The FSDT Tanzania Experience

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process.
Advertisements

CHAPTER 1 INTRODUCTION TO MANAGEMENT. CHAPTER 1 INTRODUCTION TO MANAGEMENT.
MAF’s M & E System Development Achievements and Ways Forward SWG-ARD, September 30, 2014 DoPC, MAF By: Somphathay Liengsone Deputy Director of Project.
Professional Certificate – Managing Public Accounts Committees Ian “Ren” Rennie.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
A Strategic Approach to a National IP Policy Ron Marchant CB FRSA Intellectual Property Rights Management, Riga, May 2012.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
July 2007 National Quality Assurance and Accreditation Committee & Quality Assurance and Accreditation Project Role of Action Planning in The Developmental.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of the MICS Process.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Capacity Development Results Framework A strategic and results-oriented approach to learning for capacity development.
System of Environmental-Economic Accounting Sokol Vako United Nations Statistics Division Training for the worldwide implementation of the System of Environmental.
1 Strategy for mobilizing funds for agricultural census – Tanzania Experience By Lubili Marco Gambamala National Bureau of Statistics 97.7% of smallholder.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Stages of Research and Development
JMFIP Financial Management Conference
Key features of an effective Compliance Strategy
PILOT SCHOOL PRINCIPAL EVALUATION
Ministry of Labour and Social Welfare
Pre-planning Planning to plan (and adapt) Implementation starts Here!
Auditing Sustainable Development Goals
Multiple Indicator Cluster Surveys Survey Design Workshop
PILOT USE OF RESPONSIBLE AGRICULTURAL INVESTMENT PRINCIPLES:
SOAR Observatory Strategic Planning Initial Concept Presentation
November 30, 2015 Discussion Draft
Leadership and Management Training
Ivor Beazley, World Bank
Programme Board 6th Meeting May 2017 Craig Larlee
Corporate-level Evaluation of IFAD’s Decentralization Experience
Suggestion for next steps for PGA for REDD+ in Vietnam
Media and communication in Zanzib ar
The Key to Hiring Excellence “The act of working together to achieve a common purpose.” —Oxford Dictionary.
CMS HIPAA Transaction Implementation Status Checklist
Expanding Product Accessibility with Primary Market Research Techniques Jennifer L Flagg Center on Knowledge Translation for Technology Transfer, University.
SWAPs: Based on Lessons Mainly from Morocco and Zambia
Solicitors Qualifying Examination (SQE)
Monitoring and Evaluation using the
Our new quality framework and methodology:
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
The SWA Collaborative Behaviors
GOVERNMENT OF INDONESIA,
Using the EFQM Excellence Model to support the role of a trustee
Deloitte Consulting LLP SCOOPS Session
Engaging Your Stakeholders and Making the Most of Your Team
school self-evaluation and improvement toolkit
Job Analysis CHAPTER FOUR Screen graphics created by:
Identifying enablers & disablers to change
Safety Management System Implementation
Strengthening Economic Statistics in Lao PDR
Helene Skikos DG Education and Culture
Integrated River Basin Management
Albania 2021 Population and Housing Census - Plans
Building Statistical Capacity UNSD perspective
Key Value Indicators (KVIs)
Assessment Workshop September 16, 2009.
Western Balkan recommendations on public consultations on draft legislation and public policy documents.
Planning and Implementation of Post Enumeration Surveys Pres. 4
Western Balkan recommendations on public consultations on draft legislation and public policy documents.
ReaAlignment Workshop: Internal Communication
MSFD and public participation: NGO experiences
Transparency Serbia Presentation September 27th 2010
Issues of Technology Needs Assessment for Climate Change
UNFCCC Needs-based Finance (NBF) Project
GENERATING ISSUE-ORIENTED STATISTICS AND INDICATORS
Leading Change in Organizations
Project Name Here Kick-off Date
Presentation transcript:

The FSDT Tanzania Experience FinScope in Tanzania The FSDT Tanzania Experience Ian Robinson, Technical Director FSDT Annette Altvater, FinScope Project Coordinator FinScope Africa Conference, Valley Lodge, Magaliesburg, SA, 28. March 2006

Key Issues for FinScope in Tanzania FinScope is the top priority project for FSDT A great deal of credibility rides on the successful outcome => Drives the decisions we take and the way we take them!

Key Issues (cont) FinScope engages a wide range of stakeholders (Stakeholder Task Force) with the aims of: Insuring stakeholders' understanding of key issues such as sampling, questionnaire design and project management => Securing “buy in” to maximise the chances of stakeholders actively using FinScope data & analysis Creating knowledge sharing and learning at local level to feed back into subsequent surveys.

Key Issues (cont) We won’t get it right first time, but… FinScope in Tanzania should be: As well thought through as possible Provide data and analysis in which stakeholders have confidence and will thus use For these reasons FSDT Employed a Project Coordinator Time is not the essence; getting it “right” is

FinScope Survey Status Awareness creation and information for a broad range of stakeholders Establishment of the Stakeholder Task Force and the ‘d-group’ webpage. Institutional arrangements for the FinScope implementing agents

Institutional Arrangements

Roles of FinScope Implementing Agents Individual master list Instrument design, FDGs, pilot testing, survey implementation, data capture/ cleaning/ electronic processing Knowledge transfer, Quality control Technical assistance and Implementing agent coordination & monitoring Tailoring FinScope to the Tanzanian context

FinScope Survey Status Questionnaire design and development Sample design and drawing up of master list of individuals in selected households Project management and coordination of implementing agents Quality control of deployed survey techniques Focus Group Discussion Recruitment and training of moderators (FDGs) and enumerators Methodology for drawing up a individual master list

Time Line for the Survey Focus groups & pilot survey – March/ April Drawing up master list – April Finalise questionnaire – early May Field work – mid May Data entry/ cleaning - July Segmentation & modelling - August Dissemination - September

Lessons Learned to Date FinScope initially can be difficult for stakeholders to grasp fully Methodology and terminology ‘translated’ and presented in a ‘digestible’ way to stakeholders, who come from different disciplines and are of different educational backgrounds At concept and planning stage it is difficult immediately to grasp the merits of FinScope Case studies are good to demonstrate how it can be done, but insufficient to explain the underlying concepts behinds FinScope. Takes time and clear explanation, e.g. of core & psychographic questions

Lessons Learned (cont) Difficult to keep stakeholders involvement and commitment consistent Keep stakeholders informed, consult but expect only limited proactive involvement Don’t involve everybody in everything: discuss only the sections of the questionnaire of interest to particular stakeholder groups

Lessons Learned (cont) Who is doing what? Select the right partner for the right tasks, e.g. division of tasks between Steadmans & NBS Tasks may be redefined in the course of the process, therefore contracts either agreed later &/ or kept flexible Survey techniques may need to be adjusted Local testing and probing of critical issues are worthwhile to complement experiences elsewhere

Lessons Learned (cont) Working materials provide for process documentation - at times requires complementary documentation Stakeholders represent potential users of survey data, not the individuals interviewed The individual consumer not necessarily represented as a stakeholder => Of utmost importance to deploy methodologies and tools that assess their perception and understanding.

Recommendations – for FMT Development of FinScope methodologies in the form of a course for implementing agents, sponsors and possibly stakeholders covering Underlying concepts Planning and design stage Logical process flow and issues to be considered at all stages Demonstration of applied knowledge by case studies Tools and methodologies of probing and testing Operational issues Technical issues to be considered and decided upon during the entire process. Problem-solving strategies

Recommendations – for Implementing Agents The applied methodology is only as good as it suits and serves the objective of the survey Nobody ‘runs the show’ on their own: FinScope is a collaborative effort – major efforts in coordination and flexibility During the process tasks may be refined. May have implications for working plans and budgets Take into account different levels of understanding, while dealing with other agents and stakeholders Strive for as much communication and knowledge sharing as possible. Ensure transparency of processes