DORSETT HOTEL, PUTRAJAYA

Slides:



Advertisements
Similar presentations
1 HCFC Phase –out in Air Conditioning Sector Background, Challenges and Progress Sidi Menad SI AHMED 17 TH October 2012.
Advertisements

1 Mobilizing Available Funds To Destroy Ozone Depleting Substances.
Private companies and the UNIDO/GEF Project for HCFC phase out in the Russian Federation.
The Challenge: Moving Away From HCFC Refrigerants.
POLICY ON HFC IN SEYCHELLES Presented by Inese Chang-Waye National Ozone Coordinator.
INTERNATIONAL SCENARIO HPMP APPROVALS AND TECHNOLOGY.
Please take some time, and watch this short informative presentation about CFCs and their effects on the environment, and how we are changing.
Page 1 1 GTZ - Proklima HPMP Preparation for RAC Servicing Sector Results of the HPMP Sectoral Working Groups Meeting.
IMPLEMENTATION OF THE RMP: Technical Assistance Project ( ) UNDP/The Multilateral Fund of The Montreal Protocol National Ozone Unit Ministry of.
United Nations Development Programme Importance of Recovery & Reclamation and Retrofit Incentive Program Balaji Natarajan MPU-Chemicals Unit Sri Lanka.
R22 Phase Out Presentation To inform our customers of the single most important changes to the air conditioning industry in modern.
HFC WORKSHOP Agustín Sánchez Guevara Ozone Unit Coordinador.- México PARIS, FRANCE JULY 2014.
H F C M a n a g e m e n t W o r k s h o p, J u l y , P a r i sRoberto Peixoto - IMT Roberto A. Peixoto Maua Institute of Technology - IMT.
PREMHANS JHUGROO MINISTRY OF ENVIRONMENT& SUSTAINABLE DEVELOPMENT REPUBLIC OF MAURITIUS HFC WORKSHOP UNESCO HOUSE PARIS.
Richard Hosier Global Environment Coordination Unit World Bank.
ROADMAP FOR IMPLEMENTATION OF HCFC PHASE-OUT IN INDIA OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS.
1 IMPLEMENTATION OF MONTREAL PROTOCOL IN INDIA Ozone Cell Government of India Ministry of Environment and Forests.
Environmental Coordinating Unit Ministry of Environment, Natural Resources, Physical Planning and Fisheries.
1 ALTERNATIVE TECHNOLOGIES TO CFCs AND HCFCs OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS.
Montreal Protocol Implementation in Sri Lanka- Current Situation and HCFC Phase out challenges Dr W L Sumathipala Senior Technical Advisor Ministry of.
Update on alternative technologies and international developments in the Polyurethane Foams Sector.
Greening of Refrigerator & Room Air-Conditioner Industry in China
Institutional Arrangements for HCFC Phase-out G.M.J.K Gunawardana G.M.J.K GunawardanaDirector Promotion, Environmental Education & National Ozone Unit.
INDIAN INDUSTRY PERSPECTIVE ON PHASE DOWN OF HFC S REFRIGERANT GAS MANUFACTURERS ASSOCIATION (REGMA) INDO-US WORKSHOP ON HFCs 18 th February, 2011.
Mahendra Senevirathne Project Coordinator National Ozone Unit Sri Lanka 17 September
36th OEWG UNEP SIDE EVENT 22 J u l y , P a r i sRoberto Peixoto - IMT Roberto A. Peixoto Maua Institute of Technology – IMT Brazil Disclaimer: The.
Availability of Low-GWP Alternatives Options for Near Term & Longer Term Transitions OZONACTION NETWORK FOR LATIN AMERICA AND THE CARIBBEAN OCTOBER 6-8.
EPEE in Europe The full value chain: from producers through users to installers Small – medium – large size entreprises Over 200,000 direct employees.
Modelling Long Term Hydrofluorocarbon Emissions Contribution to India's Global Warming Impact Mohit Sharma Junior Research Associate Council on Energy,
RAC-NAMA - 1st Appraisal Mission
HFC Management by leakage reduction and recovery, and next actions for stepping forward. Tetsuji OKADA Japan Refrigeration and Air Conditioning Industry.
M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u l y , P a r i s 1 TEAP Replenishment Task Force Report Assessment of.
INDIA HPMP STAKEHOLDERS WORKSHOP OCTOBER 2011, NEW DELHI HPMP OVERARCHING STRATEGY.
Ijaz Hossain Chemical Engineering Department BUET
STAKEHOLDER MEETING ON HPMP PROGRAMME: HCFC PHASE OUT.
Maximising the climate benefits of the HCFC phase-out European Commission 36th OEWG, Paris, 20 July 2015 Lunch time Meeting: The EU amendment proposal:
1 OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS INDIA’S PERSPECTIVE ON PHASE DOWN OF HYDROFLUOROCARBONS (HFCs) UNDER THE AMBIT OF VIENNA.
Technical Options to HFCs for Mobile Air Conditioning (MAC) Indo-US Workshop on Hydrofluorocarbons 18 February 2011 David S. Godwin, P.E. U.S. EPA.
HPMP PREPARATION EXCOM POLICY AND ELIGIBILITY ISSUES AND INFORMATION REQUIREMENTS.
Ozone Depleting Substances & Fluorinated Greenhouse Gases.
Update on HPMP preparation Art. 5 and CEIT ECA Network meeting - May 18-22, 2009 Yerevan, Armenia.
INTRODUCTION TO THE MONTREAL PROTOCOL Liana Ghahramanyan NOU of Armenia October 2009 Budapest, Hungary.
Needs and Needs and Challenges related to the implementation of the Montreal Protocol in Republic of Serbia and priorities identified by Up-dated Country.
Seite MOP and ExCom Decisions on HCFCs Paul Krajnik Federal Ministry of Agriculture, Forestry, Environment and Water Management Chemicals Policy.
RMP IMPLEMENTATION IN ALBANIA Prepared by Prof.Gazmend Gjyli NOPIU-Albania MEETING ON RMP IMPLEMENTATION BELGRADE, SERBIA, SEPTEMBER 2006.
HPMP PREPARATION IN PROGRESS CONTACT GROUP MEETING ON CERTIFICATION OF REFRIGERATION SERVICE TECHNICIANS AND HPMP PREPARATION IN RUSSIAN SPEAKING COUNTRIES.
Opportunities to Leapfrog High-GWP HFCs when Phasing out HCFCs
Level 3 Air Conditioning Inspections for Buildings
KIGALI AMENDMENT TO THE MONTREAL PROTOCOL
HFC and Global Warming Presented by Mohammad Reazuddin
DISTRICT COOLING A promising and sustainable option for HFC phase-down
SURVEY ON HCFC CONSUMPTION IN ALBANIA.
Commercial Refrigeration Trends and challenges for RECS
. Level 3 Air Conditioning Inspections for Buildings
THIRD ANNUAL CO3OL WORKSHOP
Complete Phase-out of R22
Refrigeration Service Sector for energy saving, safety and the environment protection: Key activities for Art.5 Countries Paris - January, Madi.
Montreal Protocol HFC Management Workshop Paris July 2014
STAKEHOLDERS WORKSHOP ON HCFC PHASE-OUT MANAGEMENT PLAN (HPMP)
Achieving the HFC Phase-Down in Europe
DEVELOPMENTS FUNDS – A BORROWER’S PERSPECTIVE
Global Environment Facility (Prepared in September, 2011)
Chiller Energy Efficiency Project
Economy Updates on EE&C Policies & Programmes
Overview of Technical and Policy Challenges in meeting 2020 phase-out targets Annual 2017 Network Meeting of National Ozone officers of South Asia Countries.
ON ALTERNATIVES TO HCFC-141b IN PU FOAM MANUFACTURING SECTOR
CHALLENGES IN MEETING 2020 HCFC PHASE OUT TARGETS
Introduction to HPMP.
on RAC Servicing Sector - Leakage Control -
Surveys on ODS alternatives
Presentation transcript:

DORSETT HOTEL, PUTRAJAYA REFRIGERANTS REFRIGERANTS PHASE OUT: CHALLENGES AND OPPORTUNITIES IN MALAYSIA MALAYSIA HPMP STAGE 1: PILOT END-USER DEMONSTRATION PROJECT BY : SHAFIZAH JABAR BASHA DOE MALAYSIA DORSETT HOTEL, PUTRAJAYA 14 JUNE 2017

BACKGROUND Demonstration project under HPMP Stage 1 approved by MLF Objectives:To reduce ozone depletion substances and GHG emission through the installation of Zero-ODP and low-GWP refrigerant (R 744-CO2 refrigerant) for refrigeration unit in commercial sector Government and private sectors working together to phase out the use of fluorocarbon refrigerants.

CO2 DEMONSTRATION PROJECT Project Host: Trendcell Sdn Bhd Trade Name: Jaya Grocer Location: Mutiara Tropicana, Petaling Jaya Contractor: Coolcare (M) Sdn Bhd. Technology: Panasonic Japan Assisted funding by MLF Started : Dec 2016 Commisioned: May 2017 Can reduce CO2 emissions by 54.3% and cut power consumption by 12.8% a year compared to a freezer using R404A refrigerant.

CO2 DEMONSTRATION PROJECT The host company criteria are as follows: Should own and be a continuous operator of HCFC-based air conditioning or refrigeration equipment Be in a stationary business at the particular location since establishment Financially viable and have competent technicians Undertake to complete permanent retrofitting or replacement (as applicable) of the baseline HCFC-based air conditioning or refrigeration equipment and render inoperable, the replaced HCFC-based equipment (in case of replacement) Should undertake to provide free access to the retrofitted/replaced equipment to DOE/UNDP for demonstration or similar information dissemination activities, for at least 1 years.

THANK YOU