Proposal for Financing Balti - Criva road sector rehabilitation

Slides:



Advertisements
Similar presentations
1 EU Strategy for the Baltic Sea Region Visby Transport Workshop, 12 June 2009 Priority Area 11To Improve Internal and External Transport Links Main Actions.
Advertisements

Kosovo Ministry of Transport & Communications
TRACECA PROJECT EVALUATION. PROJECT Rehabilitation and Reconstruction of the Key Transit Highways Connecting the Centre of the Republic of Armenia to.
Round Table on Implementing Trade Facilitation in Transition Economies Geneva, 31 May 2002 Strategy for the facilitation of transit transport in Ukraine.
MINISTRY OF TRANSPORT, CONSTRUCTIONS AND TOURISM SOP – Transport Infrastructure ROMANIA, Bucharest 27 October 2005.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.
The road transportation infrastructure program for Romania.
Nedim Begovic, Regional Railway Expert Railway Infrastructure th April 2015, Belgrade SEETO Comprehensive Network Development Plan 2015.
Montenegro Ministry of Transport, Maritime Affairs and Telecommunications Vienna Economic Forum »Invest in Montenegro. Invest in the Region « M I N I S.
PPP Development Stage in Republic of Moldova Presented by: Ion Potlog Head of PPP Division CAPACITY BUILDING WORKSHOP ON PUBLIC PRIVATE PARTNERSHIPS (PPPs)
1 Passenger Traffic Road + 67 % m/s - 7% (60%) Rail + 23% m/s - 2% (8%) Air + 133% m/s =1% (4%) Growth Total 65% ( Int 66%) GDP108% CEC 12 source.
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
ROAD TRANSPORT SECTOR IMPLEMENTATION OF SELECTED MEASURES AND INTERNATIONAL AGREEMENTS Chişinău 2011.
Commission for Territorial Cohesion Policy (COTER) Seminar – Interconnecting Europe’s Regions: the Territorial Perspective Iasi, 18 th of September, 2014,
The stages of promotion and implementation of a high-speed line project in Romania Adrian DRAGOMIRESCU Head of Department for planning and monitoring activities.
State company «Russian highways» General presentation June 2011.
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
ROADS IN UKRAINE 1. 2 SECTOR INFORMATION  Ukraine has significant potential for motorway development due to its location on the intersection of multiple.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
TRACECA PROJECT EVALUATION
EU Energy-related projects in Belarus. Elena Rakova, project manager June 30, 2011.
REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
"State-Business Cooperation in the RK. Infrastructure Construction"
A European Commission funded Regional Programme since Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation.
ASEM SYMPOSIUM on Eurasia Transport and Logistics Network Seoul th September 2015 Hon.Joe Mizzi, Minister for Transport and Infrastructure - Malta.
TRACECA PROJECT EVALUATION. Construction of Unguri-Bronitsa border crossing point and access roads from Ukraine and Moldova.
TRACECA PROJECT EVALUATION
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
Transport Enhancing TEN-T funding Pawel Stelmaszczyk Special Envoy for European Mobility Network DG MOVE Warsaw, 18 December 2013.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
Rail Baltica Growth Corridor – First Transnational Roundtable Vilnius, Lithuania 24 November crucial year for Rail Baltica -2? Dr.Roberts Zile.
Project # 1 Rikoti-Zestaponi Highway May, Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
SEETO Comprehensive Rail Network Development
The Almaty Programme of Action A New Global Framework for Transit Transport Cooperation for Landlocked and Transit Developing Countries.
the Republic of Moldova
110/02/2012UfM Senior Officials Meeting, Brussels COMPLETION OF THE CENTRAL SECTION OF THE TRANS-MAGHREB MOTORWAY AXIS.
JASPERS for CEF Stéphane OUAKI Head Of Unit
The National Strategy of Slovak Republic
The National Strategy of Slovak Republic Ing. Iveta Kubasáková, PhD.- Ing. Ivana Šimková University of Zilina, Faculty of Operation and Economics of Transport.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
Port of Black Sea Regional Conference 31 st October 2007 CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration”
SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING AND RESULTS SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING.
Guidelines for transport in Europe and neighbouring regions
SEETO Investment Report 2016
Dr Mohaned Juwad Senior Manager – Spectrum Strategy Intelsat
PLANNING OF RAILWAY INFRASTRUCTURE IN THE CZECH REPUBLIC
United Nations Multilateral Conventions along the Silk Road
5th Regional TAF TSI Workshop SK, CZ, HU
Complete Streets: Making Connections
THE EIB’s ACTIVITIES IN POLAND
6th IRU Euro-Asian Road Transport Conference & Ministerial Meeting
Presentation by: Marios Miltiadou Greek Ministry of Transport
Baltic-Adriatic Corridor
Port Infrastructure Development for Ensuring Sustainability
NEW CONNECTION ROAD BETWEEN MOLDOVA AND ROMANIA
REPUBLIC OF ARMENIA Seoul, Korea September 2017.
RING OF CHISINAU AS PART OF TENT - NETWORK
Chisinau-Gurgiulesti Motorway, Construction of Comrat Bypass
Transport & Logistics Conference
»Invest in Montenegro. Invest in the Region «
Poland on the crossroads of transcontinental transport routes in the middle of Europe MINISTRY OF TRANSPORT OF THE REPUBLIC OF POLAND Warsaw, June 2007.
European Commission High Level Group
PRIORITY POJECTS OF THE TRANSPORT SECTOR OF THE REPUBLIC OF TAJIKISTAN
Republic of Moldova Ministry of Transport and Road Infrastructure
Jurij C. Kofner Research assistant, Advanced Systems Analysis Program
Presentation transcript:

Proposal for Financing Balti - Criva road sector rehabilitation Chisinau 2017

International importance of the M14 Criva – Balti–Chisinau–Tiraspol–Ukrainian border road Connection of the national network to the TRANS-EUROPEAN NETWORKS Transport (TEN-T)

International importance of the M14 Criva – Balti–Chisinau–Tiraspol–Ukrainian border road Connection of the national network to the MULTIMODAL CORRIDOR EUROPE - CAUCASUS - ASIA (TRACECA) – (Conference in Brussels, 1993)

International importance of the M14 Criva – Balti–Chisinau–Tiraspol–Ukrainian border road Infrastructure development and improving the connection with European Transportation Networks Euro-Roads (AGR) European Agreement on the great international roads (AGR) Republic of Moldova Law nr. 17-XVI, 10.02.2006

Designed sectors for rehabilitation of M14 road Length km Sector, km Cost, mil. Euro Number of lanes 39 591-630 31,9 2 Length, km Sector, km Cost, mil. Euro Number of lanes 32 630-662 23,5 2 Length, km Sector, km Cost, mil. Euro Number of lanes 33 662-695 42,4 4 Length, km Sector, km Cost, mil. Euro Number of lanes 31 695-724 35,8 4

Project technical specification The feasibility study was elaborated by NATHAN associates incorporate; According with feasibility study Internal Rate of Return (IRR) is 15.6 % and the project is feasible; Project documentation was elaborated by KOCKS ingenieure and Universinj SRL in 2012; For project implementation is not necessary land allocation; The project is included in the Transport and Logistics Strategy for 2013-2022 as a priority project; Rehabilitation of the M14 road is the priority project for Eastern Partnership.

Estimated traffic distribution 2012-2032 on M14 Criva-Balti sector Traffic distribution data is taken from Appendix I-A. Automatic Traffic Counts for 2009-2011 and Appendix I-B. Manual Traffic Counts for 2011 from Technical Report – road sector donned by and based on macroscopic computer model.

Typical cross-sections

Thank You for Attention Ministry of Transport and Road Infrastructure Republic of Moldova email: www.mtid.gov.md