KICK OFF meeting - project presentation

Slides:



Advertisements
Similar presentations
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Advertisements

Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
LKr readout: present and future R. Fantechi 30/8/2012.
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
OUTLINE TODAY (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
WP18: High-Speed Data Recording Krzysztof Wrona, European XFEL 07 October 2011 CRISP.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
FP7-People-IAPP-2012 FTK - Project number: Paola Giannetti – INFN & University of Pisa 1 st EU Mid-Term Review meeting Brussels, November 7 th,
OUTLINE (1) Mid term review (2) Milestones Deliverables: who does what (3.a) Outreach – Dissemination (3.b) Web site (4) Papers plan (5) Trainings (scientific.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
Management: (1) Next GA, EB and trainings (2) Summary 2013 – Planning 2014 (3) AUTH recruitment.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
IAPP-FTK Status Report b e b b   e   hb b  1.5 MEuros 4 Years 6 Institutions.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
Piero Belforte, HDT, MERITA project 2000: objectives, activities and results by Carla GIACHINO .
Piero Belforte, HDT. Year 2000, RISIP Project : objectives, activities and results by Razvan Ene.
Slow Control and Run Initialization Byte-wise Environment
Slow Control and Run Initialization Byte-wise Environment
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
FTK: update on progress, problems, need
LKr status R. Fantechi.
FTK infrastructure in USA15 Status and plans for 2015 A
Project definition and organization milestones & work-plan
Possible contribution of Pisa on pixel electronics R&D
Summary of Deliverables & reached Milestones
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
LHC experiments Requirements and Concepts ALICE
DAQ for ATLAS SCT macro-assembly
Secondments & tasks Management meetings – Calendar
10/month is the present production rate 2 FTE + sporadic contributions
EU Institution Board 1 representative of each participating institute
To do list production organization and commitments
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Perugia SuperB Workshop June 16-19, 2009
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

KICK OFF meeting - project presentation Mauro Dell’Orso University of Pisa b e m t h FTK

Participants UNIPI CAEN AUTH CERN PRIELE CNRS

List of Work Packages & WP leaders Prototype Construction & Production Validation (PRIELE, M1-M42) Infrastructure & Integration (CAEN, M1-M48) Commissioning (CERN, M12-M48) Architecture Simulation (UniPisa, M1-M48) Image Processing (UniPisa, M25-M48) Silicon Detectors (CNRS,M1-M48) Outreach (AUTH, M1-M48) Workshops & Trainings (AUTH, M1-M48)

Participation to Work Packages

WP1: Prototype Construction & Production Validation (Priele) Objectives Construction and standalone validation of an FTK processor based on Serial Link technology for Level 1 and Level 2 trigger applications Transfer of Knowledge to PRIELE for board assembly and validation and among all research institutions about Associative Memory technology on of SLP2 at PRIELE before integration at CAEN 128 AMchip04s Task 3: prototype test Task 1: design Task 2: prototype design & assembly

WP2: Infrastrucure & Integration (CAEN) Objectives Infrastructure construction and validation (racks, crates, power supplies, cooling) Validation/integration of prototypes from Europe, Japan and USA Software development for system test/control/monitoring Transfer of Knowledge among CAEN and research institutions Description of work T.2.3. Software development for tests of the VS T.2.4. Tests and validation of the baseline FTK system for the demonstrator After: T.2.2. Prototyping of a CAEN power supply for the final crate (5kW) T.2.5. Tests and validation of the SLP2-based system T.2.6. Tests and validation of the SLP1-based system T.2.7. Tests of cooling and mechanics of a rack with complete final crates Final Fit-HW SSB: DF ITALY USA USA

WP3:Commissioning (CERN) Objectives Infrastructure installation and validation at point 1 (racks/crates/power supplies) Board installation/validation and running control/functional monitoring Transfer of Knowledge among CAEN and research institutions for board Commissioning/maintenance Description of work T.3.1. Installation of Infrastructures, validation tests & ToK T.3.2. Installation of boards (SLP2 or FTK baseline) for the demonstrator T.3.3. Tests and validation of the FTK demonstrator T.3.4. T.3.5 as T.3.2, T.3.3. for the first production T.3.6. T.3.7. as T.3.2, T.3.3. for the second production

WP4: Simulation (University of Pisa) Objectives Production of test vectors to validate hardware configurations Definition of Level 1/Level 2 architectures to optimize physics reach

WP5: Image Processing (University of Pisa) Objectives Test Associative Memory capability to extract relevant features from natural/medical images Evaluate impact on medical imaging/diagnosis and robotic automation

WP6:Silicon Detectors (CNRS) Objectives Optimizationof CAEN power supply for LHC pixel detectors (phase-II) Description of work T.6.1. Setup of a test bench for PS performance evaluation at CAEN T.6.2 Measurements on PSes equipped with undamaged readout chips (FEI4 devices) T.6.3. Optimization of PSes with irradiated devices T.6.4. Tests with optimized Pses