RS-485 Data Link Tester Team Members:Raymond Weber Lance Spotted Elk Sponsor:LED Effects.

Slides:



Advertisements
Similar presentations
Understanding Electrical TransmissionDemonstration B2 A Guide to the National Grid Transmission Model Demonstration B2 Generating electricity.
Advertisements

Why to learn OSI reference Model? The answer is too simple that It tells us that how communication takes place between computers on internet but how??
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
Chapter 2Test Specification Process. n Device Specification Sheet – Purpose n Design Specification – Determine functionality of design n Test List Generation.
Team Members:  Kyle Bloomer  Josh Geiman  Lucas Bennett Team Sponsor:  Dr. Cindy Harnett Team Mentor:  Dr. Andy Dozier.
CERTIFICATON EN Wireless Fire Detection.
CompTIA Network+ Chapter 2
I have almost 20 years experience in the components and devices used in industrial control, instrumentation and automation applications. Before I came.
Chapter 22 All About SCSI.
14 October 2004AME 470 – Team Unum PDR #6 – 14 October 2004 Electrical Components Chris Tilton Team UNUM.
Multidisciplinary Engineering Senior Design Automated Plasma Generator Test System Preliminary Design Review 11/11/05 Project Sponsor: MKS, ENI Incorporated.
Network+ Guide to Networks, Fourth Edition
Chapter 12: Troubleshooting Networking Problems Network+ Guide to Networks Third Edition.
CheckMeter 2.3 Portable Working Standard Page 1 March 2009.
CheckSystem 2.1 Portable Test Systems Page 1 April 2011.
Electrical Safety Testing of Electrical Installations and the verification of Electricians Test Tools Michael Bailey Transmille Ltd NCSLi 2014Transmille.
1  Module Type Overview  Construction  Characteristics  Installation principles  Details PD 600-Series.
SXBlue II GPS CHAPTER – I ABOUT HARDWARE AND SOFTWARE.
Technology Training that Works Hands of Data Communications, Networking & TCP/IP Troubleshooting.
Chapter 8 All About SCSI.
Baseboard Aavikkomursu 7.2. Aavikkomursu Micro- controller Extension port for programming microcontroller and sensor input Resistor RS485 interface chip.
Computers in Surveying SVY2301 / E4006 Automated Surveying.
Oppenheimer Technologies Rick King Jonathan Creekmore.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
SAE Formula Car Data Acquisition & Display System February 25, 2015 Advisor : Professor Steven Gutschlag Ahmed Albitar John Gertie Justin Ibarra Sean Lenz.
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 22 All About SCSI.
OBJECTIVE : To enhance the design of a zero-emission, low-noise snowmobile in order to provide the user with a safer and more reliable vehicle. Special.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
Objectives How Microcontroller works
Troubleshooting Tools Cable Performance Testers Voltage Event Recorders Butt Set Crossover Cable Tone Generator & Locator Multimeter Cable Continuity Tester.
SENIOR DESIGN 11/6. Lab update (time, difficulty) Writing update (interest)
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 43 – The Network Interface Card (NIC)
©Contrinex JDC PPT_LF_Interfaces Low frequency RS485 interfaces J.-D. Chatelain.
Phase Presence and Sequence Tester (FAST-1) Boris Fradkin 2015 A.L.F. Enterprise.
Bluetooth Controlled Robot USART communication. This project aims in wireless control of the robot from a bluetooth app in a mobile device through USART.
Line Coding, Modem, RS232 interfacing sequences.
GBT Interface Card for a Linux Computer Carson Teale 1.
EMERGENCY VEHICLE ALERT SYSTEM ECE 495C Digital Systems Senior Design Project Proposal Team #3 Spring 2008 January 09, 2008.
1 Chap. 3 Interface. 2 Interface  Physical connection between node and transceiver  Network interface card (NIC)  Physical connection between transceivers.
For Electric Vehicle Team Members Pramit Tamrakar - EE Jimmy Skadal - EE Hao Wang - EE Matthew Schulte - EE William Zimmerman - EE Advisor Ayman Fayed.
Wind Turbine Project Plan (Dec08-04) ‏ Lindsay Short Nick Ries Luke Donney Dario Vazquez Chris Loots Advisor: Dr. Ajjarapu Client: Dr. Aliprantis.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
Michael Lisoski Leblanc Meneses Jason Schaer Bryan Staton.
Bi-Directional RF Data Communication A Robot Control Device.
Samantha. What is it? –It is a Wi-Fi interface for the Lego Mindstorms –It replaces the Bluetooth connection for running matches It is mostly for running.
Soil moisture sensor sm-300. Contents Introduction Features SM300 working procedure Installation Calibration Specification.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
Unit 3 Physical Layer.
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Grounding.
Final Presentation Glass Break Detection Team
COMPUTER NETWORKS CS610 Lecture-11 Hammad Khalid Khan.
SmartCup – Team 42 Harington Lee, Chirag Patil, Arjun Sharma 1.
Autonomous Wheelchair Tyler Morton & Ben Hoerst Senior Design Advisor: Dr. Stanislaw Legowski Project Advisor: Dr. Steven Barrett ECE Senior Design.
Interactive Breadboard Spring 2013 Group 21 - Simon Huynh, Norman Lee, Harrison Hilgers TA Dennis Yuan, Professor Carney.
Self-Sustainable Electric Golf Bag Final Presentation Group 19 Jon Kinney, Cory Edwards, Harrison Kantner 30 April 2013.
Team Members:  Kyle Bloomer  Josh Geiman  Lucas Bennett Team Sponsor:  Dr. Cindy Harnett Team Mentor:  Dr. Andy Dozier.
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
Compute Node Tutorial(2) Agenda Introduce to RocketIO How to build a optical link connection Backplane and cross link communications How to.
P2 - Physics Mains Electricity
Power Budget Automation System Team #40 Hai Vo, Ho Chuen Tsang, Vi Tran ECE 445 Senior Design April 30 st, 2013.
Arduino Uno – controlling LED strips
AT Commands Supports AT commands
Grounding.
Site Controller Unit and Trunk Interface Unit
P2 - Physics Mains Electricity.
PLC Front Panel.
DIPLOMA In ELECTRICAL ENGINEERING DEPARTMENT OF ELECTRICAL ENGINEERING GOVERNMENT POLYTECHNIC COLLEGE, HANUMANGARH Sept A Training Presentation On.
Presentation transcript:

RS-485 Data Link Tester Team Members:Raymond Weber Lance Spotted Elk Sponsor:LED Effects

Purpose Design a roving data tester and a data source. Design a roving data tester and a data source. Test for correct wiring during the installation of LCD panels Test for correct wiring during the installation of LCD panels Check for wiring errors such as shorts, opens, as well as AC crosses Check for wiring errors such as shorts, opens, as well as AC crosses Verify correct DC Voltages are being supplied to the panels Verify correct DC Voltages are being supplied to the panels Check data transmissions by sending test patterns and verifying accuracy Check data transmissions by sending test patterns and verifying accuracy

Osaka Chanel Building Project that our design will be aimed at testing the cabling for initially

Other Buildings Hong Kong Chanel Building Macy's Holiday Display San Francisco The cable tester needs to be universal enough to be configurable for testing cabling on other projects

RS-485 RS-485 is a multidrop Low Voltage Differential Signaling (LVDS) standard regulating the electrical characteristics and not the protocol required. RS-485 is a multidrop Low Voltage Differential Signaling (LVDS) standard regulating the electrical characteristics and not the protocol required. By using LVDS, long cable runs with high throughput. This is achieved by sending the signal level as a difference in DC voltages. By using LVDS, long cable runs with high throughput. This is achieved by sending the signal level as a difference in DC voltages. There are a maximum of 128 devices on a RS-485 cable depending on the load per transceiver used. There are a maximum of 128 devices on a RS-485 cable depending on the load per transceiver used.

Project Requirements Roving Tester Requirements Roving Tester Requirements –Check Physical line characteristics Polarity, AC wire crosses, missing connections, DC supply voltages Polarity, AC wire crosses, missing connections, DC supply voltages –Communicate with Data Source Initiate data verification test sequence Initiate data verification test sequence –Collect, analyze, and display test results –Battery Operated –Universal Connector so it can be used in many projects with adaptors Data Source Requirements Data Source Requirements –Check for AC voltage –Wall Powered –Autonomous, and will send known signal when communicating with roving tester –Universal Connector

Project Deliverables Working Prototype Working Prototype Source Code Source Code Documentation Documentation –Project Documentation –Schematics –Operator Manual

Potential Solution Similar design for the Data Source but with reduced user interface

Macy's Holiday Display San Francisco