1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions.

Slides:



Advertisements
Similar presentations
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Advertisements

Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
R ecording flows in the Physical Supply-Use Tables: Cola City, Cow Town and Capital Harbor Technical Workshop on the Preparation of Water Accounts in Latin.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Woods for Water South East Workshop 22 nd October 2013 Forestry Commission grants & support Matthew Woodcock Partnerships & Expertise Manager South East.
Climate vulnerability & adaptation in the Dutch delta
6-4 Percent of a Number Do Now Multiply   15
Summary of MPWMD Local Desalination Project Proposal
On your paper, graph the following: D (m) T (sec)
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Aswan High Dam Was it worth it?
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire?
Can you explain the ideas
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
1 Copyright Copyright 2012.
The versatile solution for efficient dredging and water construction.
World energy economy at a glance Uri Barenholz Weizmann institute of science December, 2011.
Site Selection March 2010.
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
China Might not be in Short of Water Prof. Wu Jisong Chairman of Beijing Association of Recycle Economy development Senior Advisor of Beijing Olympic Game.
Water Distribution Systems – Part 1
October Presentation Team Jerry Grant Managing Director Chartered Engineer RPS Consulting Engineers Kevin Murray Chartered Engineer Independent.
South Asian Conference on Sanitation (SACOSAN IV) By: Ms. Shaheeda Adam Ibrahim Director General Water and Sanitation Department Ministry of Housing and.
Meniv Rishon Ltd. The municipal water, drainage & waste water company.
1 SOURCE AND DISTRIBUTION OF WATER On completion of this segment you should be able to appreciate Water, an essential component Sources and application.
The Hashemite Kingdom of Jordan Ministry of Water and Irrigation Jordan Valley Authority RSDS- Phase I Desalination of (80-100) MCM/yr at Aqaba.
Platte County EDC Hunt Midwest B.T. Residential, LLC (MD Management, Inc.) Amber Meadows, Inc. (Tim Harris/Jim Haug) John Dillingham Carolyn Clark Skyview.
Chapter 3 Supply and Demand. Chapter Objectives Define and explain demand in a product or service market Define and explain supply Determine the equilibrium.
Community Development Block Grant (CDBG) Program
An Application of Linear Programming Lesson 12 The Transportation Model.
Methow Valley Irrigation District Alternatives Evaluation Presented by Bob Montgomery, P.E. and David Rice, P.E. January 31, 2013.
Princeton Wastewater Servicing Study
LADWP WATER SYSTEM CAPITAL PROGRAM UPDATE July 25 th 2013.
Chapter 4 Systems of Linear Equations; Matrices
What A Homeowner Needs to Know
Capacity and Constraint Management
© OECD/IEA 2012 Security of Supply: Developing Oil and Gas Resources in the European Arctic Bo Diczfalusy Director of Sustainable Energy Policy and Technology.
PhW / Palyja / June 07 Delivering Water to West Jakarta PALYJA Presentation to CCF By Philippe Wind, Technical Director PALYJA JUNE 2007.
Dam Control of Flow Rates on the Scioto and Olentangy Rivers 1.
$ TOTAL INCOME 100 Quick Start 4 Within 30 Days of Start Date.
MANAGING PRESSURES IN AN ACUTE SETTING Grant Archibald Director Emergency Care & Medical Services 10 TH JUNE 2011.
10-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Tactical Decision Making 12 PowerPresentation® prepared by David J. McConomy, Queen’s.
Supply Chain / Hoko Student will understand the roles supply chains in a business: Define a supply chain Understand the components and the effects of a.
The future of deltas in the perspective of environmental change Harmonizing human interests and environmental interest is one of the largest challenges.
Equal or Not. Equal or Not
Slippery Slope
Ch. 53 Exponential and Logistic Growth
Stability and Failure Mechanisms of Dams A dam safety research project Kjetil Arne Vaskinn.
Look at these sequences. What is happening? 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 10, 20, 30, 40, 50, 60, 70, 80, 90, , 200, 300, 400, 500, 600, 700, 800,
Presenter: Frederick Yaw Logah (RS) CSIR-Water Research Institute, Accra-Ghana 15th July, 2014.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Chang Jiang Three Gorges Dam. Dam under construction Three Gorges Dam Construction Site, will be the biggest dam in China and in the world.
Jurandir ZULLO Junior Effective use of agrometeorological systems and information Expert Meeting on Weather, Climate and Farmers.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
ADVANTAGES Water savings Crop response Labour savings Fertilizer savings Less weed growth Drip Irrigation System Layout & Design.
Planes, Boats & Planograms Howard Bergman. The Power of the Customer There is only one boss. The customer. And he can fire everybody in the company from.
CE HYDRAULICS ENGINEERING
The Nile, Egypt River Regulation.
Water System Planning Study
Guidelines for Integrated Water Resources Management (IWRM) at The River Basin Level (IRBM) Dr. Huseyin Gundogdu, Dr. Murat Hatipoglu, Taner Kimence (Agr.
Sediment Issues within Transboundary Basins Presented by Paul Bireta and Fernando Salas April 12, 2012.
Role of aquatic and impact of regional irrigation to local livelihood in Mekong Delta (Camau peninsula)
Describe the features and characteristics of the Three Gorges Dam.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Always fresh raw water for PDAM Pontianak
Where? The Colorado River
Lake 16 Dam Repair Presentation
Presentation transcript:

1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions - Criteria Imput from: Cipta Karya (Province): Pak Angiat BWSK: Pak Sapri Pak Masryatno (former technical director) PDAM Kota Pontianak

2 Salinisation of the Kapuas Delta Introduction: characteristics of the treatment facility in Pontianak Drinking water demand: 1,068 m3/s1,769 m3/s - Production capacity1,21 m3/s1,51 m3/s - Production capacity in the dry season: 300 l/s1300 l/s - Costumers coverage: 60%90% - Population growth: 2,74 %/year2,74 %/year

3 Salinisation of the Kapuas Delta (Technical) Problems during the dry season -During the extreme events of 1997 and 2002 (resp. 110 and 80 days) the pipe to Penepat (24 km upstream) was only 20-30% of the time operational due to: -Lack of fuel -Mechanical failure of the pumps -Leakage of the transport pipe -Beside these problems there is a capacity deficit of approx. 900 l/s

4 Salinisation of the Kapuas Delta New transport pipe to Penepat - New transport pipe to Penepat (under construction) Capacity: - Current Pipe (d=600 mm) = 300 l/s (v = 1 m/s) - New Pipe (d=800) = 500 l/s (v = 1 m/s) - In Holland the transport velocity of 1 m/s is normal)

5 Salinisation of the Kapuas Delta A sustainable solution for the future?

6 Salinisation of the Kapuas Delta Short term / Long term

7 Salinisation of the Kapuas Delta Scope of solutions Short term -Intake further upstream -Optimise capacity WTPs and decrease leakage -Update Penepat intake, including reservoir or extend pipeline to Biyung Long term -Blocking salt water from the sea -Create fresh water reservoir for the dry period -Flushing KK by constructing canal Sukalanting

8 Salinisation of the Kapuas Delta Stop sea water from entering the river system Construct a dam, must be able to Regulate river discharge Pass the ships It depends on the functional requirements Location: River mouth (Jungkat) or Ambawang (idea of Prof. Arwin)

9 Salinisation of the Kapuas Delta A fresh water reservoir 1.26 m3/s = 150,000 m3/day (in combination with Penepat) Dry season = 110 days Reservoir: 12,000,000 m3 When you fill it up to two meters you need an area of approx. 600 ha.

10 Salinisation of the Kapuas Delta Flushing the Kapuas Kecil in the dry season - Construct a bypass in the river near Sukalanting (not as simple as it looks like)

11 Salinisation of the Kapuas Delta Criteria Feasibility