D Guidance 26-Jun: Would like to see a refresh of this title slide

Slides:



Advertisements
Similar presentations
Using NIMAC 2.0: The Accessible Media Producer Portal NIMAC 2.0 for AMPs.
Advertisements

Electronic Timesheet User Manual
SIS – NBS Online Specimen Tracking System Training
Members Only & Login Modules Members Only works with the Login module to provide password protection to Web pages and files. Login Groups may be created.
Guide to using the myNATE website
WELCOME TO SKYWARD EMPLOYEE ACCESS Step 1
Ohio Child Licensing and Quality System (OCLQS)
TFACTS Private Provider Financial/Invoicing Overview 1.
Prepared by ASM Research, Inc. 1 INTRODUCING the New AITAS for Non-DOD DAU Students Available for FY02 Acquisition Training Application System.
Navigation instructions Begin the tutorial Creating the Performance Plan Performance Management System Tutorial for Managers Estimated Time to Complete:
ShelterPoint™ Data-Entry Workflows. ShelterPoint v5.2.3.
E- MAIL APPLICATION CALENDAR MODUL. B ENEFITS OF CALENDAR Calendar sharing. Outlook Web App now enables your users to share their calendars with people.
101 P C O L S Recommended Role: New and Existing Resource Managers How to Redeem a Resource Manager Token in AIM I N T E R A C T I V E T U T O R I A L.
Recruitment Office Procedures Job Posting Requests Creating a Search Committee –Adding Search Committee MembersAdding Search Committee Members –Designating.
MPA Online Entering Solos, Ensembles, and Bands. The first step is to log into MPA Online at: You will need.
We will complete another date search by entering 2008 to 2010 in the Specify date range option and clicking on Search.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
Limits From the initial (HINARI) PubMed page, we will click on the Limits search option. Note also the hyperlinks to Advanced search and Help options.
To navigate through this Tutorial use your mouse, or Page Up key or Page Down key Registration Tour Unlock the “POWER” of V7.2 Introduction Slide One.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
NOVUS HR Formal Review Process Creating a Search Committee and Committee ChairCreating a Search Committee and Committee Chair Creating the Criteria Rating.
Add National Reserve (1N) Grants Chapter 5. Add National Reserve (1N) Grants 5-2 Objectives Understand How to Add a National Reserve (1N) Grant Enter.
Civilian Human Resources Training Application System Release IV Overview Training History 30 September 2008 Assistant G-1 for Civilian Corps Supporting.
Open your Browser and Navigate to Your browser will redirect you to and open the.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
1 Volunteer Management: Several new key features in Volunteer search, all designed to make the matching process more efficient. −Option to upload files.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Navigation: If the tutorial opens up in your web browser, simply click your mouse to advance to the next slide. Use the “Backspace”
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Fab25 User Training Cerium Labs LabCollector - LIMS Lynette Ballast.
Kamdhenu Website is used to Add agent in Kamdhenu offer under Group head Pfiger Software Technologies Pvt. Ltd.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
Training Guide for Residents
MicrosoftTM SharePoint Content Management SystemTutorial
Getting Started Using the Wheelock Student Portal
Quick Info Tables: Unsubmitted Transactions Transactions with Alerts
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
Procurement Desktop Defense (PD²) Creating an Indefinite Delivery Contract SPS Spotlight Series February 2014.
KARES Demonstration.
Project Applicant Profile
Electronic Handbooks (EHBs) Overview
Learn How to Register as a New Employer and Post a Job
A Step by Step Tutorial This PowerPoint presentation is intended to show eDMR users how to login and use the eDMR system.
How to Redeem a Resource Manager Token in AIM
SUBMITTING A PAYMENT REQUEST FORM
EPRM Template Guide v
Ohio Child Licensing and Quality System (OCLQS)
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
I-Supplier Training Guide
AmeriCorps Member Tutorial – OnCorps Reports 2.0, Standard Reports
Fantastic Graphics Inc. 2017
How to Create and Start a Test Session
Managing Rosters Screener Training Module Module 5
To the ETS – Encumbrance Online Training Course
2-1-1 Automated Verifications
Lesson 3: Epic Appointment Scheduling Referrals
HP ALM Defects Module To protect the confidential and proprietary information included in this material, it may not be disclosed or provided to any third.
Lesson 3: Epic Appointment Scheduling Referrals
Request Form You gain access to the Request Form from your intranet set-up by your IT dept. Or the internet via either our desktop launcher icon. Or a.
Log-In Instructions for In Roll
To the ETS – Encumbrance Online Training Course
Log in to Sycamore as you usually do. Click on My School.
School Webmasters – Calendar Management
D Guidance 26-Jun: Would like to see a refresh of this title slide
Completing the School Official Portion of the Student Profile
New and Improved Exam Registration Process
Complete exercise 8-11 in the workbook.
PCF-RPA TRAINING Requirement Process Version Number As of 02/13/2019.
Fall 2198 SmarterProctoring in Canvas Tutorial
Presentation transcript:

Project Code Management System (PCMS) Application Standard Operating Procedures D Guidance 26-Jun: Would like to see a refresh of this title slide. Should be able to see representation of all services and civilians (i.e. humanitarian effort). Director would like for us to bring him a few recommendations of possible design refreshes. September 12, 2017

Project Code Management System Access to this application requires a SAR submitted to the DAAS Web Portal URL: https://www2.transactionservices.dla.mil/portal/portal.asp Upon SAR approval and access to the Project Code Management System (PCMS) application, the above link will be presented as active in your DAAS Web Portal main page. Click on the link to access PCMS (Project Code Categories C & D). Access to this application requires a SAR submitted to the DAAS Web Portal. The URL for the DAAS portal is: https://www2.transactionservices.dla.mil/portal/portal.asp Upon SAR approval and access to the Project Code Management System (PCMS) application, the above link will be presented as active in your DAAS Web Portal main page. Click on the link to access PCMS (Project Code Categories C & D).

PCMS – Initial Query Page The Project Code Initial Query provides the opportunity to query a project code. Selecting “Ctrl + F” may be used to search for records using the Find box at the top of the browser window. The project code query will appear to left side of the screen, highlighting the matching project code in the PROJECT_CODE column. This query will provide you the opportunity to read (project code detail information), delete (pending project codes), and update a project code as necessary. The Project Code Initial Query provides the opportunity to query a project code. Selecting “Ctrl + F” may be used to search for records using the Find box at the top of the browser window. Project code will appear highlighted under PROJECT_CODE.

PCMS – Add Project Code To add a new project code, select the Add Record button at the top of the query page. To add project code, select the Add Record button at the top of the query page.

PCMS – Add Project Code Page Start by selecting the Project Category. Must be entered for the auto-generation of the next available project code and enabling other required/optional fields. Project Category = C or D Project Code = [Auto-generated] Project Name = If available Duration Continuous = T or F Lifecycle = A, P, or R Duration Begin Date = Begin date Duration End Date = End date (If continuous = T, no date required) Project Use = Project info Reference = MSG, EXORD#, ADC# Code Owner = D, H, or J Service Agency = ALL or specific Service/Agency codes POC = Org, First Name, Last Name, Commercial Number, DSN, Email FMS Allowed = T or F NATO Only = T or F Auto Activate Date = Date to auto-activate a pending project code * See notes page for field explanations Project Category = C or D (C = 3-series; D = 9-series project codes) Project Code = System will auto-generate the next available C or D project code. Project Name = If available Duration Continuous = T or F. (T = True; F = False) Must be F for category D project codes. Lifecycle = A, P, or R. (A = Active; P = Pending; R = Reserved) Duration Begin Date = Begin date. Effective start date for the project code. Duration End Date = End date. Anticipated end date at the establishment of the project code. If continuous = T, no date required. Project Use = Clear text statement explaining the intended use of the code. Reference (MSG, EXORD#, ADC#) = Cite the authorization for a project code. Code Owner = D, H, or J (D = DoD MILSTRIP; H = OSD; J = CJCS) Service Agency = ALL or specific Service/Agency codes. Reference DLM 4000.25-1, MILSTRIP, Appendix 2.2, Service Agency Codes. POC = Org, First Name, Last Name, Commercial Number, DSN, Email FMS Allowed = T or F (T = True; F = False) NATO Only = T or F (T = True; F = False) Auto Activate Date = Date to auto-activate a pending project code

PCMS – Add record parameter entries At completion of data entry, click the Add button. At completion of data entry, click the Add button.

PCMS – Add Project Code Confirmation Review content and click Add to save the record or Cancel to return to the query page. Review content and click Add to save the record or Cancel to return to the query page.

PCMS – System Record Save Verification PCMS will verify the record was successfully saved. Click the Return to Table button to return to the project code query page. PCMS will verify the record was successfully saved. Click the Return to Table button to return to the project code query page.

PCMS – Query to Validate Project Code Query for the new project code and PCMS will highlight newly added project code (PROJECT_CODE).

PCMS – Update Project Code To update an existing project code, query for the project code (Ctrl + F) and click update in the right most column. To update an existing project code, query for the project code (Ctrl + F) and click update in the right most column. An expired project code cannot be updated.

PCMS – Update Project Code Make changes and select the Update button when finished editing the record. Make changes and select the Update button when finished editing the record.

PCMS – Update Project Code Confirmation Verify updates are ready to be saved and click the Update button or Cancel to return to the query page. Canceling an update loses all changes made to the record. Verify updates are ready to be saved and click the Update button or Cancel to return to the query page.

PCMS – System Update Save Verification PCMS will verify record updates were successfully saved. Click the Return to Table button to return to the project code query page. PCMS will verify record updates were successfully saved. Click the Return to Table button to return to the project code query page.

PCMS – Reserved Record Parameters When reserving a project code that is not quite ready for activation, set Lifecycle to R. Changing Lifecycle to R only requires the entry of the Project Code. No other fields required. Click the Add button to complete the creation of the reserved project code. When reserving a project code that is not quite ready for activation, set Lifecycle to R. Changing Lifecycle to R only requires the entry of the Project Code. No other fields required. Click the Add button to complete the creation of the reserved project code.

PCMS – Reserved Project Code Confirmation Review content and click Add to save the record or Cancel to return to the query page. Review content and click Add to save the record or Cancel to return to the query page.

PCMS – Save Reserved Code Verification PCMS will verify the record was successfully saved. Click the Return to Table button to return to the project code query page.

Query to Validate Project Code Reserved Query for the reserved project code and PCMS will highlight newly added project code (PROJECT_CODE). Query for the reserved project code and PCMS will highlight newly added project code (PROJECT_CODE).

PCMS – Delete Reserved Project Code Only reserved project codes provide a delete option for the record. Click delete to request deletion of the project code. Only reserved project codes provide a delete option for the record. Click delete to request deletion of the project code.

PCMS – Confirm Reserved Record Deletion Review content and click Confirm to proceed with deleting the record or Cancel to return to the query page. Review content and click Confirm to proceed with deleting the record or Cancel to return to the query page.

Project Code Deletion Verification Screen PCMS will verify record was successfully deleted. Click the Return to Table button to return to the project code query page. PCMS will verify record was successfully deleted. Click the Return to Table button to return to the project code query page.

PCMS – Back to Query Table This completes the standard operating procedures for PCMS. To exit PCMS, close the browser (x).