Defence Industrial Corridor Uttar Pradesh Defence Industrial Corridor 13-04-2019
Agra-Lucknow Expressway Identified Nodes Agra-Lucknow Expressway Bundelkhand Expressway Primary Catchment Area Secondary Catchment Area Agra /Aligarh node Kanpur Node Jalaun Node Jhansi Node Chitrakoot Node 13-04-2019
Land Procurement - Cost Details Total 6 Number of Nodes have been identified at Agra, Aligarh, Chitrakoot, Jalaun, Jhansi and Kanpur Node Total Land Identified (in hectares) Land to be Procured from Farmers (A) Cost of Land Procurement (in Rs) (B) 4 times the Cost of Land Procurement (in Rs) (D= 4*B) Jhansi ( 10 villages of Garautha Tehsil) 3025.348 ha. 2773.674 ha. (91.68 % of identified land) INR 235.206 Crores INR 940.83 Crores Chitrakoot (11 villages of Karwi Tehsil) 500.000 ha. (100% of identified land) INR 58.05Cr. INR 232.20 Cr. Jalaun (villages of Tehsil Konch) 200.000 ha. (100 % of identified land) INR 37.5 Crores INR 150 Crores Aligarh (Village Andla, Tehsil Khair) 45.84 ha. 45.84 ha.(100 % of identified land) INR 52.31 Crores INR 52.31 Crores (since Land is already with Agriculture department) 13-04-2019
Land Procurement - Cost Details Node Total Land Identified (in hectares) Land to be Procured (A) Cost of Land Procurement (in Rs) (B) 4 times the Cost of Land Procurement (in Rs) (D= 4*B) Agra (Etmadpur Tehsil – Villages of Raghubans Pura and Rahan Kalan) 400 300 INR 450 Cr. INR 450 Cr. (since the Land is already with the Govt. Kanpur (10 villages in Mandhana) 1000 (340 from Govt. and 660 Ha by Purchase) INR 1450 Cr. Total 5071.19 INR 3275.34 Cr. 13-04-2019
Land Identification Summary During land identification process, the following criteria were considered: Connectivity (Road, Rail and Air) Enabling Infrastructure (Power, Water, Land) Type of Land Land Cost Demographic Profile Total Land Procurement Cost: INR 3275.34 Cr. Land Proposal for all 6 Nodes, sent to Government for Approval 13-04-2019
13-04-2019