Lord Tennyson Elementary School

Slides:



Advertisements
Similar presentations
February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
Advertisements

Comparative Analysis Two Potential Sites for a New High School.
Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan.
Thompson Rivers University Operating Budget 2012– 2013 Senate Presentation April 2012.
Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Christchurch Town Hall November 27th, Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Board Update November 21, What is Tower Pinkster's Charge? 1.To assess the existing conditions of the Portage Public School Buildings and Sites.
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
Chapter 33 Foundation Systems.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
SHARON CITY SCHOOL DISTRICT Page 1 of 18. SHARON CITY SCHOOL DISTRICT Page 2 of 18 OPTION 1C – New Building on Case Avenue Site  Building Grades: K-6.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Long Range Facility Planning assisted by Silver Falls School District.
Walkerton Accommodation Review April 24, 2008 The following most recommended scenarios were reviewed by the Accommodation Review Committee.
Northwest ISD Lakeview Elementary School Additions and Renovations Lakeview Elementary School Additions and Renovations
DRAWING ON EXPERIENCE … BUILDING ON STRENGTH Six Storey Wood-Framed Buildings Unique Structural Opportunities & Challenges Kurt Ruhland, P.Eng. Director,
Development Committee School Usage and Building Recommendations Big Walnut School District Board of Education Meeting June 9, 2008.
Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.
AB Ellis Public School and Espanola High School Revitalization.
Proposed Sudbury West ARC OPTIONS Chair/Vice Chair Working Group June 2007.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
Facilities and Enrollment Task Force Modular Removal Planning Monday, February 4, 2013.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
Facilities Study Committee September 20, Meeting 1 Agenda Introductions Committee Makeup Parents Staff Community Members Goal Process Middle School.
FACILITIES MASTER PLANNING Committee Data and Findings.
West Hanover Elementary Classroom Availability May 18, 2015.
Tyler Junior College Critical Infrastructure & Renovation Update Spring 2010.
Sudbury West ARC Public Meeting #3 Wednesday, September 19, 2007.
Combined Public Consultation Treviglas Community College 3G Synthetic Pitch and Development of Colan Recreation Ground for NAFC.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
San Mateo – Foster City School District
Overview of MSBA Building Process and Project Timeline
Overview of MSBA Building Process and Project Timeline
Lord Tennyson Elementary School
Coffee Chat: LA COSTA MEADOWS Elementary school Construction update
2015 School Bond Construction Program
Addition of Fire Alarm system. None existing.
UPDATE: 8/8/2011 Batavia City School District
Capital Construction Bond Program
Funding Options What are your choices?
School #1 Ballot Question and Proposal
Capital Improvement in RUSD
Inspire Elementary School
Long Range Facilities Task Force
Downtown Core Parking Demand & Utilization Study Parking Management Advisory Board Meeting September 27, 2016.
Academy Transportation & Concept
Building Configuration Presentation
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
21st Century School Buildings Plan
Arlington Career Center: Programs and Campus Facilities
Wauwatosa School District
Community Forum March 19, 2018.
Davisville Junior Public School / Spectrum Alternative Senior School
Board Meeting Presentation February 20, 2018
Central Magnet Ace Team #8
Lockeford Elementary School Kindergarten Construction
Facility Partnerships Guideline Ministry of Education March 4, 2010
Pillager Public School District Community Survey Results
Chimacum District Facility & Program Plan
North Augusta High School – Phase 2A and 2B
Board of Education Meeting May 15, 2018
Where do you go from here?
SSUSD Richmond Elementary Status to Board of Education May 2, 2019
Board Meeting Presentation February 20, 2018
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

Lord Tennyson Elementary School PARENT ADVISORY COUNCIL 30 May 2016 Lord Tennyson Elementary School Seismic Upgrade Project

3 Option 1: Seismic Upgrade 4 Option 2: Full Replacement 5 Schedule PRESENTATION OUTLINE 1 Catchment & Capacity 2 Existing Buildings 3 Option 1: Seismic Upgrade 4 Option 2: Full Replacement 5 Schedule 6 Comparison of Options Lord Tennyson Elementary Seismic Upgrade Project

4 Option 2: Full Replacement 1 Introduction Option 2 Full Replacement Site plan with modular building removed (dashed red) Allowable area: 3,709 m2 reduced from 5,131 m2 total existing area Temporary accommodation not required Lord Tennyson Elementary Seismic Upgrade Project

siting diagram Lord Tennyson Elementary Seismic Upgrade Project Option 2 Full Replacement Capacity 60 kindergarten + 375 grades 1-7 Capacity to be capped at 2016 level of 452. Allowable area: 3,709 m2 (reduced from 5,146 m2 existing area) Temporary accommodation not required Lord Tennyson Elementary Seismic Upgrade Project siting diagram

construction phasing Lord Tennyson Elementary Seismic Upgrade Project 1 2 3 4 Lord Tennyson Elementary Seismic Upgrade Project construction phasing

kindergarten building considerations existing FDK building Opportunity to retain Kindergarten Building 20 spaces in existing Full Day Kindergarten building 15 spaces in existing wood frame building Lord Tennyson Elementary Seismic Upgrade Project kindergarten building considerations

5 Schedule 1 Introduction Lord Tennyson Elementary Seismic Upgrade Project

schedule Preliminary Project Schedule 17 months Design 21 months Construction Lord Tennyson Elementary Seismic Upgrade Project schedule

1 Catchment & Capacity Lord Tennyson Elementary Seismic Upgrade Project

catchment & capacity Lord Tennyson Elementary Seismic Upgrade Project operating capacity: 406 2014-15 enrollment: 434 utilization rate: 107% 10-year projected enrollment: growth (demand greater than capacity) Lord Tennyson Elementary Seismic Upgrade Project catchment & capacity

2 Existing Buildings Lord Tennyson Elementary Seismic Upgrade Project

existing building Lord Tennyson Elementary Seismic Upgrade Project school building play field kindergarten kindergarten Existing building 3-storeys  primarily non-combustible brick-clad building 3 wings constructed 1910-1957 wood-frame Kindergarten ancillary building #94B constructed 1926 full-day Kindergarten modular ancillary building constructed 2012 5,164 m2 total existing area Facility Condition Index data for all 2 buildings and site; note High FCI of 0.50 for the main building 3 storey masonry school, 5,164 m2, 1910-1957 (only building part of seismic upgrade project) 1 storey wood frame kindergarten, 1926 1 storey modular kindergarten, 2012 Lord Tennyson Elementary Seismic Upgrade Project existing building

ground floor & basement plan Lord Tennyson Elementary Seismic Upgrade Project ground floor & basement plan

seismic risk rating Lord Tennyson Elementary Seismic Upgrade Project 1914-2002 out-building moderate seismic risk 1958 block low to moderate seismic risk 1958 gym moderate seismic risk Option 1 Seismic Upgrade Seismic risk diagram showing 3 blocks as H1 highest risk. H1 = HIGHEST RISK extensive structural and non-structural seismic upgrades required no viable partial replacement option possible due to high risk condition and form of building Lord Tennyson Elementary Seismic Upgrade Project seismic risk rating

3 Option 1: Seismic Upgrade Lord Tennyson Elementary Seismic Upgrade Project

1 Introduction SPIR review Lord Tennyson Elementary Seismic Upgrade Project SPIR review

Seismic Upgrade Considerations Deferred Maintenance Costs would remain after seismic upgrade Temporary accommodation required (off-site) Lord Tennyson Elementary Seismic Upgrade Project seismic upgrade considerations

6 Comparison of Options 1 Introduction Lord Tennyson Elementary Seismic Upgrade Project

Option 1 Seismic Upgrade Option 2 Full Replacement Options comparison Deferred maintenance remains; aging building systems Temporary accommodation required during construction Shorter construction duration (18 months) Drop-off and pick up along West 10th Avenue Option 2 Full Replacement Meets project objectives. Complies with current codes and standards Temporary accommodation not required during construction Longer construction duration (21 months) No on-site play field during construction Lord Tennyson Elementary Seismic Upgrade Project Options comparison