Saturday Nov Stop proton operation. Switch back to ions

Slides:



Advertisements
Similar presentations
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
LHC Status Report 1 Jan Uythoven For the LHC Team LPCC
Week 13: R. Assmann, J. Wenninger
LHC Status Fri Morning 3-June
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Saturday 30th June - Sunday: Rocky !
LHC Morning Meeting - G. Arduini
LHC Operation Week 41 Coordination G.Arduini, M. Lamont
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Mike Lamont, Jorg Wenninger
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Sunday morning Recovering from 400 kV disturbance.
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday – Morning Energy matching at injection with H CODs
Programme for Friday 9 July
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
HI2011 Commissioning Status
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Tuesday
Presentation transcript:

Saturday Nov 20 08.00 Stop proton operation. Switch back to ions Interlocks, thresholds, synchronisation etc 10.00 Both beams circulating 10.30 PS RF problem (80 MHz cavity. No beam for 1 hour) 11.30 – 13.00 RF capture optimisation 8:30 meeting

Orbits before any correction 8:30 meeting

Saturday Nov 20 13.30 Test ramp, 2 bunches per beam Ramp, squeeze, collide Also used for qualification of luminosity scan range TCTs in all IPs closed to 13 sigma 8:30 meeting

Bump at TCDQ Bump -1.2 mm TCDQ, beam 1 Bump +1.2 mm TCDQ, beam 2 8:30 meeting

Saturday Nov 20 Asynch dump test Fill for physics from 17.00 Filled the abort gap Were triggered by the SIS orbit for TOTEM (should be masked automatically with setup beam flag?) The abort gap was well filled by then however Fill for physics from 17.00 Bunch intensities some 30% down on those before the stop Emittances at 17.45 B1H 2.6 B1V 1.9 B2H 2.8 B2V 2.3 18.00 SPS RF problem (49 and 41 bunches in the machine) Measure emittance from time to time Emittances at 18.40 B1H 3.6 B1V 2.7 B2H 4.1 B2V 4.8 18.40 SPS RF OK, refill 19.30 PS RF problem (80 MHz cavity. No beam for 1 hour) 8:30 meeting

Physics Filling for physics from 20.30 21.50 Ramp 121 and 120 bunches 1 bunch missing for beam 2 (13461) in the last injected batch. We carry on now. Informed the experiments. It is OK for them. 21.50 Ramp 121 and 120 bunches 23.00 Stable beams. Initial lumis around 2 1025 Beams dumped by Op after ~ 7 hours Refill for physics Again 1 bunch missing/not seen Investigating … 8:30 meeting

Fill 1504 8:30 meeting

Beam size evolution through the fill 8:30 meeting