A-1 RF gun Takuya Natsui.

Slides:



Advertisements
Similar presentations
KEK : Novel Accelerator TYL Workshop M. Yoshida, M. Nozaki, K. Koyama, High energy research organization (KEK) -Collaboration -IZEST (CEA) :
Advertisements

RF-Gun cavity for high charge electron generation Takuya Natsui.
The dawn of a new era Beams! Beams! Beams!. The first results are in 16 bunch train – Qtot = 560 nC – Bbunch = 35 nC 32 bunch train – Qtot = 600 nC –
Possible new EMMA injectors bdm. Motivation ALICE due to shut down soon Alternate EMMA injection (assuming EMMA project continues which it should …) Several.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
RF Synchronization, control and stability Takuya Natsui.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
Modelling of the ALICE Injector Julian McKenzie ASTeC STFC Daresbury Laboratory IOP Particle Accelerators and Beams Group Status and Challenges of Simulation.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Summary of issues. RF-Gun cavity – Disk and washer (DAW) : very fast RF ageing, 2 MeV is not enough. – Quasi travelling wave side couple structure : Lower.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Low Emittance RF Gun Developments for PAL-XFEL
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
Interpretation of beam current experimental results in HoBiCaT Gun0 Vladimir Volkov.
Laser stability Takuya Natsui. Oscillator phase lock stability.
Status of the Photocathode R&D for ATF RFgun N.Terunuma (KEK)
Laser System Upgrade Overview
–10.06 Milan Italy LUCX system and dark current (1) LUCX project (2) Phase Ⅰ and results (3) Phase Ⅱ and dark current Liu shengguang and LUCX.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
K. Floettmann WSHQE, OCT. 5, 2006 WSHQE Oct. 5, 2006 Klaus Floettmann Photo cathode requirements for the European XFEL.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
1/26 WSHQE–October 4-6, 2006 L. Monaco INFN Milano – LASA Photocathode FLASH: Quantum Efficiency (QE) L. Monaco Work supported by the European.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
FLASH. Free-Electron Laser in Hamburg TTF/FLASH: Injector Performance Dark Current Video ‘flags’ Comments based on Desy visit, 5 th May, /19/2010Desy.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
Beam Commissioning Adam Bartnik.
CTF3 PROBE BEAM LINAC COMMISSIONG AND OPERATIONS
Laser System Upgrade Overview
Sara Thorin, MAX IV Laboratory
by P. Musumeci and F.Tazzioli
Status of the CLIC main beam injectors
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
INJECTION SYSTEM UPDATE
Cesium Telluride Photocathode Preparation at Argonne
Gu Qiang For the project team
Upcoming longitudinal MDs
Injection facility for Novosibirsk Super Charm Tau Factory
BC2 Commissioning Parameters
RF-Gun for Phase-II RF Gun 10, June, 2016.
LCLS Commissioning Parameters
LCLS Commissioning Parameters
LCLS Longitudinal Feedback and Stability Requirements
LAL meeting on e+ studies, Oct. 2010
Injector: What is needed to improve the beam quality?
Fabrication of KEK-ATF2 Q-BPM
Test RF gun cavity Takuya Natsui.
Optical Feed Line Xiangyu Zhou 20. Nov
LCLS Commissioning Parameters
High Charge Low Emittance RF Gun for SuperKEKB
Drive Laser Commissioning Status
LCLS Commissioning Parameters
DC Photocathode Gun (JLAB)
Wednesday morning Waiting for PS – problem on RF cavity.
Injector for the Electron Cooler
SuperKEKB required (e+ / e-)
Experience with photoinjector at ATF
Presentation transcript:

A-1 RF gun Takuya Natsui

A-1 beam line

AT line (Thermal gun line) A1 line (RF gun line)

AT line A1 line to A1 line from AT line KL_A1_A KL_A1_B B RF Window AC_AT_2 GV_AT_2 SC_AT_1 KLY gallery tunnel IP_AT_L RF Window IP_A1A_KA IP_A1A_KB 真空マニホールド IP_A1A_KC QM_ AT_01,02,03 SC_AT_0 BX/Y_AT_0 AT_11,12,13 AC_AT_1 SC_AT_2 B IP_A1A_KD Att &Phase Shifter AT line Phase Shifter KL_A1_A to A1 line PB A1 line QM_ A1_01,02 A1_G1,G2 GV_A1_RG SC_A1_G BX/Y_A1_G SC_A1_0 KLY gallery tunnel IP_A1_G2 IP_A1_RC IP_A1_G1 IP_A1B_KD IP_A1B_KA IP_A1B_KB RF Window IP_A1B_KC BM_A1_0 GR_A1 IP_A1_LA IP_A1_LB A1_11,12,13 SC_A1_1 BM_A1_C1~C4 GV_A1_C4 AC_A1_1 Att &Phase Shifter KL_A1_B Dummy IP_A1A_KE 75L from AT line RF Window

Cathode plug

Used cathode plug damage (till 2015 Feb) Laser miss operation abrasion damage Break down damage

Cathode fix improvement Current cathode fix New cathode fix shrinkage fit No interspace dimension tolerance is required

New cathode installed to used cavity No interspace Installed to used cavity

Beam operation

Dummy road conditioning Conditioning log 2015/9/25 2015/10/15 Dummy road conditioning 18 MW achieved. The last operating period, 12 MW was maximum. Shrinkage fit and no miss-operation is necessary.

Laser injection to RF gun 2 w telescope BBO 4 w

laser 258 nm : 100 uJ 0.9 nC Q.E. = 4.4 x 10-5

We achieved two days stable operation. Recent operation log Disk amplifier is damaged Fix BPM error We achieved two days stable operation. (0.7 +/-0.3 nC)

0.7 nC 0.9 nC Beam charge is reduced at accelerating structure. Bunch length is too long. 0.7 nC 0.9 nC Bunch length measurement and bunch length control is required