Training Presentation for:

Slides:



Advertisements
Similar presentations
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
Advertisements

Chapter 3 Project Initiation
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
1. Definition of a Reconciliation 2. Importance of a Reconciliation 3. When to Prepare a Reconciliation 4. Items Needed to Prepare a Reconciliation 5.
1 Welcome to the Colgate University Online Employment System Applicant Tutorial.
Change Management Process
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
GroupWise Tutorial What is GroupWise? GroupWise is an and calendar service (much like Microsoft outlook) for Collin College faculty and staff.
C-TPAT Security Link Portal Online Application. Online C-TPAT Application - Part 1. Part 1 of the Online C-TPAT Application process: Complete the Company.
1 of 4 Use Microsoft ® Office Communicator 2007 for secure Instant Messaging (IM) your Microsoft ® Exchange Server 2007, MSN, AOL, and Yahoo! contacts.
Welcome to the University of Florida Online Employment System Applicant Tutorial.
Welcome to the Alaska Statewide System Online Employment System Applicant Tutorial.
Mandatory Annual ACE Training Fiscal Year 2011 – 2012.
Achieving the Dream Leader College recognizes an institution’s impact in the effort to improve student success and eliminate achievement gaps nationwide.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
Mandatory Annual ACE Training Fiscal Year 2010 – 2011.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Serious Accident Investigation REPORTS. Lesson 12 Objectives Use a template to correctly fill out a 24-Hour Preliminary Report and list all the steps.
Microsoft Outlook 2007 Basics Distance Learning (860) 343 – 5756 Chapman 633/632 Middlesex Community College Visit
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
The Basics of the Effort Certification and Reporting Technology (ECRT) System.
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
NEW FOR 2009 Faster, Easier, Friendlier. Before you start Any student, staff, or faculty member can file an accident/incident report. Accident reporting.
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Vendor Bid System (VBS) Seminar. Agenda Vendor Bid System Overview Step-by-Step Advertisement Posting Editing Active Advertisements Recommended Practices.
Training Presentation for:
1 Memos and East Clarendon High School. 2 Using Templates  When you open a blank document in Word, you are actually working in a template called.
1 Procurement Operations Division (POD) Guidance for Telework and Work Schedules February 2016.
THE SIMPLE GUIDE: COMPLETING AN INJURY/ACCIDENT REPORT For KPBSD Staff Members.
SNG via Webinar. Where’s Webinar??  Double click Aflac 2000 folder  Highlight “SNGWebCommunicator”  Right Click and “Send To - Desktop”
Before we get started… A copy of today’s webinar slides will be posted to During the webinar, participants.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
Campus wide Ticketing Tool for UC Berkeley
DSQR Training Reliance System
Incident Reporting And Investigation Program
PearsonAccess EOC Training
AP Online Customer Support Help Desk - Kayako EBSC Bratislava Account Payables Customer Support and Invoice Query Resolution Teams.
Final Report.
Training Presentation for:
Please review these important Webinar Etiquette guidelines
Microsoft Outlook By: Phuong Nguyen.
6/11/2018 4:36 AM Services Course Outlook Live Participant Guide
Welcome to the Nevada Test Administration Training and Q&A Session
TRIP Approver Training
How to use the Salesforce Support Portal
Services Course 9/9/2018 9:54 PM Services Course Windows Live Hotmail Participant Guide © 2008 Microsoft Corporation. All rights reserved.
Mail Merge Instructions (Yanick’s Version)
Alabede, Collura, Walden, Zimmerman
New Mexico Emergency Operations Center (NMEOC) Basic ETeam Training
Reliance Supplier Corrective Action Process
Where We Are OVERVIEW Lesson 1: Course Overview
Incident Reporting And Investigation Program
Document Custodian of the Drop Safe Log
FAFSA-Apply Today! Presented by McDaniel College.
To the ETS – Encumbrance Online Training Course
Distributor Want aka. Dis-WAnt
DIGITAL ENCRYPTION INSTRUCTIONS FOR MICROSOFT OUTLOOK 2007
Project Name - Testing Iteration 1 UAT Kick-off
To the ETS – Encumbrance Online Training Course
Sanitary Sewage Overflow (SSO)
Training Presentation for:
5 Why Process/Guidelines
USF Research Integrity & Compliance
ISSUE MANAGEMENT PROCESS MONTH DAY, YEAR
Using AIM (for Registered Students):
Planning Services Meeting Client Communications
Presentation transcript:

Training Presentation for: BUPERSINST 5230.7 “Information Technology System Maintenance, Functional Degradation, Outage, and Urgent Situation Policy and Reporting Procedures” Last Updated – 16 Sep 10 BUPERS IMO Maintenance Coordinator (MC): LCDR Greg Taylor greg.taylor@navy.mil Alternate: Mr. Scott Pavelec scott.pavelec@navy.mil

Presentation Outline Purpose of BUPERSINST 5230.7 Types of Reports Scheduled Maintenance Availability Scheduled Outage Functional Degradation Dependency Outage Unscheduled Outage Urgent Situation Reporting Snapshot Templates Functional Degradation, Dependency Outage, or Unscheduled Outage After-Action, Root Cause Analysis Report Backups Functional PM Designation Letter Publishing your Certificates Definition Review

Purpose of BUPERSINST 5230.7 The purpose of BUPERINST 5230.7 is to keep the Deputy Chief of Naval Personnel informed of the status of all BUPERS IT systems. This task is performed via the Information Management Office Maintenance Coordinator (IMO MC), who relies on both the Functional Program Manager (PM) and the service provider to use the reporting processes outlined in the instruction. Definition of BUPERS IT System: For the purpose BUPERSINST 5230.7, a BUPERS IT System is any system registered in the Department of Defense (DoD) IT Portfolio Repository, Navy (DITPR-DON) that is functionally managed by BUPERS personnel, regardless of Budget Submitting Office (BSO), Mission Assurance Category (MAC), designated Mission Criticality, or physical location.

Types of Reports There are two monthly reports that the IMO MC is required to provide to DCNP: a scheduled maintenance report (SM) and an availability report. The SM report shows the planned availability of the IT systems, whereas the availability report shows what actually happened. Each report requires cooperation from the Functional PM and/or the System Service Provider (SSP) to ensure the data is correct. If an unexpected issue arises during the course of the month, the Functional PM and the SSP will coordinate to provide the IMO MC an additional email report, in the proper format, describing the circumstances and impact of the event. These additional reports can be one of the following, each of which is described in more detail in this presentation: Scheduled Outage Functional Degradation, Dependency Outage, or Unscheduled Outage Urgent Situation After-Action, Root Cause Analysis Report

Scheduled Maintenance Report Definition: Scheduled Maintenance is the amount of time that the system is planned to not be available to the customer recognized before the 15th of the preceding month. Person Responsible for Submitting the Report: IMO MC Report Sent to: DNCP Functional PM and/or SSP Action: Coordinate to provide the IMO MC with the information requested to build the report. The IMO MC will typically provide a draft report and solicit verification. The Functional PM and/or SSP will verify accuracy or provide corrected and/or missing information. Note: negative reports are required.

Availability Report Definition: Availability is the actual time that the system was available to the customer over the reporting month during the advertised period. The availability report includes other metrics relating to system availability. Person Responsible for Submitting the Report: IMO MC Report Sent to: DNCP Action: Functional PM and/or SSP coordinate to provide the IMO MC with the information requested to build the report. The IMO MC will typically provide a draft report and solicit validation. The Functional PM and/or SSP will validate accuracy or provide corrected and/or missing information. Note: negative reports are required.

Scheduled Outage Report Definition: A Scheduled Outage is the planned time that the system is not available to the customer, but is recognized after the 15th of the preceding month. Person Responsible for Submitting the Report: Functional PM or SSP Report Sent to: IMO MC, who in turn forwards it to DNCP Action: Functional PM and/or SSP coordinate to provide the IMO MC with an email report in the format found in Enclosure (1) at least 3 business days prior to the date of the planned outage (when possible).

Functional Degradation Report Definition: A Functional Degradation (FD) is when the system experiences a degradation in service which impacts normal operations. The degradation can either be internal or external to the system. Examples would be network latency issues (external) or a partial loss of functionality (internal). Person Responsible for Submitting the Report: Functional PM or SSP Report Sent to: IMO MC, who in turn forwards it to DNCP Action: Functional PM and/or SSP coordinate to provide the IMO MC with an email report in the format found in Enclosure (2) within 30 minutes of the degradation, or as soon as possible after knowledge of the degradation. Status updates will then be provided every 4 hours, when practical, until the problem is resolved. After Action: Functional PM and/or SSP coordinate to provide the IMO MC an after action report using the memorandum format provided in Enclosure (3). This report needs to be submitted NLT 5 business days after the date of correction.

Dependency Outage Report Definition: A Dependency Outage is when the system is not available to the customer in the planned "up window" due to the dependency on the availability of another system or service. Person Responsible for Submitting the Report: Functional PM or SSP Report Sent to: IMO MC, who in turn forwards it to DNCP Action: Functional PM and/or SSP coordinate to provide the IMO MC with an email report in the format found in Enclosure (2) within 30 minutes of the outage, or as soon as possible after knowledge of the outage. Status updates will then be provided every 4 hours, when practical, until the problem is resolved. After Action: Functional PM and/or SSP coordinate to provide the IMO MC an after action report using the memorandum format provided in Enclosure (3). This report needs to be submitted NLT 5 business days after the date of correction.

Unscheduled Outage Report Definition: An Unscheduled Outage the unplanned amount of time that the system is not available to the customer in the planned "up window" that is not due to the dependency on the availability of another system or service. Person Responsible for Submitting the Report: Functional PM or SSP Report Sent to: IMO MC, who in turn forwards it to DNCP Action: Functional PM and/or SSP coordinate to provide the IMO MC with an email report in the format found in Enclosure (2) within 30 minutes of the outage, or as soon as possible after knowledge of the outage. Status updates will then be provided every 4 hours, when practical, until the problem is resolved. After Action: Functional PM and/or SSP coordinate to provide the IMO MC an after action report using the memorandum format provided in Enclosure (3). This report needs to be submitted NLT 5 business days after the date of correction.

Urgent Situation Report Definition: An Urgent Situation occurs when a degradation or outage of a system is imminent due to an unexpected or unplanned factor. Person Responsible for Submitting the Report: Functional PM or SSP Report Sent to: IMO MC, who in turn forwards it to DNCP Action: Functional PM and/or SSP coordinate to provide the IMO MC with an email report in the format found in Enclosure (4) within 1 hour of identification of the imminent, degradation or unexpected outage.

Reporting Snapshot Preceding month Outage/ maintenance month Functional Degradation, Dependency Outage, Unscheduled Outage, or Imminent Situation Outage/ Maintenance Event Scheduled Maintenance Report Scheduled Outage Availability Report AAR 10 15 20 25 5 10 15 20 25 5 10 Preceding month Outage/ maintenance month Following month Red font indicates reports submitted by Functional PM/SSP Blue font indicates reports submitted by IMO MC with assistance from Functional PM/SSP

Template (Scheduled Outage) Digitally Sign and Encrypt message when practical. Send to BUPERS_IMOMC@navy.mil Cc any relevant personnel in management or the user community. Put “(FOUO) Scheduled Outage” in the subject line; do not put the system name or acronym in the subject line. Include system acronym in the message body. Include multiple outage windows if necessary. Ensure times are EST or EDT. Describe the details surrounding the outage. Describe the impact the outage will have on the business. POC information needs to be someone that can answer questions regarding the outage. FOR OFFICIAL USE ONLY (FOUO) SCHEDULED OUTAGE NOTIFICATION for: [System Acronym] DATE/TIME OF OUTAGE: YYYYMMDD HHMM EST/EDT DATE/TIME OF RESTORAL: YYYYMMDD HHMM EST/EDT ESTIMATED DURATION: [# of hours] DOWNTIME DESCRIPTION/CAUSE: IMPACT/SYSTEMS AND USERS AFFECTED: OTHER: POINT OF CONTACT INFORMATION: NAME: PHONE: E-MAIL: Click inside this text box to copy and paste this template to your email message

Template (Functional Degradation, Dependency Outage, or Unscheduled Outage) Digitally Sign and Encrypt message when practical. Send to BUPERS_IMOMC@navy.mil. Cc any relevant personnel in management or the user community. Put “(FOUO) Functional Degradation or Dependency Outage or Unscheduled Outage” in the subject line; do not put the system name or acronym in the subject line. Include system acronym in the message body. Ensure time is in EST or EDT. Describe the details surrounding the event; include estimated time to restoral. Describe the impact the degradation/ outage will have on the business. POC information needs to be someone that can be contacted at any time to answer questions regarding the degradation/outage. FOR OFFICIAL USE ONLY (FOUO) [Outage or Degradation type] NOTIFICATION for: [System Acronym] DATE/TIME OF OCCURRENCE: YYYYMMDD HHMM EST/EDT DESCRIPTION/CAUSE: IMPACT/SYSTEMS AND USERS AFFECTED: OTHER: POINT OF CONTACT INFORMATION: NAME: PHONE: E-MAIL: Click inside this text box to copy and paste this template to your email message

Template (Urgent Situation) Digitally Sign and Encrypt message when practical. Send to BUPERS_IMOMC@navy.mil. Cc any relevant personnel in management or the user community. Put “(FOUO) Urgent Situation” in the subject line; do not put the system name or acronym in the subject line. Describe the details surrounding the event; include estimated time of the beginning of the degradation/outage and the estimated time of restoral. Describe the impact the degradation/outage will have on the business. POC information needs to be someone that can be contacted to answer questions regarding the event. FOR OFFICIAL USE ONLY (FOUO) URGENT SITUATION NOTIFICATION for: [System Acronym] DESCRIPTION/CAUSE: IMPACT/SYSTEMS AND USERS AFFECTED: OTHER: POINT OF CONTACT INFORMATION: NAME: PHONE: E-MAIL: Click inside this text box to copy and paste this template to your email message

FOR OFFICIAL USE ONLY (FOUO) Template (After-Action, Root Cause Analysis) FOR OFFICIAL USE ONLY (FOUO) DD Month YYYY From: [System Name] Functional Program Manager To: Deputy Chief of Naval Personnel Via: BUPERS, Information Management Office, Maintenance Coordinator (BUPERS-07) Cc: [Other relevant personnel in the management or user community] Subj: AFTER ACTION REPORT/ROOT CAUSE ANALYSIS Executive Summary. Provide an executive summary of the incident to include what happened, factors contributing to the failure, corrective action, lessons learned, and plan to mitigate the probability/impact of future occurrences. Incident Synopsis. Describe the incident in detail, including exact times if known, and resulting consequences. Incident Analysis. Describe the methods used during the investigation – team interviews, timelines, fault tree analysis, etc. Include information about equipment, environment, management controls, process, and personnel as applicable. Findings. Describe the findings from the analysis performed. Corrective Action Taken. Describe the corrective action taken to resolve the problem. Lessons Learned. Use this section to highlight lessons learned and best practices that can be implemented to prevent the same problem from recurring in the future. Action Plan. Attach a plan of action and milestones as applicable detailing what, who, and when recommended changes will be implemented. Appendices. Provide supporting information as required. Click inside this text box to copy and paste this template to a Word document

Backups Functional PM Designation Letter Publishing your certificates Definition Review

Functional PM Designation Letter Click on the link below to open Reference (a), BUPERS CIO letter 5200. Enclosure (1) of this letter provides a list of Functional Program Manager designees and their POC information (Note: CAC is required) https://www.npc.navy.mil/NR/rdonlyres/B6BEB783-E12A-4D8E-A9F6-C2329CC8A335/0/DesignationofFunctionalPMsforBUPERSITSystems.pdf

Publishing your certificates Right-click on ‘My Certificates’ icon to get menu 2 Double-click on ActivClient Agent located in system tray (look down to the bottom right-hand-corner of your Desktop) 1 3 Click on ‘Make Certificates available to Windows’ Go to ‘Tools’ then ‘Trust Center’ in Microsoft Outlook Go to the ‘E-mail Security’ section and click on ‘Publish to GAL’ 4 5

Definition Review Scheduled Maintenance: Amount of time in hours that the system is planned to not be available to the customer recognized before the 15th of the preceding month. Functional Degradation: The amount of time in hours that the system experienced a degradation in service which impacted normal operations. The degradation can either be internal or external to the system. Examples would be network latency issues (external) or a partial loss of functionality (internal). Advertised Time Available: The total time in hours that the system was advertised to be available. This time is calculated by subtracting the SM time from total number of hours in the month. Advertised Percent Available: The percentage of the time that the system was advertised to be available to the customer over the reporting month. This percentage is calculated by dividing the system's AdTA by the total number of hours in the month. Actual Maintenance: Amount of time in hours that the system was actually down in the SM pre-planned maintenance window. Dependency Outage: The amount of time in hours that the system is not available to the customer in the planned "up window" due to the dependency on the availability of another system or service. Actual Time Available: The total time in hours that the system was actually available to the customer during the advertised period. This time is calculated by subtracting the SM, SO, UO, and DO time from total number of hours in the month. Scheduled Outage: Planned time in hours that the system is not available to the customer, but is recognized after the 15th of the preceding month. Scheduled Outage time only occurs in the advertised "up" window. Unscheduled Outage: The unplanned amount of time in hours that the system is not available to the customer in the planned "up window" that is not due to the dependency on the availability of another system or service. Actual Percent Available: The percentage of the time that the system was actually available to the customer over the reporting month. This percentage is calculated by dividing the system's AcTA by the total number of hours in the month. Actual Outage: Amount of time in hours that the system was actually down in the advertised "up window" to address the Scheduled Outage. Percent Availability: The actual percentage that the system was available to the customer over the reporting month during the advertised period. This percentage is calculated by dividing the system's AcTA by the AdTA (actual time/advertised time). Maximum is 100%.