SWTTail Season Conjunctions 1 UCB, Dec 15 2007 THEMIS SCIENCE WORKING TEAM MEETING Tail 1 Conjunctions Sabine Frey University of California - Berkeley.

Slides:



Advertisements
Similar presentations
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Advertisements

1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Our Turn To Change The Future! Buckeye Locals 2009 Building Project Spring 2009.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: Author:
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Project Plan for VMC. VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
The 24-hour clock 1 12-hour clock 24-hour clock
C1 Sequences and series. Write down the first 4 terms of the sequence u n+1 =u n +6, u 1 =6 6, 12, 18, 24.
Grade D Number – Multiplying Decimals 1. O.8 x x x x x x x x x
WARC 14/15 - S.S.O.R.T. / ByeBye / / KI. UM DIE WELT SEGELN ByeBye-Party Gstaad WARC 14/15 - S.S.O.R.T. / ByeBye / / KI.
Version 0.3, 28 January 2004 Slide: 1 APPLICATIONS OF METEOSAT SECOND GENERATION (MSG) DETECTION OF CONTRAILS Author:Jochen Kerkmann (EUMETSAT)
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Richmond House, Liverpool (1) 26 th January 2004.
What Time Is It? Lesson by Mrs. Moody, FLE. M1M2 Students will develop an understanding of the measurement of time. a Tell time to the nearest hour and.
Measuring Time. Learning Goals To measure time, we start counting units of time when the activity begins and stop counting when the activity ends. The.
Break Time Remaining 10:00.
This module: Telling the time
13.1 Theoretical Probability
Pearls of Functional Algorithm Design Chapter 1 1 Roger L. Costello June 2011.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Constant, Linear and Non-Linear Constant, Linear and Non-Linear
Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add to your own presentation. SEPTEMBER 2013.
We are learning how to read the 24 hour clock
Success at GCSE Achievement for All Evening. Success at GCSE Focus for the evening Communication of key dates Support that the school will provide Process.
Base view of Joystick Cam cutting grid Customer details Base contacts Additional options Pot Overview of the VCS0 cam cutting sheet.
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Splines IV – B-spline Curves
Class F3P Indoor Aerobatic Power Model aIRCRafts
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Career Salary Your pension value at 6 April 2011 Further Information Understand how Career Salary benefits grow This presentation has been prepared to.
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
FY 2008 Enacted Budget Mary Jane Miller Director, Office of Budget Management National Budget Meeting Hilton Washington, DC March 13-14, 2008.
GCSE Sawston VC Gary Whitton – Head of Science.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Clock will move after 1 minute
Fourth Quarter Oklahoma Data (October-December 2011)
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Other MAGDAS I Stations 2006 HER ABJ ILR AAB FYMLAQ TIR LKW DVS SMA EUS ANC GLY WAD MGD CST 2006 Jan. Feb. Mar. Apr. May Jun. Jul Aug. 5V1v1 9.
1st Joint Cluster-THEMIS Workshop THEMIS Orbit Updates - 1 UNH, Sep 23-26, 2008 THEMIS Orbit Updates Prior to Second Tail Season 2008/2009 S.Frey, V.Angelopoulos,
S. Frey et.al., THEMIS Ground-Based Observatory Analysis 1 San Francisco, Fall AGU, December 16, 2004 Analysis Used predicted THEMIS spacecraft positions.
THEMIS MISSION PDRMISSION DESIGN- 1 UCB, November 12-14, 2003 Mission Design Dr. Sabine Frey University of California - Berkeley.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
THEMIS Mission Ops Peer Review Mission Design − 1 November THEMIS Mission Design.
THEMIS FDMO Review Mission Design Update − 1 October 5, 2004 Mission Design Update Sabine Frey.
Analysis of Substorms during the Second THEMIS Tail Season
Presentation transcript:

SWTTail Season Conjunctions 1 UCB, Dec THEMIS SCIENCE WORKING TEAM MEETING Tail 1 Conjunctions Sabine Frey University of California - Berkeley

SWTTail Season Conjunctions 2 UCB, Dec Overview Tail Season Schedule Conjunction Criteria Orbit Evolution Conjunctions Tail1 2008/ In Space - Geographic Overview

SWTTail Season Conjunctions 3 UCB, Dec Tail Season Schedule } alignments P1,P } 1 st tweaks P1,P2 9 × 12h Dawn conjunctions } 2 nd tweaks P1,P2 12 × 12h Midnight conj } 3 rd tweaks P1,P2 9 × 12h Dusk conjunctions Center Epoch, WD of season WD-60d WD-24d WD+24d WD-88d WD+60d First Tail Season Winter 2007/2008

SWTTail Season Conjunctions 4 UCB, Dec Tail Season Schedule 2 Midnight Dusk Dawn Tail season Dawn Flanks Dusk Flanks Day side Conjunction Intervals: 00:30-12:30 UTC Dawn: 2007-Dec Jan-09 9 Orbits Midnight: 2008-Jan Feb Orbits Dusk: 2008-Feb Apr-02 9 Orbits WD-60d WD WD+60d THEMIS Orbits First Year

SWTTail Season Conjunctions 5 UCB, Dec Conjunction Criteria Tail Season 1-Midnight P1 P2 P3 P5 P Ecliptic X-GSE [Re] Neutral Sheet (NS) Equatorial plane P1 Orbit Plane Magnetic Axis, 22 Diurnal Range Z-GSE [Re] Distance to Neutral Sheet +5 Re +2 Re -2 Re -5Re Z-GSM X-GSM Center Epoch of Tail Season (WD) Observation geometry Inter probe separation dY GSM Pn < ±2 RE Probe to neutral sheet dZ3,4/NS < ± 2 RE dZ1,2/NS < ± 5 RE GBO midnight/noon ± 6 h C1 C2 C3

SWTTail Season Conjunctions 6 UCB, Dec Orbit Evolution Inclination Apogee

SWTTail Season Conjunctions 7 UCB, Dec Conjunctions Tail1 2007/ WD+24d WD+60d WD WD+24d WD WD-24d WD-24d WD-60d Mar 08 Feb. 08 Dec 07 Dusk Midnight Dawn WD+60d WD WD-60d Time C1,3 Y GSM X GSM C2,3 dZ X GSM

SWTTail Season Conjunctions 8 UCB, Dec Conjunctions Tail1 2007/ P5 P3 P4 Geographic Longitude of Apogee Passes of Inner Probes

SWTTail Season Conjunctions 9 UCB, Dec Back-up Slides

SWTTail Season Conjunctions 10 UCB, Dec Neutral Sheet Model Neutral Sheet (NS) model Hammond, 1994 Hinge point at inner probe orbits Distance to NS |dz| < 2 Re for inner probes |dz| < 5 Re for outer probes Compared with Tsyganenko Model T96 d Hinge Point Zone Neutral Sheet Model Verification March December