Waterfowl Hunting Zones and Splits for the 2011 – 2015 Seasons Paul Link LWF Commission 2/8/2011.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
WPA-WHO Global Survey of Psychiatrists' Attitudes Towards Mental Disorders Classification Results for the Spanish Society of Psychiatry.
1 A B C
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
STATISTICS HYPOTHESES TEST (I)
David Burdett May 11, 2004 Package Binding for WS CDL.
Continuous Numerical Data
Whiteboardmaths.com © 2004 All rights reserved
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt RhymesMapsMathInsects.
Mean, Median, Mode & Range
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Media-Monitoring Final Report April - May 2010 News.
1 Combination Symbols A supplement to Greenleafs QR Text Compiled by Samuel Marateck ©2009.
Break Time Remaining 10:00.
Turing Machines.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
2 |SharePoint Saturday New York City
1 The Royal Doulton Company The Royal Doulton Company is an English company producing tableware and collectables, dating to Operating originally.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1..
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Artificial Intelligence
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
Presentation transcript:

Waterfowl Hunting Zones and Splits for the 2011 – 2015 Seasons Paul Link LWF Commission 2/8/2011

Zone/Split Season Guidelines: Zones and Split Seasons can only be changed at 5 year intervals.Zones and Split Seasons can only be changed at 5 year intervals. The selection this year will be used for the next 5 duck hunting seasons ( ).The selection this year will be used for the next 5 duck hunting seasons ( ). A decision is needed by JulyA decision is needed by July

Fish and Wildlife Service Options Two zones with the option for split seasons Two zones with the option for split seasons in one or both zones. in one or both zones. Three zones with straight seasons (no splits). Three zones with straight seasons (no splits). No zones with up to 2 season splits (3 season No zones with up to 2 season splits (3 season segments) segments) Proposed for 2011: 4 zones with straight seasons (no splits). 4 zones with straight seasons (no splits). 3 zones with the option for split seasons in any of 3 zones with the option for split seasons in any of those zones

What if we choose a new option? … we requested that the National Flyway Council develop explicit human dimensions objectives related to expanding zone and split options and a study plan to evaluate the effect of the proposed action in achieving those objectives. We expect the study plan will include hypotheses and specific predictions about the effect of changing zone/split criteria on stated human dimensions objectives, and monitoring and evaluations that would be used to test those predictions. Paul Schmidt, Chairman of USFWS Regulations Committee, 1/25/2011

Human Dimensions Data 2005 Hunter Opinion Survey: 53% favored current 2 zones with split seasons53% favored current 2 zones with split seasons 41% favored no zones with 2 splits (3 season segments)41% favored no zones with 2 splits (3 season segments) 6% favored 3 zones with straight seasons (no splits)6% favored 3 zones with straight seasons (no splits)

Human Dimensions Data 2010 Hunter Opinion Survey: Random Mail-out Sample 34% favored 2 zones with split seasons.34% favored 2 zones with split seasons. 17% favored new North and South zones with split seasons.17% favored new North and South zones with split seasons. 30% favored no zones with 2 splits (3 season segments).30% favored no zones with 2 splits (3 season segments). 20% had no opinion or didnt care.20% had no opinion or didnt care Hunter Opinion Survey: Internet Sample 36% favored 2 zones with split seasons.36% favored 2 zones with split seasons. 23% favored new North and South zones with split seasons.23% favored new North and South zones with split seasons. 28% favored no zones with 2 splits (3 season segments).28% favored no zones with 2 splits (3 season segments). 13% had no opinion or didnt care.13% had no opinion or didnt care.

Human Dimensions Data Recent Internet Solicitation: 61 contacts 54% favored 2 zones with split seasons.54% favored 2 zones with split seasons. 33% favored no zones with 2 splits (3 season segments).33% favored no zones with 2 splits (3 season segments). 11% favored 3 zones with split seasons.11% favored 3 zones with split seasons. 2% favored no zones with split seasons.2% favored no zones with split seasons.

General Issues to Consider Potential hunting season length over the next 5 years is 60, 45 or 30 days.Potential hunting season length over the next 5 years is 60, 45 or 30 days. Duck seasons must be open during the Thanksgiving, Christmas and New Years holidays.Duck seasons must be open during the Thanksgiving, Christmas and New Years holidays. Which option will provide the greatest flexibility?Which option will provide the greatest flexibility? Zones and split seasons are completely separate for ducks and geese.Zones and split seasons are completely separate for ducks and geese. What are we trying to accomplish, and what will be required for evaluation?What are we trying to accomplish, and what will be required for evaluation?

Specific Considerations Current 2 zones with split seasons: This arrangement has been used for 30 years and is familiar to hunters.This arrangement has been used for 30 years and is familiar to hunters. Allows hunters to hunt in both zones, thereby increasing hunting opportunities.Allows hunters to hunt in both zones, thereby increasing hunting opportunities. FlexibilityFlexibility

Specific Considerations No zones with 2 splits (3 season segments): Three opening days versus 2, but same total number of weekends (10) and 1 of those opening days might not be on a weekend.Three opening days versus 2, but same total number of weekends (10) and 1 of those opening days might not be on a weekend. 2 rest periods versus one.2 rest periods versus one. The opportunity to move across zones is eliminated.The opportunity to move across zones is eliminated. Less flexibility if season length is reduced.Less flexibility if season length is reduced.

Example: potential dates 2-zones/2-splits No zones/3-splits 2-zones/2-splits No zones/3-splits Nov 12 – Dec 4Nov 19 – Dec 4 Nov 12 – Nov 27 Dec 17 – Jan 22Dec 17 – Jan 29 Dec 10 – Jan 8 * Jan 16 – Jan 29 * Jan 16 – Jan 29 West Zone East Zone West Zone East Zone * Season opens on a Monday

Specific Considerations 3 zones with split seasons: Additional opportunity to hunt different zones.Additional opportunity to hunt different zones. Additional flexibility.Additional flexibility. Statement of objectives and study plan with methods to monitor and evaluate.Statement of objectives and study plan with methods to monitor and evaluate.

Example: Northwest LA zone

Justification?? Zone Week Southwest Southeast Northwest (46.7) 12.1 (44.6) 11.4 (41.6) (46.7) 12.1 (44.6) 11.4 (41.6) (47.1) 3.3 (46.2) 3.8 (52.0) (47.1) 3.3 (46.2) 3.8 (52.0) Chronology of Harvest: seasons:

Anticipated Time-line Options may not be finalized in time for adoption for the 2011 season.Options may not be finalized in time for adoption for the 2011 season. Public comment will be accepted at announced public meetingsPublic comment will be accepted at announced public meetings Department recommendations in July with opportunity for additional public commentDepartment recommendations in July with opportunity for additional public comment Decision at August LWF Commission meetingDecision at August LWF Commission meeting

17