Electronics Sub-Group

Slides:



Advertisements
Similar presentations
23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
Advertisements

Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
SVD Serial Numbers M.Friedl (HEPHY Vienna) 6 May 2014.
KEK High Energy Accelerator Research Organization Katsuro Nakamura (KEK) T. Bergauer B, G. Casarosa F, M. Friedl B, K. Hara, T. Higuchi A, C. Irmler B,
DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Networking Computers. Advantages & Disadvantages of Networking.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
23 July 2012 Thoms Bergauer (HEPHY Vienna) Sensor Irradiations and Testbeams 12 th B2GM Bad Aibling.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Data Acquisition System of SVD2.0 This series of slides explains how we take normal, calibration and system test data of the SVD 2.0 and monitor the environment.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
1 Oct 2008 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
APV25, Clock and Trigger M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)18 Mar 2009 APV25 Please refer to my December 2008 meeting slides for details.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
SVD DAQ 25 Jan 2011 Belle2 DAQ T. Tsuboyama (KEK)
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
Interlock L.Lanceri /INFN Trieste VXD Workshop, Pisa 03/10/2014
Markus Friedl (HEPHY Vienna)
Slow Control Servers C. Irmler SVD 27th B2GM, KEK 21 June 2017.
7th Belle II VXD Workshop, Prague
KEK news ( ) S.Tanaka.
Status of the CO2 Cooling Project
The ILC Control Work Packages
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
Brainstorm with your team about anything/everything a computer(PC) may have, contain or need to make it usable. Put one thing on each sticky note.
Client-Server Interaction
URBAN CLAP. URBAN CLAP Urban Clap, a preeminent UAE based IT service Provider Company eminent for repairing Computers and mobiles.
Call : (+91) | | Skype : kinshtech | Website : Hired an SEO Expert? What should you expect?
SVD Mechanics Group Organization & Work packages
Comments to the SVD4 structure
Trigger session report
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
APV25, Clock and Trigger M.Friedl HEPHY Vienna.
Jigsaw Activity.
SVD group organization, schedule, milestones
Presentation transcript:

Electronics Sub-Group 22 January 2015 Electronics Sub-Group Markus Friedl (HEPHY Vienna)

SVD Organization M.Friedl: Electronics Sub-Group 22 January 2015

Electronics Work Packages FADC (hardware, firmware, software) M. Friedl, R. Thalmeier, K. Nakamura, H. Yin, S. Bacher FTB W. Ostrowicz, Z. Natkaniec, K. Nakamura, M. Schnell Power Supplies F. Forti Noise, grounding, test beams T. Bergauer, M. Friedl, C. Irmler, R. Thalmeier, H. Yin KEK infrastructure T. Tsuboyama (Technicians and undergrad students are not listed) M.Friedl: Electronics Sub-Group 22 January 2015

Collaboration Weekly SVD meeting Discussion of topics of general interest Email discussion (sometimes invoking svd2ml) For topics among experts Topical sessions During VXD meetings Also for B2GM (?) Occasionally: dedicated meetings E.g. FADC meeting on 12 May 2014 M.Friedl: Electronics Sub-Group 22 January 2015