Adult Ladder Temperature Monitoring

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

ASIAES Project Overview Satellite Image Network for Natural Hazard Management in ASEAN+3 region Pakorn Apaphant Geo-Informatics and Space Technology Development.
District Leadership Team Stakeholder Involvement in the District Strategic Plan! Session #4 April 12th, 2011.
INC Report to the NANC January 18, Report Overview  INC Meetings Since November 16 NANC  LNPA Workshop Update  Audit Workshop Update  NANPE.
100 women…one goal. Understanding the Grant Process.
Item 11 Lahontan Region 2014 Timber Waiver April 10, 2014 Douglas Cushman P.E. Nonpoint Source Unit Chief 1.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Systematic Review Data Repository (SRDR™) The Systematic Review Data Repository (SRDR™) was developed by the Tufts Evidence-based Practice Center (EPC),
1 PingER Executive Plots MAGGIE 21 st Feb Sequence 1. Brief Overview of Project 2. Current Implementation and Capabilities 3. Types of Charts.
Using the Engaging Networks tools Ghazal Vaghedi Toronto February 21, 2012 #12ENCONF.
This chapter is extracted from Sommerville’s slides. Text book chapter
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
1 OECD Experience from SHA Collection 7th Meeting of Health Accounts Experts and Correspondents for Health Expenditure Data Paris, September, 2005.
AQS Development and Enhancement Plans AQS Development and Enhancement Plans AQS CONFERENCE Jake Summers June 9, 2010.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
TPIT using Model On Demand Jay Teixeira Manager Model Administration Regional Planning Group 5/21/13.
1 MIP Sequencing Tool Training Introduction to the Sequencing Tool.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
IRP Update IFTA 2006 Annual Business Meeting Las Vegas, NV Dave Saddler Presented by: Dave Saddler Executive Director IRP, Inc.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
City Commission Workshop Zoning Code Rewrite
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Special Language Characters in EDI Transactions Options and Considerations July 20, 2016.
(Required for DTCs, Recommended for STCs)
ERCOT Bylaws Changes for Regional Entity
Preparation of the Self-Study and Documentation
Microsoft Office Access 2010 Lab 3
2016 Smolt Monitoring Program Juvenile Passage Data and
Civil Rights Data Collection (CRDC)
For the San Diego County Region September 2007
FLEXIBLE LEARNING YEAR
EPC3000 Controllers Helping deliver an efficient and secure process Maintain the highest standard of production quality and ease your.
CIIMS Proposal for TOP-003 Approach
FPAC Development of the Future SMP
Formation Date: 9 November 1977 Geo Code: R
UK Link Technology Refresh
Triennial Review of Water Quality Standards Proposed Rulemaking
Lower Granite and Little Goose
Teacher Student Data Link (TSDL)
Texas Student Data System
Webinar: ESSA Improvement Planning Requirements
Impact Fee Advisory Committee January 31, 2017
2017 TMT Year-end Review December 12, 2017 Brandon R. Chockley
Kim Miller Oregon Department of Education
5 Steps to file your objections/ suggestions on KUDA Master Plan 2041
Evaluating Compuware OptimalJ as an MDA tool
Maternity Survey 2018: Contractor webinar
Car Hire Data Exchange (CHDX) Edits Project Update
(Required for DTCs, Recommended for STCs)
Electronic Field Study Advanced User Training
Existing WQ TDG Probe Downriver on North Shore
Manuscript Transcription Assistant Initiative
Laura Bright David Maier Portland State University
Maryland Online IEP System Instructional Series - PD Activity #5
Data Discovery Tools and Services Part B
FTE Recalibration Kendra Jahnke June 2018.
Reflective Report (Individual 20%) Assessment and Marking
Bonneville Washington Shore Fishladder Proposed Entrance Modification for Lamprey at North Downstream Entrance (NDE) Natalie Richards - Project Manager.
Formation Date: 9 November 1977 Geo Code: R
Formation Date: 20 November 1993 Geo Code: R
Formation Date: 14 November 2003 Geo Code: R
Formation Date: 14 February 2007 Geo Code: R
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
3 EGR Identification Service
MHS Senior Project.
Presentation transcript:

Adult Ladder Temperature Monitoring Fish Passage Operations and Management December 14, 2017 Brandon R. Chockley Fish Passage Center

Ladder Temperature Web Query and Database In 2016, FPC worked with COE to develop method for reporting ladder temperature data from all eight FCRPS sites Web query displayed hourly temperature data and temperature differentials between locations of interest Limited to 6 differentials for graphs

Ladder Temperature Web Query and Database http://www.fpc.org/river/watertemp.php Upon recommendation from FPOM and NOAA, several FCRPS sites added and/or moved temperature probes for 2017 FPC accommodated new/moved probes in 2017 with new naming scheme and web-query data table To accommodate changes in 2017, separate web-queries needed to be maintained for 2016 and 2017

Ladder Temperature Web Query and Database November 2017, FPC met with COE to discuss proposal to develop and implement new naming system for ladder temperature monitors New system would allow all years to be accessed via single web-query New system would accommodate new or moved probes without changes to web-query data table Would allow FPC to retroactively fit 2016 and 2017 data into new system COE suggested FPC provide overview of proposal to FPOM

Concept for Future Years Break each ladder into three Regions: Entrance (TW) Middle Section (MD) Exit (FB) Hypothetical Fish Ladder Exit (FB) Middle Section (MD) Entrance (TW)

Concept for Future Years Each Region broken into Numbered “Segments” Each segment may or may not have a probe Breaks between “Segments” should be strategically located (e.g., areas of water input, etc.) If single probe moved within a segment, given same name in all years Installation of new probe accommodated with no changes to database Hypothetical Fish Ladder FB1 MD3 MD4 MD2 TW1 MD1 Region Break Temp. Probe Segment Break Diffuser Turn Pool Could accommodate multiple probes in single segment

Concept for Future Years Files from HOBO Probes would be sent in same format as before, with Modified Naming Scheme* Four letter site code (LWGA, LSGA, MCNA, TDAA, etc.) One letter “Ladder” code (N, S, E, etc.) Bonneville: L=LPS, B=Bradford, N=WA Shore 3-digit alphanumeric Region/Segment Code* (TW1, MD1, MD2, FB1, etc.) One letter Probe Sequence Code* (A, B, C, etc.)

Example: Lower Granite Dam (LWGA) (Hypothetical) Region Break Segment Break Diffuser Turn Pool Temp. Probe 1 Ladder (South, S) 6 Total Probes 3 Entrance Segments TW1 – S. Entrances TW2 – N. PH Entrances TW3 – N. Spillway Entrances Each TW segment has one probe (Probe A) 1 Exit Segment (FB1) Single FB segment has one probe (Probe A) TW3 TW2 TW1 FB1

Example: Lower Granite Dam (LWGA) (Hypothetical) 1 Ladder (South, S) 6 Total Probes ~3 Middle Segments MD1- S. Entrance to Turnpool MD2 – Turnpool to Diffuser 14 MD3 – Diffuser 14 to Exit Segments MD1 and MD2 each have one probe (Probe A) Currently no probe in MD3 TW1 FB1 MD1 MD2 MD3 Region Break Temp. Probe Segment Break Diffuser Turn Pool

Example: Lower Granite Dam (LWGA) (Hypothetical) Region Break Segment Break Diffuser Turn Pool Temp. Probe 1 Ladder (South, S) 6 Total Probes LWGASTW1A, LWGASTW2A, LWGASTW3A, LWGASMD1A, LWGASMD2A, LWGASFB1A 5 Differentials (same as before) Entrance (TW1A) to Exit (FB1A) Entrance (TW2A) to Exit (FB1A) Entrance (TW3A) to Exit (FB1A) Entrance (TW1A) to Diffuser 14 (MD2A) Diffuser 14 (MD2A) to Exit (FB1A) TW3A TW2A TW1A MD1A FB1A MD2A

Next Steps FPC will use ladder maps to determine regions and sections for each ladder at FCRPS projects and provide details prior to January FPOM meeting for review/comments FPC will meet with COE District Staff and/or COE biologists to further refine details (January & February) FPC will develop single data table and incorporate 2016 & 2017 data FPC will develop and maintain metadata for web-query, including probe locations for each year FPC will update “manual” for downloading data and submitting files to FPC Target date of April for receiving data?