IEEE 802.11 Fast Initial Authentication Study Group Closing Report April 2009 doc.: IEEE 802.19-09/xxxxr0 November 2010 IEEE 802.11 Fast Initial Authentication Study Group Closing Report Date: 2010-11-13 Authors: Name Company Address Phone email Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN +81-3-5719-7630 hmano@root-hq.com Marc Emmelmann Fraunhofer FOKUS Kaiserin-Augusta-Alle 31 10589 Berlin Germany +49-30-3463 7268 emmelmann@ieee.org Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion
April 2009 doc.: IEEE 802.19-09/xxxxr0 November 2010 Abstract This presentation is the closing report for the Dallas meeting of the IEEE 802.11 FIA SG. Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion
Agenda Agenda Modify and/or Approve Agenda November 2010 Agenda Agenda Modify and/or Approve Agenda Review and Approve the Waikoloa and Teleconference meeting minutes Plan for the Week Respond to 802 plenary review comments Motion to expand Study Gorup Motion to approve PAR updated TIME line of FIA Plan for November & Teleconference Hiroshi Mano (Root Inc.)
November 2010 Accomplishments Approve the Waikoloa and Teleconference meeting minutes Approve extension of study group and forward to WG Approve updated PAR and forward to WG Time line December 2010 PAR approved by Rev com January 2011 Election of the Chair Presentations for use-case , technical requirement , and all of related presentations. Approve teleconference schedules Hiroshi Mano (Root Inc.)
Motion for extend Study Group April 2009 doc.: IEEE 802.19-09/xxxxr0 July 2010 Motion for extend Study Group Motion: Request the IEEE 802 LMSC to extend the 802.11 Fast Initial Authentication Study Group until the end of March 802.11 plenary . Fast Initial Authentication Study Group vote: Moved:Marc Emmelman, Seconded: Dwight Smith Result: 13-0-0 Motion passed Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion
Teleconference Schedule November 2010 Teleconference Schedule Motion: Approve the following schedule of weekly teleconferences. December 1s t 01:00 am EST, 15th 11:30 am EST, 2010 January 5th 01:00 am EST, 12th 11:30 am EST, 2011 Duration 1Hour Using WEB-EX that will be provided by Study Group Chair Moved: Dwight Smith, Seconded: Seconded:Harry Worstell Result: 16-0-1 Motion passed Hiroshi Mano (Root Inc.)
Motion to approve PAR update April 2009 doc.: IEEE 802.19-09/xxxxr0 July 2010 Motion to approve PAR update Motion: Request that the PAR contained in 11-10-1152r1 be posted for 802.11WG review and EC approval to submit to NesCom. Fast Initial Authentication Study Group vote: Moved: Jon Rosdahl, Seconded: Harry Worstell Result:17 - 0 - 0 Motion passed Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion
November 2010 Documents Minutes 11-10-1160-00-0fia-fia-meeting-minutes-september-2010-interim.docx. 11-10-1219-01-0fia-ieee-802-11-fia-sg-october-27-2010-telephone-conference-minutes.doc PAR 11-10-1152-01-0fia-fast-initial-link-set-up-par.doc Hiroshi Mano (Root Inc.)
Thanks to all who participated! November 2010 Thanks to all who participated! Hiroshi Mano (Root Inc.)