions Inc. IMS Definition
Function Notation “f of x” Input = x Output = f(x) = y.
Project Management Processes
Adaptive Product Development Process Framework
It’s that time… Journal Entry #13 Title: Progress Check
PROJECT TITLE YOUR LOGO YOUR COMPANY NAME EXECUTIVE SUMMARY
2019 Boeing Innovation Challenge
PROJECT TITLE YOUR LOGO YOUR COMPANY NAME EXECUTIVE SUMMARY
Presentation transcript:

ETVX Process Notation

ETVX Process Notation - Concept Task Entry eXit Validate ETVX = Entry – Task – Validation - eXit Adapted from: Radice, R., IBM Systems Journal, 1975. 2019-04-09

ETVX Notation * * Note: Mandatory elements are underlined Step Title An active verb is used to define the step title e.g. Prepare project plan Step Description Describe the overall purpose of this step One to three sentences Performers List who will execute the activity. Inputs List what artefacts will be used during the performance of the tasks. It is not necessary for all the inputs to exist in order to begin the activity. Entrance Criteria List prerequisites that the input artefacts must satisfy in order to begin the tasks. * Note: Mandatory elements are underlined 2019-04-09

ETVX Notation * Note: Mandatory elements are underlined Task Description Describes the tasks to be performed Active verb-noun are used to describe activities e.g. Test the Code, Distribute the Document Exit Criteria States what conditions the output artefacts must meet before the task is considered complete. Outputs List artefacts generated as a direct result of performing the task. * Note: Mandatory elements are underlined 2019-04-09

ETVX Notation * Note: Mandatory elements are underlined Measures Risks List the measures to be collected during the execution of the tasks. The measures are used to monitor activity progress, to aid in estimating the effort required to complete the activity, and to improve the process. Total staff-hours is a mandatory measure of each step. Risks List the risks elements of this activity. References List the documents that can be used to support the tasks. * Note: Mandatory elements are underlined 2019-04-09

ETVX Process Notation Process Name - Step Number and Step Title 1 3 2 Tasks Inputs Outputs 1 3 Active verb + object 2 Entry Criteria Exit Criteria 5 6 4 Measures 2019-04-09