RC1 Prototype Conceptual Design Review 15 December, 2005

Slides:



Advertisements
Similar presentations
Wire scanners MDW chicane energy collimator 3 MPS collimators in this region end of linac Damage Simulation in MPS Collimators L. Keller Apr. 9, 2006.
Advertisements

Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Collimator Damage Adriana Bungau The University of Manchester Cockcroft Institute “All Hands Meeting”, January 2006.
KT McDonald Target Studies Weekly Meeting July 10, Power Deposition in Graphite Targets of Various Radii K.T. McDonald, J. Back, N. Souchlas July.
CLIC collimator survival IWLC 2010 J.L. Fernández-Hernando – ASTeC/Cockcroft Institute (Daresbury Lab.) 21/10/2010 J.L. Fernández-HernandoASTeC/CI21/10/2010.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
Status of Phase II Energy Loss Studies 1. FLUKA with “simple” CERN-provided input file modeling ~40m around primary collimators used for all SLAC studies.
Estimation of temperature increase in the dump through Monte – Carlo simulations and rough calculations N. Charitonidis (EN/MEF)
The SLAC Phase II Collimator Program 15 June 2005 CERN Team Visit Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Plans for collimator survival and SLAC tests J. L. Fernandez-Hernando STFC/ASTeC Daresbury Lab.
DS Heat Load Scenarios in Collision Points and Cleaning Insertions. Prepared by F. Cerutti, A.Lechner and G. Steele on behalf of the FLUKA team (EN-STI)
Open Midplane Dipole (OMD) Design for Dipole First Layout R. Gupta (BNL), N. Mokhov (FANL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Collimator design and short range wakefields Adriana Bungau University of Manchester CERN, Dec 2006.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Design Review of the 1 st Rotatable Collimator (RC1) Prototype Project Overview 15 December 2005 Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
G.Kurevlev - Daresbury meeting Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
Phase II Collimators for LHC Upgrade at SLAC - Material Issues E. Doyle 03 Sept /25 Workshop on Materials for Collimators CERN 2007/09/03 Phase.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
The LARP Collimation Program 1 June 2005 LARP DOE Review-Fermilab Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
DRAFT Simulation of Errant Beams in the BDS How many bunches will damage beamline components or quench SC coils? Analysis Steps 1.Use TRANSPORT with BDS.
Recent Energy Deposition Simulations TCSM-A6L7 L. Keller LARP Video Mtg. 02 Oct
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
accident deformation – doyle 1/12 Phase II Collimator - Accident Deformation Simulation December 11, 2006.
Halo Collimation of Protons and Heavy Ions in SIS-100.
LARP Collimation – Engineering & Analysis
Radiation damage simulations for CLIC and ILC spoilers and ATF tests
BEAM LOSS MONITORING SYSTEM
Problem: A kicker failure can deposit 9 x 1011 protons on any metallic
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Thermo-mechanical simulations jaws + tank
Progress in Collimation study
Federico Carra – EN-MME
BEAM LOSS MONITORING SYSTEM
Beam collimation for SPPC
Recommendations of 12/16/05 review committee & SLAC response
LARP Collimation – Engineering & Analysis
23 April 2012 Tom Markiewicz/SLAC
Collimation for beta-beams
accident deformation – doyle (rev1) 1/8
LHC (SSC) Byung Yunn CASA.
Optic design and performance evaluation for SPPC collimation systems
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
LARP Rotatable Collimators for LHC Phase II Collimation
Discussion of High Energy Proton Losses in Arc 7
Efficiency of Two-Stage Collimation System
US LHC Accelerator Research Program
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
DIMAD REVMOC.
Collimator Efficiency Study
US LHC Accelerator Research Program
accident deformation – doyle 1/8
Presentation transcript:

RC1 Prototype Conceptual Design Review 15 December, 2005 US LHC Accelerator Research Program BNL - FNAL- LBNL - SLAC RC1 Prototype Conceptual Design Review 15 December, 2005 Energy Deposition Simulation in Phase II Secondary Collimators Two aspects: How to deal with accidental damage. How to safely handle power in normal LHC operation. L. Keller

secondary collimator - causing it to melt within a substantial volume. Problem: A kicker failure can deposit 9 x 1011 protons (8 bunches) on any metallic secondary collimator - causing it to melt within a substantial volume. Missteered beam 9E11 protons (8 bunches) on secondary Jaw 120 cm 3D ANSYS model, E. Doyle Cross section at shower max. Copper Jaw Copper 2.5 cm Fracture temp. of copper is about 200 deg C 2000 °C (not incl. heat of fusion)

SLAC Damage Test - 1971 Beam entering a few mm from the edge of a 30 cm long copper block The length and depth of this melted region is comparable to the ANSYS simulation for the LHC accident. 30 cm 500 kW e- beam Beam diameter ~ 2000 µ It took about 1.3 sec to melt thru the 30 cm block, but for this relatively large beam, the front two radiation lengths remain intact.

FLUKA-generated Simulation Model IR-7 dipoles Beam 2 Beam 1 First secondary collimator Primary collimators 40 m

TCSM1 Beam’s Eye View of a Phase I Skew Secondary Collimator stainless steel frame water “upper right” jaw, 8.0 cm parallel to gap, 2.5 cm perpendicular to gap TCSM1 So far, all FLUKA energy deposition simulations at SLAC have used this model for the primary and secondary collimators and varied the jaw material, length, and gap.

One-sigma Beam Sizes in IR-7

Energy Spectra of Particles Hitting TCSM1 Total energy of particles hitting both jaws is ≈ 3400 Gev/p seven s gap Keller: 2004-10-06

Power into the One Jaw of the First Secondary Collimator vs. Length More than 80% of the total power deposition is EM showers, mainly from π0 decays 4 x 1011 p/s lost

Transverse Power Distributions in TCSM1 at Shower Maximum Power lost in a 5 cm longitudinal slice from halo interacting in 60 cm primary collimator, TCPH, total 6.8 kW

Comparing TCPV with TCPH, the main differences occur in the 1st three secondary colls. Data from SixTrack Y. Cai 4 x 1011 p/s lost

Power Deposition on First Secondary Collimator in 12 Min. Lifetime (kW per jaw, 120 cm long jaw) Primary Collimator (source) TCSM.A6.L7 Copper Jaws at 7 sigma TCP.D6.L7 (TCPV) 68 TCP.C6.L7 (TCPH) 55 The most recent ANSYS simulations have been for this case. Reduce jaw length to 75 cm: 68 kW => 58.5 kW 120 cm long collimator Notes: Ray files for 60 cm long carbon primary collimators from LHC Collimator web page, July 2005.

Next Steps for FLUKA and ANSYS (for completeness, in parallel with construction) In the Phase II configuration with all 95 cm long copper cylinders, recalculate the energy absorbed by the down-beam superconducting magnets. In the CERN full-blown FLUKA model of IR7, must add secondary 95 cm, water-cooled, copper cylinders with 10 cm tapered ends and leave the Phase I carbon secondaries in place with their jaws withdrawn. Need help from the CERN group for this work. In the “short” FLUKA model change the first secondary collimator to a 95 cm water-cooled cylinder with tapered ends and include the water channels. Update the ANSYS model accordingly. 3. ANSYS accident simulations: a) Use quasi-static (few hundred msec) model to estimate permanent deformation. b) Use transient thermal shock analysis to estimate fracture damage. c) Predict the volume of the molten zone.