Scrubbing progress - 08/12/2012

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
1 Pressure observations at TDI till fill 2158 V. Baglin (27/08/11) CERN TE-VSC, Geneva 1. 2.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
Joint LIU / HLLHC day -15 October 2015
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Electron cloud & vacuum pressure observations: 2011 proton run
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Summary of Week 49 Machine coordination: Jorg Wenninger & Jan Uythoven
Monday fill with 1092 bunches (6 h stable beams)
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Monday – recovery from MKI flashover
Wednesday 31 October: Morning
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 09/12/2012
Scrubbing progress - 10/12/2012
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC Operations overview Week 28 – Getting back
Friday 14th December - morning
Saturday – Morning 7:36 beams dumped
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
Saturday 3rd November - morning
IP8 aperture measurements (07:30-10:30)
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Fri :52 Stable beams fill #2536
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Coordination: Eva Barbara Holzer, Mike Lamont
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Friday 15th February - morning
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 10th December - morning
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Thursday 10:00 Fill 1986 in stable beams.
Tuesday
Presentation transcript:

Scrubbing progress - 08/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo, Cryogenics, EN-STI, Operation, Vacuum teams Machine Coordinators: J. Uythoven J. Wenninger 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 07:52 2748 bunches (B1) – 2316 (B2) Beam dump due to BPM LSS6 (low intensity on some of the bunches due to losses 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 13:01: Machine full! 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Very good progress but still emittance blow-up and losses. BSRT B1 now working (acquisition problem fixed – before averaged emittance instead of bunch by bunch emittance) 16.5 mm 3.3 mm 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 14:06 OP dump to refill as heat load decreasing as no more efficient scrubbing after peak of ~650 mW/m/aperture!! L. Tavian, G. Iadarola 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 14:30-17:53: Filling again with trains of 288 bunches up to 2460-2748 bunches. Beam dump due to ALICE trigger (UFO like event on the left side of ALICE). Pressure rise above 10-7 mbar on TDI even if retracted after every injection. More than 2.7x1014 p on B2, 2.3×1014 p on B1 (new record) Slight reduction in arc heat load. Sign of scrubbing? L. Tavian, G. Iadarola 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 18:00 Few mins after ALICE dump lost cryo conditions in Sector 81 matching section (fluctuations on 120 A current lead temperature – current lead “overcooling”) 22:45 Finally found regulation allowing to keep 120 A current lead temperature under control. Pre-cycle. 01:31 Injected up to 1164 bunches lost cryo conditions in the matching section R8. Still quite some activity visible 04:30 Start all over again… 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Got to 2028/2460 bunches dumped by losses on TCTVB.R8 (likely vacuum at TDI which is close to it) Few mins after lost the cryogenics conditions in point 8 MSR8. Cryo team checking 10/04/2019 LHC Morning Meeting - G. Arduini

Potential limitations: TDI TDI 4R8: There is a visible drift of some LVDT position readings (particularly left upstream - LU) since the first higher intensity 25 ns fill yesterday (06/12/12, 22:00). Peak yesterday evening at ~18:00. Indication of heating and deformation of the jaws. TDIs is moved out after every injection. A. Lechner 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Limitations: TDI TDI outgassing likely due to heating producing higher loss rates at TCTVB (close or above threshold – e.g. last dump)  limit total intensity in order to keep fill longer 10/04/2019 LHC Morning Meeting - G. Arduini

Limitations: cryogenics Limitation on the cooling of the beam screens of the stand-alone magnets and of some areas in point 6 and 8 where limited cooling power. This is presently limiting the pace of the filling process. Cryo team 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Limitations: MKI MKI has limited the scrubbing rate at the beginning. Not a limit now after increase of the pressure interlocks at the interconnects between MKID and Q5 from 1.5x10-8 to 4x10-8 mbar (M. Barnes). Extended soft starts during long stops due to cryogenics. Some activity on the temperature front during the afternoon evening. 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Plan Keep on scrubbing at 450 GeV Considering option of ramps at 4 TeV for tomorrow according to evolution of the heat load which is still high (profiting of the BCMS 25 ns beam which is now available from PS) 10/04/2019 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 10/04/2019 LHC Morning Meeting - G. Arduini

New record intensity at 450 GeV 10/04/2019 LHC Morning Meeting - G. Arduini

UFO observations (preliminary) 121 MKI UFOs so far (all below 1% of BLM dump threshold). About 70 of these at MKI.B5R8. With 50ns, below <30 MKI UFOs would have been expected. ARC UFOs: Beam 1: 3 arc UFOs in 9h15m with >1E14p. -> about 0.32 UFOs/hour Beam 2: 3 arc UFOs in 9h36m with >1E14p. -> about 0.31 UFOs/hour throughout 2012 with 50ns at 450GeV: Beam 1: 2 arc UFOs in 50h with >1000b -> about 0.04 UFOs/hour Beam 2: 4 arc UFOs in 36.5h with >1000b -> about 0.11 UFOs/hour Conclusion: Increased activity of MKI UFOs, particularly at MKI.B5R8, but amplitudes are far below BLM dump thresholds. For arc UFOs the statistics is extremely low, but could indicate an increased UFO activity with 25ns. T. Baer 10/04/2019 LHC Morning Meeting - G. Arduini