UNC0376S – Increased Choice when applying for NTS Exit Capacity

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Advertisements

Gemini Re-platforming Project Update April This presentation is to provide an overview of the Gemini Re-platforming Project (GRP) and provide early.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
GEMINI Re-platforming Project September 2012 GRP External User Changes and Key Messages ahead of seeking approval.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
ROM and DCA. Scene setting Our house Our aspiration for our house Our project manager Us.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Cutover & Implementation Aggregated Programme RAG
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Distribution Workgroup 24/11/16
EU Implementation Programme
Exit Capacity User Commitment – Transmission Workstream update
Gemini Re-platforming Project; External User Participation July 2012
UKL Future Release 2 Cutover/Implementation
13-block rotation schedule
Transmission Workgroup – 1st December 2011
Amendment Invoice Task Force Progress Report
Exit Overruns in the Enduring Regime - draft MOD principles
Draft – Initial change view to 2020
UNC Modification – Non Effective Days
NTS Entry Charging Review Update
Assignment Workshop 2 16th September 09, Solihull.
Cutover & Implementation Aggregated Programme RAG
Amendment Invoice Task Force Progress Report
Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.
2019 Release Planning Options inc Modification 0621 / GB Charging Project DSC Change Management Committee update July 2018.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
7th July 2011 Transmission Workgroup - Elexon
DSC Change Committee Summary – 11th July
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Modification 0333A – implementation info
Enduring NTS Exit Capacity Arrangements - Update
UNC Modification 0531 Provision of Industry Testing System
COR1072 Enduring Transfer and Trade Arrangements
Overall Project RAG Status:
Amendment Invoice Task Force Progress Report
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
Release 3 Scope Selection and Plans
OCC & Standard Commodity Changes
Performance Assurance – Consideration of Discussions to date
Review Group 0334 User Pays update – Modifications 288, 289, 290.
Tropical cyclones movement
Systems Impact from Gas Day Change
February 2007 Note: Source:.
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Transmission Workgroup July 2012
Assignment of NTS Entry Capacity – Previous Work Undertaken
Transmission Workstream 4th December 2008
Transmission Workstream 05 November 2009
KVI Analysis for period 1st May 2018 to 31st March 2019
Customer Issue Management CoMC Update for April & May 2019
Gas Customer Forum 28 July 2008
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
KVI Analysis for period 1st May 2018 to 31st March 2019
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 6 December 2012

Update Analysis and testing phase initiated early August (post exit reform implementation in July) Analysis and testing completed in October, it identified: the requirement for a number of codes fixes (for both exit functionality and reporting structure) that the increase in volume of data would result in performance issues in report screens. that a pre July 2013 implementation would result in a clash with Gemini replatforming (GRP)

Gemini Replatforming (GRP) To implement the changes required for UNC0376S for the July 2013 Enduring Annual Application Window will require that work be undertaken both in parallel and as part of GRP: the system changes are implemented onto the legacy Gemini Exit system where it will be fully tested, prior to: migrating to “to be” Gemini in the June 2013 deployment of GRP However including within GRP will: increase the level of complexity involved result in additional system development work potentially lead to higher costs

COR2257 Costs Original ROM Costs: Lower Range – £128k Upper Range - £190k Estimated Costs when included within GRP: Lower Range - £166,970k Upper Range - £227,970k

Next Steps To include within GRP work needs to begin in December 2012, currently: Dec ’12 - Xoserve scheduled to begin build and implementation Feb/Mar ‘13 – Porting of Code to GRP / testing of code within “to be “ Gemini June ’13 GRP implementation

Other Considerations Other option available to NG would be to build on “to be” Gemini and deploy in September 2013 as part of a Summer Release; however this has initially been discounted as: it would not meet industry expectation and be available for the July Annual Application Window we are tight on time – to begin on 10 Dec Xoserve needed to commission work with their Suppliers almost immediately A September ’13 release has not been discounted, if Industry requirement is for a September release current work can be discontinued, however some costs will have been incurred in meeting the December start date.