Hall D Cryogenic requirements

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
HEL pre-design Diego Perini Superconducting solenoid Operation temperature: 4.2 K, current:about 250A, magnetic field: 5 Tesla Cooled by liquid.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
K. McDonald ICEC23-ICMC2010, Wroclaw July 20, Use of He Gas Cooled by Liquid Hydrogen with a 15-T Pulsed Copper Solenoid Magnet K.T. McDonald Princeton.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Hall B Cryogenics CLAS and CLAS12 David Kashy Hall B Lead Engineer May 26, 2010.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Test Lab Cryogenic Requirements Kirk Davis Director’s Review of Cryogenic Capacity 26 May, 2010.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
DON LYNCH DECEMBER 4, AGENDA December 4, BABAR Magnet Update Outer HCal Structural Analysis (Assembly and Support) sPHENIX Project Management.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Refrigeration of Superconducting Solenoids T W Bradshaw Rutherford Appleton Laboratory Harwell Science and Innovation Campus Didcot, OX11 0QX, UK
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
Integration of the Spectrometer Solenoid Magnets
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
Study and Development of Large Cryogenic Systems in China
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Renuka Rajput Ghoshal John Hogan Ruben J. Fair Probir K. Ghoshal
FRIB Cryogenic Support
BA6 – crab cavity activities in EYETS
The hybrid magnet and its superconducting outsert
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
BDS Cryogenic System RDR Status and EDR Plans
Hollow e- lens, Cryogenic aspects
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
Status of the cryogenic system for B180
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
SoLID Magnet - Engineering and Cost
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Mathew C. Wright January 26, 2009
Cryo-ops 2018,Beijing,IHEP
ESR 2 Presented to Joint Hall A/C Summer Meeting
FRIB summary of performance degradation - VTA to cryomodule
Cryogenics – The Basics
CTF Users’ Perspective
ESR2 Process Cycle Design
One Coil Gun Magnet February 2, 2016.
Thermohydraulic behaviour of the cryogenic system
ESR2 Process Cycle Design
Presentation transcript:

Hall D Cryogenic requirements Now thru ? T. Whitlatch

Solenoid System Diagram as Installed in Hall D 4 Superconducting coils Bathed in Liquid Helium Nominal Operation 1500A 40 year old magnet

Coil 4 (of 4)

Solenoid Coil Test Set Up Test at Full Current and equivalent loads Cold box 3 refrigerator to be used in test lab and Hall D Cryo Can due in May/June 1 All hardware ready by Mid June Racks complete (and tested) by June Power supply in place Rails/Supports in place Cryo Can Anaconda Rails Power Supply Racks Coil 1 End Plate

Solenoid Magnet Installed in Hall D Dec 2011

Solenoid coil test in Test Lab summer 2010-2011

Hall D Cryo Target Liquid Hydrogen – 4 x 40 cm < 1 g/s required Use stand alone refrig? Marginal to use Cold box 3