Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.

Slides:



Advertisements
Similar presentations
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Advertisements

Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
UNC Review Group 0178 National Grid Distribution “Reclassification of SSP to Domestic only” Review Group Meeting – 22 February 2008 Chris Warner.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup Settlement Issues 1 st November 2011.
Mod 0428 Charge Impact October Affected Supply Point Population.
Topics Graduation and End of Term or Course
UNC Modification Proposal 0202 National Grid Distribution
xrn4361 UK Link Future Release 2
XRN4361 – UK Link Release 2 Data Migration Plan for XRN /03/18
Market Trials ChMC 8th August 2018.
Background - Tolerance Rules
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
Release 3 Plan Options Decision
Review Group 178 SSP as Domestic only.
Overall Project RAG Status:
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
DSC Change Committee Summary – 13th June
Change Management Committee – June 2019 Update
Assignment Workshop 2 16th September 09, Solihull.
R&N Timeline Release 2 Release 3 Feb-19 June-19
Change Management Committee – June 2019 Update
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Project Nexus Workgroup
DSC Change Budget 17th October 2018
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Change Management Committee – November 2019 Release Update
DSC Change Committee Summary – 11th July
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Release 3 Plan Options Analysis
DSC Change Committee Summary – 10th October
DSC Change Committee Summary – 9th May
XRN4361 – UK Link Release 2 - Delivery
Overall Project RAG Status:
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
XRN4790 – Introduction of winter read/consumption reports
Release 2 Scope Business Benefit Review
DSC Change Committee Summary – 9th January ‘19
June 2019 Release Scope DSC Change Management Committee
Overall Project RAG Status:
DSC Change Committee Summary – 13th March ‘19
Release 3 Update 07th March 2018.
Mod Proposal 0268 : AQ Backstop Date
Release 3 Scope Selection and Plans
DSC Change Committee Summary – 13th February ‘19
Further Credit Modification Proposals
XRN4249 – Part B Data Migration Plan
Overall Project RAG Status:
Overall Project RAG Status:
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
XRN June 19 Release - Status Update
Project Nexus Workgroup
Change Management Committee – November 2019 Release Update
Release 3 Update 07th March 2018.
Release 2 Baselined Customer Training Requirements
Change Management Committee – November 2019 Update
DSC Change Committee Summary – 7th March
Meter Reads.
Modification 440 Project Nexus iGT Single Service Provision
XRN June 19 Release - Status Update
DSC Change Committee Update
Proposal to issue first report in December 2018
High Level System Solution Impact Assessment
DSC Change Committee Update
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Overall Project RAG Status:
DSC Change Committee Update
Presentation transcript:

Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter Type Non-Prepayment Domestic Prepayment Domestic Non-Prepayment I&C Prepayment I&C

Considerations Following additional detailed design sessions and the issuing of the Detailed Design Change Pack, a number of considerations have been raised with DSG on 7th January EUC Naming Conventions CSEP Creations/Amendments Twin Stream Telemetered

EUC Naming Conventions The proposed naming conventions for EUC descriptions are as follows… LDZ:EYY01BND - Non-Prepayment/Domestic (e.g. EA:E1901BND) LDZ:EYY01BPD - Prepayment/Domestic (e.g. EA:E1901BPD) LDZ:EYY01BNI - Non-Prepayment I&C (e.g. EA:E1901BNI) LDZ:EYY01BPI - Prepayment I&C (e.g. EA:E1901BPI) LDZ:EYY02BND - Non-Prepayment Domestic (e.g. EA:E1902BND) LDZ:EYY02BPD - Prepayment Domestic (e.g. EA:E1902BPD) LDZ:EYY02BNI - Non-Prepayment I&C (e.g. EA:E1902BNI) LDZ:EYY02BPI - Prepayment I&C (e.g. EA:E1902BPI)

CSEP Creations/Amendments For CSEP creations/amendments, the EUC’s specified in the following inbound files “IGT/CSO CSEP Creation Request” (.CIC) file C80 (EUC Details) Record “IGT/CSO CSEP Amendment Request” (.CAI) file Will not change for bands 01 & 02 (EUC01B/EUC02B). However, to derive the max SOQ value at grid level (for creation, amendment and annual SOQ calculation) the system pulls aggregated Load factors that are maintained for each EUC profile. As a result, we are proposing that we do not keep and maintain the EUC01B & EUC02B bands (as we are replacing them with the new EUC profile bands), but instead assign a default EUC profile band in which to pull the required Load factors as per the below logic…  EUC01B - system should refer to domestic, non-prepayment EUC (LDZ:EYY01BND) load factors for calculating the Max SOQ EUC02B - system should refer to industrial, non-prepayment EUC (LDZ:EYY02BNI) load factors for calculating the Max SOQ

Twin Stream For Twin Stream Supply Meter Points, where multiple Meter Devices are present, additional rules are required to determine the EUC Meter Type (where they fall into EUC Band 01 or 02), the proposed rule for this is as follows… If all meter devices have been identified as Prepayment then the EUC Meter Type will be set as Prepayment, if any of the Meter Devices are defined as Non-Prepayment then the Prepayment Status will be set as Non-Prepayment.

Telemetered Telemetered Supply Points on UKL are set up with dummy devices and as a result an additional rule will be needed to determine the EUC Meter Type (where they fall into EUC Band 01 or 02), the proposed rule for this is as follows… For Telemetered Supply Points where a Dummy device is installed the EUC Meter Type will be set as Non-Prepayment.

ChMC required actions Approval to proceed with the logic outlined in the previous slides into delivery for… EUC Naming Conventions CSEP Creations/Amendments Twin Stream Telemetered