Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Advertisements

Natural Gas Emergency Plan
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Exercise Prelude Paul Youngman. 2 Exercise Prelude Exercise Prelude took place on the 5 th and 6 th of November with the final report being published.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
NEC Network Emergency Exercise - Exercise Prelude.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
UNC Modification 0050 – Storage Monitor Adjustment.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Exercise Neptune Findings Gas Customer Forum 29 th January 2007 Jacky Carroll Network Manager Emergency Planning Gas National Control Centre.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 6 January 2011
Transmission Workstream 7th Dec 2006 Chris Logue
Black Start Overview.
UNC Modification Proposal 0202 National Grid Distribution
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Consideration of issues raised by UNC Modification Proposal 0244
Review of System Alerts
System information provision
Transmission Workgroup 7th July 2011
Demand Control Field Trials
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
Catheterization laboratories contain monitors, radiography equipment, sterile supplies, emergency carts, and other equipment necessary to perform the procedure.
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Most incidents are small in nature, with a correspondingly small response organization, consisting of an IC and a handful of individual resources.
UNC 0407 Analysis Scope - Update
Proposer: National Grid NTS Panel Date: 17th April 2014
Review of System Alerts
MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective
NTS Entry Charging Review Update
Simon Trivella – 22nd May 2008 Distribution Workstream
Connected System Exit Points Administration Options
DSR Volumetrics Workgroup 3 10 September 2014.
Review of Physical Regime Times for Modification Proposal 461
Connected System Exit Points Administration Options
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Flow Swaps at NTS / LDZ offtakes
DN Interruption & Charging
DSR Workgroup 10 September
Review Group /09/2007.
UNC Transmission Workstream 15th June 2005
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
International Gas Union (IGU) Triennial Work Programme
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Stefan Leedham Transmission Workstream 2nd November 2006
Proposed Changes to UNC Section Q Emergencies - Mod 035
30th November 2007 Beverley Grubb SGN
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Review Group 0175: DM Supply Point Emergency Arrangements National Grid NTS 18 December 2007

Impact of more DM load From NTS perspective, greater DM participation has potential to reduce Safety Monitor volumes Associated benefit dependent on actual load reduction by isolation DM loads “protected by isolation” have certain obligations during an emergency Obligations set out in UNC TPD Section Q and the Emergency Procedures

Emergency Procedures E1 – Network Gas Supply Emergency (NGSE) Managing gas supply emergencies on the primary system (NTS) E2 – Local Gas Supply Emergency (LGSE) Managing gas supply emergencies on the secondary system (DN) E3 – Operational Procedures

Emergency Stages

Demand Reduction