WECC Joint Synchronized Information Subcommittee

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

WECC JSIS Update Dmitry Kosterev, BPA.
BPAs Generator Model Validation Technique/Tool MVWG Denver, CO May 18-19, 2009 Steve Yang Bonneville Power Administration.
Model Validation in Western Interconnection
JSIS Report to WECC PCC and OC
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
BAL-002-WECC-1 Contingency Reserves
ACE Diversity Interchange (ADI)
WECC-098 Gov Droop DT May 29, BAL Requirements R1. Each Frequency Response Sharing Group (FRSG) or Balancing Authority that is not a member.
Using Synchrophasors for Preventing Cascading Outages
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
January TSS J. Gronquist, S. Kincic
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
WECC Joint Synchronized Information Subcommittee
NERC BAL Frequency Response Reliability Standard
Frequency Response WECC Frequency Response Obligations Robert W. Cummings NERC Director of Reliability Initiatives and System Analysis WECC Operating Committee.
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
Review of BPA Voltage Control Conference
Peak RCCo Performance Metrics Draft –November 2013.
MVWG Report to TSS August 2014 Stephanie Lu, MVWG Chair Seattle City Light.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Joint Synchronized Information Subcommittee Report Planning Coordination Committee Meeting March 22,
Slaven Kincic MVWG March System Model Validation Task Force (SMVTF) System Events for System Model Validation o 21th January event:  Colstrip.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
| Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
2017 WECC JSIS Report March 21, 2017.
Visibility Ramu Ramanathan 10/1/2007.
Western Electricity Coordinating Council
The Model Validation Story
Kenneth Silver Los Angeles Department of Water & Power
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Progress Report for the May 26th 17:31 Event
Proposal to Remove from Service the PV-COI RAS
WECC Regional Standards Update
Slaven Kincic SMVTF Progress Report
Eleanor Ewry Base Case Coordination Subgroup Chair
Next Steps in Load Modeling
Grid Integration of Intermittent Resources
Doug Reese, USFEATF Chair
Kenneth Silver Los Angeles Department of Water & Power
Project WECC-0100 Update Load Modeling Task Force
Peak online TSAT Implementation Update
Western Electricity Coordinating Council
Western Electricity Coordinating Council
Reliability & Market Impacts Resulting from RC Expansion
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
Update on Removing Forced Oscillation Bias from the Mode Meter
Enhanced Curtailment Calculator (ECC)
James Wells – PWG Chair May 25, 2018
James Wells – PWG Chair May 25, 2018
Doug Reese, USFEATF Chair
Western Electricity Coordinating Council
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
Unscheduled Flow Administrative Subcommittee ISAS Report
Hongming Zhang EMS Applications Manager, PEAK RC
Update on Removing Forced Oscillation Bias from the Mode Meter
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Proposal to Remove from Service the PV-COI RAS
Reliability & Market Impacts Resulting from RC Expansion
WECC – NERC Standards Update
Palo Verde-COI RAS Retirement
System Review Work Group Update to TSS
Presentation transcript:

WECC Joint Synchronized Information Subcommittee Report to WECC PCC and OC October 2014 Presented by Dmitry Kosterev

Western Interconnection Synchrophasor Program (WISP) Phase 1 WISP - $108M investment completed WECC JSIS supports reporting to DOE Phase 2 WISP: DOE awarded a new $6.2M grant to Peak RC, total of $12.4M with cost-share from BPA, CISO, SCE, SDG&E,IPC DOE $2.9M are awarded to PG&E with the recipient cost-share of additional $3.9M

WECC JSIS Structure Data Delivery and Management Engineering Analysis Applications Control Room Applications

Data Delivery and Management Dates: 8/25/2014 -8/31/2014 Entity Percent Availability PMU Count AESO 94.09% 17 APS 94.99% BCHA 81.76% 11 BPA 99.86% 55 IPCO 83.13% 20 LDWP 99.58% 15 NVE 69.14% 6 NWE 62.91% 3 PAC 73.19% 4 PGAE 0.00% 2 PNM 75.86% SCE 38.07% 7 SDGE SRP 99.89% 1 TEPC 100.00% TSGT 98.45% WAPA 99.81% 5 Overall: 90.13% 177

Data Delivery and Management WISP 2.0 will focus on improving data quality Applications are developed for analysis of data availability and latency Applications are being developed for analysis of data validity and data calibration

Engineering Analysis Oscillation Analysis Power Plant Model Validation Frequency Response Analysis System Model Validation

Oscillation Analysis A paper is completed on modes of inter-area oscillations in the West PDCI probing tests and brake tests: 2013 report is completed 2014 tests are done, report is under development Analysis applications “Prony Robot” is developed to calculate and tabulate oscillation frequency, damping and shape for 1,000’s of simulation runs Applications for ambient data analysis are available, training required

Oscillation Detection Oscillation Detection Application scans power and voltage at interties, power plants, PDCI, SVCs for growing or sustained high energy oscillations Events captured in 2014: Wind power plant control system oscillation at 14 Hz Generator PT failure resulting in oscillation (about 1 Hz) Hydro plant operating in rough zone for extended period of time (about 0.33 Hz)

Oscillation Detection BEFORE AFTER

Power Plant Model Validation PPMV plays in disturbance data into GE PSLF A state-of-the art data management systems are developed Technology transfer is in progress (BPA, IPC, PG&E, SRP) Cost effective approach for compliance with MOD-026 and MOD-027 Reliability Standards

Frequency Response Analysis Tool Frequency Response Analysis Tool (FRAT) works at Interconnection (done) Balancing Authority (done) Power Plant / Generator (under development) Methodology is consistent with NERC BAL-003-1 Adding capabilities to generate compliance reports An interconnection frequency response baseline is developed from 2008 to today

Database of Events Add / View / Edit Events Performance Baseline

NERC-BAL-003-1 Reliability Standard FERC Approved BAL-003-1 Frequency Response and Frequency Bias Setting, effective April 1, 2015 BAL-003-1 requires no UFLS for “design” event: “Design Event” is 2 Palo Verde WECC Coordinated UFLS starts at 59.5 Hz Western Interconnection iFRO is about 950 MW per 0.1 Hz Recalculated annually Frequency Response Measure (FRM), measured at Point B

NERC-BAL-003-1 Reliability Standard FA FB FC FA = pre-disturbance frequency (average from -16 to 0 sec) FB = settling frequency (average from 20 to 52 sec) FC = minimum (nadir) frequency

Western Interconnection Performance

NERC-BAL-003-1 Reliability Standard iFRO is prorated among Balancing Authorities based on annual generation and served load energy Annual median BA FRM needs to exceed BA FRO

BA Frequency Response Calculation FA FB FC Pint_B Pint_A FRM = (Pint_B – Pint_A + BA Gen Loss) / ( FA – FB)

Balancing Authority Performance Interchange response is measured for compliance with NERC BAL-003-1 Generation response is calculated to determine how much frequency response to acquire

NERC-BAL-003-1 Reliability Standard BAL-003-1 applies to Balancing Authorities BAs need to acquire frequency response FERC held a conference on frequency response acquisition in April 2014 Formation of Reserve Sharing Groups is allowed Trading of FRO is not supported by NERC Staff Transmission reservations and impact on SOLs ?

May 16, 2014 RAS Event

May 16, 2014 AC RAS Event Frequency NW RAS = 2,563 MW 59.7 59.75 59.8 59.85 59.9 59.95 60 60.05 23:18:00 23:18:15 23:18:30 23:18:45 23:19:00 23:19:15 23:19:30 23:19:45 23:20:00 23:20:15 23:20:30 23:20:45 Frequency NW RAS = 2,563 MW Kemano = 110 MW Springerville = 445 MW John Day – Grizzly #1 back in service

May 16, 2014 Sequence of Events Prior to event: 23:18:15: John Day-Grizzly #2 and Grizzly-Malin #2 500-kV lines were out of service 23:18:15: John Day-Grillzy #1 500-kV lines tripped to lock-out AC RAS gen.drop is initiated of about 2,500 MW at Grand Coulee, Wells, John Day, Biglow Canyon Wind and Dooley Wind Chief Joseph braking resistor is operated Few seconds later: Kemano RAS in BC operated on power swing and tripped unit # 1 with 110 MW 40 seconds later: Springerville unit#4 in Arizona tripped with ~425 MW due to boiler instability 23:20:30: John Day-Grizzly #1 500-kV line is restored back to service

Model Validation Studies Validation Base Case Development WECC Planning base case is modified to match system conditions Generation MWs and statuses are taken from Peak RC WSM Area loads are adjusted to match major paths flows Wind generation May 16 event had significant amount of wind generation EMS wind generation models are inadequate for most of WECC system Many wind generators in California have no dynamic models Sequence of events is simulated in GE PSLF WISP data from BPA, SCE, LADWP and SRP is used

Model Validation Studies Remarkable agreement of frequency response

Chief Joseph Brake Chief Joseph brake operated as designed In May 16 event, Chief Joseph brake had little impact on COI stability However, the brake operation aggravated the Kemano power swing There were no dynamic models for Chief Joseph brake – BPA developed one since, will be seeking approval at next MVWG BPA Planning to initiate review of security of Chief Joseph brake control algorithm

Kemano RAS There is no dynamic model for Kemano RAS Kemano owners to provide dynamic RAS models There is no visibility of Kemano dynamic performance Kemano owners to install and network PMUs at Kemano and Kittimat Kemano owners to review the security of RAS algorithm

Springerville Springerville unit #4 tripped due to boiler instability, although the frequency was well within PRC-024 Reliability Standards Springerville would have tripped for 2 Palo Verde outage 2PV+Springerille would aggravate the COI voltages and power pick-up Springerville owners are looking into solutions

May 26, 2014 RAS Event

May 26, 2014 RAS Event PDCI Converter 1 failure triggered PDCI RAS gen.drop of 2,806 MW Frequency drop to 59.66 Hz, well above UFLS levels of 59.5 Hz

Baselining Frequency Deviations PDCI RAS Events