Ministry of Civil Aviation

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
EServices Enablement Framework Session 4 RFP Composition.
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session 31 March 2014 Centurion.
ICAO Provisions for Safety Management
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
Department of Commerce Bureau of Industry and Security “EAR Regulatory Update” Arlington, Virginia June 10, 2008 Timothy Mooney Export.
Documents posted at QRIS 2011 Program Quality Improvement Grant RFP Bidder’s Conferences February & March 2011 Wendy Valentine Director,
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
Preparations for First Asian Ministerial Conference On Sendai Framework for DRR Presented in 1st IAP Meeting 3-5 June, 2015, Bangkok K.K.Pathak Joint Secretary.
Preparatory projects and funding opportunities 21 st April 2010 – Portrush, Northern Ireland Teresa Lennon and Michael O’Brien European Union European.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Background The Department has adopted an IRP with 42% target of electricity generation from renewable energy sources 03 rd August 2011 the Department.
TEMPUS INFORMATION DAYS Tajikistan, 18 November 2011 Alba-Chiara Tiberi, Project Officer EACEA TEMPUS IV- FIFTH CALL FOR.
Preparatory projects as tool for project development 4th February 2009 – Sundsvall, Sweden Maxi Nachtigall European Union European Regional Development.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
Tender Briefing Session COR34/2016
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
WP8 Project management Milan Gocić University of Niš
Interreg V B Adriatic-Ionian Seminar for Applicants
Draft Regional Connectivity Scheme (RCS)
Regional Connectivity Scheme Ministry of Civil Aviation
INITIATIVES TAKEN BY AAI UNDER
Key-points about the Mozambique One UN Fund experience
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Care at Home Framework Overview of the proposed framework 21 April 2017 Rose Hammond et al.
Intent to Apply/Pre-Application Guidance
Introductions and aims of today’s briefing
Regional Connectivity Scheme Ministry of Civil Aviation
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Fair Go Rates System Dr Ron Ben-David Chairperson
Funding schema to support public/private initiatives
TRAVEL SERVICES Request for Proposal
REGIONAL CONNECTIVITY PROPOSAL FOR HINTERLAND BIHAR
Transport (Civil Aviation) Department Govt. Of Jharkhand
GOVERNMENT OF TELANGANA in
National Hydrology Project
UDAAN : ADDITIONAL INCENTIVES IN ANDHRA PRADESH
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Security Equipment RAF/2012/00042 Compulsory Briefing Session
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session Centurion 31 March 2014.
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00029
Investing in Innovation (i3) Fund
Part C State Performance Plan/Annual Performance Report:
Auction of Coal Linkages for Non-Regulated Sector (Tranche IV)
Notification issued by Higher Education Department in November, 2014
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Fair Go Rates System Dr Ron Ben-David Chairperson
COHESION FUND MONITORING COMMITTEE
Civil Aviation Department, Government of Uttar Pradesh
APEC – SHINE Facility EWG53 – Singapore – April 2017
Technical Working Group meeting 21 March 2012 Brussels
ARGENTINA ENERGY INVESTMENT OPPORTUNITY
Regional Connectivity Scheme Ministry of Civil Aviation
Africa Centers of Excellence Project Financial Management
Enhanced transparency framework and examples of flexibilities
ARGENTINA ENERGY INVESTMENT OPPORTUNITY
Plan of Action-IV Meeting of Ministers and High Level Authorities on Social Development Septiembre 2017 February, 2019.
ARGENTINA ENERGY INVESTMENT OPPORTUNITY
DSG Governance Group Recommendations.
MEDIA PROGRAMME SUPPORT MECHANISMS TO THE AUDIOVISUAL EUROPEAN INDUSTRY Education, Audiovisual & Culture Executive Agency.
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

Ministry of Civil Aviation RCS - UDAN 3rd Round Pre-bid Meeting Ministry of Civil Aviation Government of India 06 November, 2018

01 02 03 04 Key features of UDAN 3rd round Inclusion of Tourism routes Following two rounds of successful bidding of routes under RCS across the country, the Ministry of Civil Aviation intends to conduct a third (3rd) round of bidding of additional routes to be awarded under RCS to Selected Airline Operator(s). Some of the features and benefits available under RCS have been updated for the 3rd round of bidding; the changes from 2nd round of bidding is as highlighted below: 01 Inclusion of Tourism routes 02 Inclusion of NER routes 03 Inclusion of Seaplane Operations 04 Exclusion of Helicopter Operations

Bidding Timelines S.N. Event description Timelines 1 Opening of window for 3rd Round of Bidding and commencement of Registration, adding of routes / network by the applicant (bidder) and submission of query if any, on MSTC e-bid portal 02/11/2018 2 Pre-bid meeting with Prospective bidders 06/11/2018 at 11:00 hrs 3 Last date and time of submission of query Up to 17:00 hrs on 09/11/2018 4 If required, release of Corrigendum / Final Bidding / Scheme Documents on e-bid portal; Up to 17:00 hrs on 14/11/2018 5 Date & time of submission of request by the applicant through e-bid portal of UDAN-RCS on MSTC’s website for the followings; stage length (in km) fixed wing aircraft for RCS Route(s) Up to 17:00 hrs on 20/11/2018 6 a. Last Date and time of validation of stage length by AAI Up to 17:00 hrs on 27/11/2018 b. Last Date and time of submission of revised networks / routes, if any, Note: This is an additional period provided to Applicants for revising their network/routes. Applicant can form networks/ routes considering only the routes for which stage length information was requested in the previous stage of the bidding process in a particular bidding round. Up to 17:00 hrs on 29/11/2018 Date of validation of revised networks/routes by AAI Up to 17:00 hrs on 03/12/2018 7 Due date and time for submission of Initial Proposals Upto 1700 hrs. on 10/12/2018 8 Date of opening of RCS route/network received in Initial proposals From 1100 hrs on 11/12/2018 9 Invitation for submission of Counter Proposals 19/12/2018 10 Due date and time for submission of Counter Proposals Upto 1700 hrs on 26/12/2018 11 Date and time of opening of Technical Bid for Initial and Counter Proposals From 1100 hrs on 27/12/2018 12 Date and time of opening of Financial Proposals (Initial and Counter) From 1100 hrs on 31/12/2018 13 Date of declaration of Selected Airline Operator and issue of Letter of Intent 07/01/2019 14 Furnishing of Performance Guarantee(PG), Additional Performance Guarantee(APG) (if, required and Signing of SAO Agreement) PG & APG if any, within 6 months of issue of Letter of Intent, readiness of airport(s) whichever is later or extended period accepted by implementing agency/MoCA.

Inclusion of Tourism routes under UDAN 3rd round Ministry of Tourism intends to enhance air connectivity to select tourist destinations in India Scope of UDAN Scheme has been expanded to include such routes as part of UDAN 3rd round Two (2) different kinds of routes, as proposed by the Ministry of Tourism, are available: Un-served routes connecting un-served / under-served airports (as per definition of RCS routes under the Scheme) Un-served routes connecting served airports (henceforth referred to as Tourism routes) For Tourism routes, the following exceptions will be applicable: Exclusivity of operations will not be available Airport concessions will not be available VGF support will be available and governed for these routes as per UDAN framework Funds for the VGF support for both kind of routes will be provided by Ministry of Tourism

Inclusion of NER routes under UDAN 3rd round Alliance Air currently operates certain routes in North-East Region based on an arrangement with DoNER The current tenure of award of such routes ends on 31 March 2019 Accordingly, the following routes have also been included in UDAN-3 : (i) Kolkata – Shillong. (ii) Guwahati – Lilabari. (iii) Guwahati – Tejpur. (iv) Guwahati – Passighat. RCS Condition for considering only the routes that have been non-operational for a period of one (1) year or more for the bidding process will be relaxed In order to provide continuing connectivity to the North Eastern region, these routes will need to be made operational from 01 April 2019 Funds for the VGF support for such routes will be provided by Ministry of Civil Aviation

Inclusion of seaplane operations The DGCA has recently allowed flight operations through seaplanes from Water aerodromes seaplane operations from the published list of Water aerodromes are also allowed under UDAN 3rd round seaplanes operations with the following types will be allowed under the Scheme from select Water aerodromes: Category 1A – seaplane with capacity <9 seats Category 1 – seaplane with capacity 9-20 seats The VGF per seat will be based on the fixed-wing aircraft for Cat 1 and Cat 1A RCS Condition for permitting Category 1A aircraft to operate only on Priority RCS Routes will be relaxed for seaplanes Proposals with seaplanes will be allowed only if either one (1) of origin or destination is a Water aerodrome in the route(s) submitted as part of route/network proposal

Prioritization Framework The Implementing Agency, MoCA and Ministry of Tourism (for routes suggested by them) shall consider prioritize/consider Initial Proposals for counter bidding based on the following parameters Availability of funds Readiness of the airports, Other parameters as already provided in the Scheme document Amongst similar proposals, the following routes will have higher priority Proposals with Priority RCS route(s) including the routes currently operated by Alliance Air Proposals with route(s) proposed by Ministry of Tourism that qualifies as RCS route(s) under the Scheme Proposal with Tourism route(s)

Other Key Changes Selected Airline Operators (SAO) who have not fulfilled their commitments under UDAN 1st round will not be eligible for bidding. RCS airports which were part of UDAN 1st round and routes/networks were awarded from/to these airports, but currently having erratic or no flight operations will be available for bidding under the Scheme. However, the RCS routes/networks which have already been awarded under UDAN 1st round from these airports will not be eligible for proposal submission, only new routes/networks will be allowed. Helicopter routes are not considered under this particular bidding round.

Bidding Mechanism The bidding mechanism shall remain same as UDAN 1 and UDAN 2 through a portal designed by MSTC for the specific purpose

Thank You!!